Executive Engineer (Civil), Construction Division, Gujarat Maritime Board, V C Fatak, Morbi
Third Party Inspection & Quality Assurance for the work of - Construction of Office Building and Residential Qtr. at Nalia
355349
10/2026-27
Open
Civil Works - Others
Works
Morbi
8 documents required · 8 mandatory
₹708
Executive Engineer (Civil), Construction Division, Gujarat Maritime Board, V C Fatak, Morbi - 363641
₹5,000
14 Oct 2026
14 Oct 2026
14 Oct 2026
28 Oct 2026
14 Oct 2026
Executive Engineer(C)
Construction Division
Gujarat Maritime Board
GUJARAT MARITIME BOARD
TECHNICAL BID DOCUMENT
Third Party Inspection & Quality Assurance for the work of “Construction of
Office Building and Residential Qtr. at Nalia”
1 Downloading of tender documents From date 14/10/2026 from 18.00 hrs.
2 On line submission of tender: Till date 28/10/2026 upto 18.00 hrs.
3 Submission of Tender fee Rs 600+108 From date 29/10/2026 & 06/10/2026 during
=Rs 708/- and other Documents during office hours in the:
office hours in physical form by OFFICE OF THE
RPAD/Speed Post only. Executive Engineer(C), Construction Division,
Gujarat Maritime Board, Char Godown, Near
V.C Fatak, Morbi.
4 On-line opening of tender On date 07/10/2026 at 12.00 hrs. (If possible)
Validity of offer: (180) days from the last date of online submission of tender.
No. Contents Page No
1 Notice Inviting Tender
2 Instructions to persons tendering
3 Scope of consultancy services to be
performed by the consultant
4 General conditions of contract
NOTICE INVITING TENDER
TENDER NOTICE NO- /2026-27.
Executive Engineer (C), Gujarat Maritime Board, PIU-Morbi, on behalf of Chairman of
the Gujarat Maritime Board, Gandhinagar invites tenders from the TPI agencies pre-qualified by
the GMB for “Third Party Inspection & Quality Assurance” for the below mentioned
Sr No Name of project Project Cost Earnest Tender fee in INR Time limit
value in INR Money
1 Third Party Inspection Rs. Rs. 5000/- 600=00 12 months or actual
& Quality Assurance for the 2,76,44,973.57 +GST 108=00 completion of Project
work of “Construction of Total Rs. 708/-
office building and Non-Refundable
residential Qtr.at Nalia.”
Eligibility and Schedule for tendering:
Further Details of this tender are as under:
1 Particulars: Construction of office building and residential Qtr.at Nalia
2 Downloading of tender documents (Start Date): From 14/10/2026 from 18.00 hrs.
3 Last date for downloading of tender documents: 28/10/2026 up to 18.00 hrs.
4 Last date of Online submission of bids: on 28/10/2026 up to 18.00 hrs.
5 Last date of submission of Hard Copy of DD for tender fee and other necessary documents: from
the date of submission of tender online i.e., 29/10/2026 to 06/11/2026 upto 18.00 hrs. By Regd.
AD / speed post only.
6 Online opening of Preliminary stage: 07/11/2026 from 12:00hrs onwards, if possible.
7 Opening of Price Bid: Price bid will be open on 07/11/2026 at 12:10 hrs. (If Possible)
Downloading Tender Document:
Bid documents will be available on web site https://www.nprocure.com up to Date shown
Bidders wishes to participate in this tender will have to register on web site
https://www.nprocure.com
8 Qualification criteria
8.1 The bidder must have experience in TPI/PMC work for any building structure
having a project cost of ₹1.00 Crore or above during the last five financial years
from any Central/State Government Department, PSU, Board, Nigam,
Corporation, or other Government organization. The bidder shall submit a valid
Experience Certificate issued by the concerned authority.
9 Digital Certificate:
Bidders who wish to participate in online tenders will have to procure / should have legally
9.1 valid Digital Certificate (Class III) as per Information Technology Act-2000 using which they can sign
their electronic bids. Bidders can procure the same from any of the license
certifying Authority of India or can contact (n)code solutions-a division of GNFC Ltd, who are
licensed Certifying Authority by Govt. of India.
9.2 All bids should be digitally signed, for details regarding digital signature certificate and related
training involved the below mentioned address should be contacted:
(n)code Solutions-A division of GNFC Ltd., (n)Procure
403, GNFC Info tower, Bodakdev, Ahmedabad-380054(India)
Reliance: +91-79-30181689
E-mail: [email protected]
Website: www.nprocure.com
9.3 Bidders who already have availed Digital certificate need not procure a new
Digital certificate.
10 On line Submission of Tender.
Bidders can prepare & edit their offers number of times before tender submission date & time.
10.1 After tender submission date & time, bidder cannot edit their offer submitted
in any case. No written or online request in this regard shall be granted.
Tenderer shall submit their offer i.e., Tender in Electronic format on above mentioned
10.2 Website & Date shown above after Digitally signing the same.
10.3 The bidder must have experience in TPI/PMC work for any building structure having
a project cost of ₹1.00 Crore or above during the last five financial years from any
Central/State Government Department, PSU, Board, Nigam, Corporation, or other
Government organization. The bidder shall submit a valid Experience Certificate
issued by the concerned authority.
10.4 Offers submitted without digitally signed will not be accepted.
11 Offers in physical form will not be accepted in any case.
12 Submission of Tender Fees and EMD:
Tender fee Rs. 708 (Rupees Seven Hundred and Eight only) by Demand Draft in favor of
12.1 “Executive Engineer Gujarat maritime Board, Morbi”, payable at Morbi from any Nationalized/
Scheduled Bank only.
12.2 FDR for Bid Security / EMD amounting Rs. 5000/-in favour of “Executive Engineer Gujarat Maritime
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid Security /
EMD shall be submitted in electronic format through online (by scanning) while uploading the bid,
this submission shall mean that bid document / tender fee and Bid Security / EMD has been
received. Accordingly, the offer of only those shall be opened whose Bid Document / Tender Fee and
Bid Security / EMD have been received electronically. However, for the purpose of realization of
Demand Draft, and FDR / Bank Guarantee bidder shall send the same in original through R.P.A.D. so
as to reach to Executive Engineer (Civil), Construction Division, Gujarat Maritime Board, V C Fatak,
Morbi - 363641 (Telephone No. 02822- 234465) (Fax No. 02822- 234465) within 7 Days from the last
day of bid submission
13 Following documents shall be submitted to the Tender opening authority Electronically through
Nprocure and physical copy in RPAD
13.1 a. Experience certificate the bidder must have experience in TPI/PMC work for any
building structure having a project cost of ₹1.00 Crore or above during the last five
financial years from any Central/State Government Department, PSU, Board, Nigam,
Corporation, or other Government organization. The bidder shall submit a valid
Experience Certificate issued by the concerned authority.
13.2 b. Pan Card Certificate
13.3 c. GST Registration Certificate
13.4 d. Tender fee DD
13.5 e. FDR for Bid Security / EMD
CV/bio data (qualification), experience (with experience certificate of the
employers) of Project Manager, Key Personals and Technical Assistant with
Tender document
In case bidder needs any clarification/assistance or if training required for participating in
online tender, they can contact at following office: -
(n)code Solutions-A division of GNFC Ltd.,
(n)Procure Cell,
403, GNFC Info tower, Bodakdev, Ahmedabad-380054(India)
Reliance: +91-79-30181689
E-mail: [email protected]
Website: www.nprocure.com
14 General instructions:
The fee for online tender document will not be refunded under any circumstances.
Tenders without Tender document fee in the form of DD, FDR for EMD and which do not
fulfill all or any of the conditions or submitted incomplete in any respect shall be
considered non-Responsive.
Conditional tender shall not be accepted.
The tenderers are advised to read carefully the "Instruction for Tenderer" contained in the
Tender documents.
The Internet site address for E-Tender is https://www.gmb.nprocure.com
The GUJARAT MARITIME BOARD reserves the rights to reject any or all tenders without
Assigning any reason thereof.
15 Opening of Technical Bid (Preliminary stage)
Opening of Preliminary stage bid documents will be held on 07/11/2026 from 12:00 hrs.
onwards in the office of Executive Engineer (C), Construction Division, Gujarat Maritime Board
Char Godown. Near V.C Fatak. Morbi-363641
Intending bidders or their representative who wish to remain present at GUJARAT
MARITIME BOARD premises at the time of tender opening can do so.
The offline technical evaluation of the tenders received on or before last date of
submission would be done and results will be intimated to tenderer.
Price bid of only those bidders would be opened online who are found to be eligible for
16 Contacting Officer:
Further details/clarification if any required will be available from office of Executive Engineer(C),
Construction Division, Gujarat Maritime Board, Char Godown. Near V.C Fatak. Morbi-363641
Consultant Executive Engineer(C),
Gujarat Maritime Board Morbi
GUJARAT MARITIME BOARD
INSTRUCTIONS TO PERSONS TENDERING
2.1 Bid document shall be duly filled and submitted in proper format provided by
the GMB. Incomplete offers shall be rejected.
2.2 The language for submission of bid shall be English.
2.3 Any other rules and regulations in connection with the contract not contained in
this document shall be followed as per PWD manual.
2.4 The applicant is expected to be aware of the project/site of TPI work before
submitting the Tender.
2.5 The Gujarat Maritime Board reserve the right to reject any or all the offers
without assigning any reasons and the Gujarat Maritime Board decision shall be
final and binding to all the bidders.
2.6 The pre-qualified bidders have deposited the EMD amounting to Rs. 50,000/-
with the GMB while submitting the application for pre-qualification. Hence, they
have not to pay EMD separately for this work.
2.7 Salient features of the project on which TPI is to be carried out by the consultant
are given at Appendix - II and memorandum showing the items and accepted
tender amount of the project is given at Appendix - III.
2.8 Price Bid Shall be submitted online only
2.9 The consultant, whose prices are accepted, shall have to enter into agreement
with the GMB. All the cost in this connection including cost of stamp paper etc
shall be borne by the consultant.
2.10 For any clarification, the Executive Engineer (C),……………………
mail………………... may be contacted.
2.11 Abbreviations / Phrases appearing in the contract document and meaning
thereof is as under:
Sr. No. Abbreviations / Meaning
1 Consultant The bidder performing TPI, QA & QC services
of the project work.
2 Client Gujarat Maritime Board
3 Contracting agency Main contractor of the project work
4 CE Chief Engineer
5 EE Executive Engineer
GUJARAT MARITIME BOARD
6 EIC Engineer-in-Charge
7 EMD Earnest Money Deposit
8 FDR Fix Deposit Receipt
9 GMB Gujarat Maritime Board
10 IS Indian Standards
11 KP Key Personnel
12 NDT Non-Destructive Test
13 PWD Public Works Department
14 PM Project Manager
15 QA Quality Assurance
16 QC Quality Control
17 RA bill Running Account bill
18 SE Superintending Engineer
19 TA Technical Assistant
20 TPI Third Party Inspection
1) “Bidder” means the qualified (empanelled) TPI agency of client (GMB).
2) "Bid Document" means all documents mentioned under the proposed contract.
3) "Certificate of Completions and Acceptance" means certificate issued by
Company stating that Contractor has satisfactorily performed the entire Scope of
work under the Contract and the scope of work added subsequently in
accordance with provision of the contract.
4) "Construction Schedule" means that sequence and plan of construction activity
as affecting or being included in the work which may be represented in drawing
indicating the Construction activity and completion as planned and which will
not be altered except with written consent of the client. The project Key Dates
as given by the Contractor and approved by client shall be termed as the
Construction Schedule.
5) "Contractor's Representative" means any personnel nominate by the Contracting
agency and notified in writing to the client to act on behalf of the contractor and
/or to perform the duties designated by the contractor.
6) "Contract Specification/Specifications" shall mean those Specification of the
works included or referred to in the contract agreement of the contract, Bidding
Document as well as those specifications relating to Industry Standards and
codes, and applicable to the performance of works as detailed in the
specifications affecting the work and performance of works as detailed in the
specification of this contract and any modification thereof or addition/deletion
thereto as may from time to time be furnished or approved in writing by the
client or any additional specifications required to be produced by the contractor
to meet the Design Criteria.
GUJARAT MARITIME BOARD
7) "Day" means calendar day of twenty-four (24) consecutive hour beginning at
0000 hours (midnight) and ending at 24:00 hours (midnight) as referred to local
time at the site.
8) "Drawings" means drawing included or referred to in the contract agreement,
Bidding Documents and any modification thereof approved in writing by the
client’s representative and any additional drawing which may from time to time
be ordered, furnished or approved in writing by the GMB or his authorized
Representative or required to be produced by the contractor as per the
provision of the contract.
9) ‘Third Party Inspection (TPI) agency’ means the successful bidder and to whom
this contract is awarded. Third party is other than GMB, Government or
contracting agency.
10) "Applicable Law" means the laws and any other instruments having the force of
law in India, as they may be issued and in force from time to time;
11) "Contract" means the Contract signed by the Parties, to which these General
Conditions of Contract are attached, together with all the documents listed in
letter of award (work order);
12) "Government" means the Government of Gujarat;
13) "Local Currency" means Indian Rupees;
14) "Party" means the Client or the Third-Party Inspection Agency, as the case may
be, and Parties means both of them;
15) "Services" means the work to be performed by the Third-Party Inspection
Agency pursuant to this contract for the purposes of the Project, as described in
16) "Approved / approval" means the approval in writing by the employer.
Consultant Executive Engineer (C)
GUJARAT MARITIME BOARD
SCOPE OF CONSULTANCY SERVICES TO BE PERFORMED BY THE
3.0 QUALITY OBJECTIVES
“This TPI/QA/QC services specify the ‘Quality management’ processes needed
for the construction activities conducted by the construction contractor engaged
by GMB for specific work/project.”
“To achieve ‘On time Completion of work/project as per Construction Schedule
using ‘Best Practices’ according to the IS for Quality.”
“To achieve the above Project Objective the Project Manager will expect Client’s
and Contractor’s project team members for its full co-operation and support for
3.1 TERMS OF REFERENCE
i) To provide services to GMB for monitoring complete quality on the work by
carrying out inspection, laboratory testing, quality audit, preparation and
verification of site records and any other means required in this connection.
Inspection of construction equipments deployed by the contracting agency in
order to assess their suitability for the work.
ii) To deploy required experienced Technical Personnel on the site for TPI, QA &
QC to ensure that quality on the work is maintained as per provision of
relevant IS codes and specifications of work.
iii) The TPI shall witness all tests conducted by the contractor as per the
prescribed frequency specified in the relevant codes, applicable standards,
and technical specifications. The TPI shall ensure compliance with the
applicable codal provisions and maintain proper records of all tests
witnessed, including test results, test reports, and relevant site records, for
verification and future reference.
iv) To provide services for review of design and suggestions for various sections
considered for the work as and when needed. To sort out any Technical
problem arisen during the course of execution and to give proper
v) Monitoring, Reporting, documentation, quality certification etc.
vi) To issue “Certificate of Completions and Acceptance" as regards satisfactory
quality of work at each RA bill/final bill, based on inspections.
vii) The consultant’s representative shall prepare, verify and sign all the
important registers and site records such as Cement Register, Steel Register,
GUJARAT MARITIME BOARD
Cube Testing Register, Level Books etc. pertaining to work maintained by the
GMB’s/contractor’s representative as per the prevailing GMB procedure.
viii) The selected TPI contractor has to perform the work of Third Party
Inspection, Quality Assurance and Quality Control of the work/project to
ensure the quality control and quality assurance of the entire work.
This may be detailed as
1) Ensure quality services acceptable to Indian standards, codes of practice
and job specifications.
2) Materials compliance verification and inspection.
3) To ensure that materials duly approved by the competent authority/EIC
are used in the work
4) Quality and acceptability of Materials and workmanship
5) Inspection of the Work by the concerned personnel at appropriate times.
6) Verifications of work in progress with respect to adherence to plans and
specifications/drawings.
7) Laboratory testing of construction materials and test samples. Associate
with work tests being carried out by Contractor and undertake additional
tests if required as necessary to assess the quality of material and
8) To ensure that all laboratory tests as laid down in the specifications are
carried out at appropriate time and materials failing to conform to the
required specifications are promptly rejected and removed from site.
9) As far as practicable, all tests on materials will be carried out at the
construction site in a field laboratory, which may be set up by the
contractor under the control of the EIC of the GMB and the work
manager of contractor (Contracting agency).
10) Supervision of precast and in-Situ concreting work etc.
11) Supervision of piling and pile concerting etc.
12) Supervision of material of fender and fender testing at the laboratory in
recognized laboratory or in the manufacturer’s testing machines.
13) Overseeing all welding processes and activities etc.
14) Supervision of water supply, drainage & firefighting network etc.
15) Attending the project review meetings which may be held at GMB head
office as well as at site also.
16) NDT tests if required
GUJARAT MARITIME BOARD
ix) The role of the Consultant is quality control (QC) checking of ongoing works
and quality assurance (QA) of work done. QC is undertaken by checking the
final assessment and ensuring compliance with the required criteria. QA is
undertaken by checking that the way the final assessment was conducted
was itself authentic and correct.
The Consultant should:
a) ensure that there is a uniform and consistent approach to and
application of the assessment process;
b) ensure that all assessors are assessing and applying competence
guidelines to the same standard;
c) provide support, advice and guidance to assessors;
d) ensure that all assessments and records are accurate and complete;
e) resolve problems with interpretation of performance criteria, range
statements or underpinning knowledge;
f) Make recommendations as required for appropriate improvements to
the contractor’s competence programme.
x) All materials, components, items including partly fabricated assemblies,
process items shall be identified with proper numbering, marking labels, tags
etc. It shall be ensured that the identification is maintained either on the
item or its record traceable throughout storage, fabrication, storage and
installation stages.
The Consultant shall be responsible for maintaining test result, reports, test
certificates, which shall indicate the item details (such as batch no., lot no.,
date of receipt) and also the inspection status, i.e. “Under inspection”,
“Inspected”, “Found OK” and “Inspected-Rejected”. The documents shall act
as product identification and traceability records.
QA Program includes elements such as:
a) Site Supervision, Sampling, testing, quality control and Documentation.
b) Tender and contract control (clauses relevant to TPI, QA & QC at site)
c) Calibration/verification of measuring and testing equipment
d) Non-conformance system with follow-up
e) Preventive action, Corrective action
f) Quality audits
The consultant shall submit the quality control and Quality Assurance plan
looking to work schedule B and shall be got approved by competent authority or
EIC it shall be submitted along with bid. The quality control and quality assurance
GUJARAT MARITIME BOARD
plan shall contain all necessary documentation, sampling, testing method,
calibration of testing equipment, non-conformity work system with fellow up
preventive action, corrective action, quality audit checks as per prescribed Indian
Standard method.
3.2.0 Only Experienced personnel shall be deployed at the work. Freshers shall not be
allowed. In general, role, minimum technical capability and experience of the
personnel deployed actually at the site for TPI work shall be as under…
No. Designation Role Minimum
qualification &
01 Project (a) Overall co-ordination of the TPI assignment.
Manager (b) Deploying appropriate personnel to undertake
(PM) the TPI assignment, effectively and efficiently. Post Graduate in
(c) Prepare and submit a Tailor made TPI Civil Engineering
Document with check list, proactive measures, with experience of
testing frequencies, precautionary measures years as PM
etc. for the particular work/project, for which
TPI service has been awarded by GMB OR
(d) To submit Monthly Progress Report in the
format approved by EIC. Graduate in Civil
(e) To Guide the Executive Engineer for matters Engineering with
related to Quality or stability. experience of
(f) Ensure clients satisfaction by providing years as PM.
services and deliverables as per contractual,
statutory and regulatory requirements.
(g) Client’s quality audit arrangements.
(h) Reduce rework and ensure quality of the
(i) Reduction in wastage of major construction
(j) Meet the requirement as listed in the scope of
(k) Maintain the integrity of the quality
management system.
(l) Meet effectively and efficiently the client’s
quality objectives and required consistent with
the strategy of the client.
(m) Attending the review meeting of the
work/project time to time at work site,
Division office or GMB head office as required.
GUJARAT MARITIME BOARD
02 Key 1) Sampling, testing and quality including Graduate in Civil
Personnel complete documentation and coordination Engineering with
(KP) with the contractor & TPI to be carried by him. experience of
2) Precise supervision of the work as per years as KP or
specifications, codal provision and TPI similar capacity.
document prepared by PM etc.
3) Conducting/witnessing field and laboratory OR
tests on materials, work etc.
4) Carrying out independent tests as may be Diploma in Civil
necessary. Engineering with
5) Apprising Executive Engineer or his Authorized experience of
Representative about the quality related years as KP or
matters in the work under supervision. similar capacity.
6) Maintaining the register of tests conducted
stating all relevant details
7) Visit to the laboratories for the test witness.
8) Visit to inspect quarry site for source approval
and submitting report.
03 Technical 1) Assisting Key Person in day-to-day TPI & QA Graduate in Civil
Assistant assignment along with monitoring and Engineering with
(TA) reporting for Quality and progress. experience of
2) Keep records for TPI assignment and above minimum two year
said tasks. in TPI
3) Follow up actions for the compliance of
instructions given by PM or KP for quality OR
assurance with reporting in case of lacuna or
deviation by the agency. Diploma in Civil
Engineering with
The consultant shall have to submit necessary evidence/supporting documents
to the EIC for his approval as regards qualification and experience of the
personnel deployed for the work while commencing the task.
3.2.1 Minimum number of key personnel and technical assistants for engagement in
work shall be as approved by the Engineer-in-Charge of the project.
3.2.2 Above personnel shall be approved with their names by the Engineer-in-Charge,
before employing them in work. This selection will be made on the basis of
nature and quantum of work. The personnel so approved shall only be allowed
to work on the site.
GUJARAT MARITIME BOARD
3.2.3 It is almost possible that a number of projects/works may be in progress
simultaneously at the different port locations by the same consultant.
Accordingly, the consultant shall have to manage the services of required site
personnel to fulfill their needs at different sites.
3.2.4 Other technical personnel/Administrative Graduates required for office work
and preparing reports etc shall perform their duties in the consultant's office
situated anywhere in Gujarat.
3.2.5 The Project Manager will be overall in charge of all the project work and he is
supposed to keep in contact with the EIC for successful completion of the
assignment. He is supposed to work in his office of company situated anywhere
in Gujarat and should be available as and when called by EIC/GMB
representatives. He should be approved by the EIC before appointed for the
3.2.6 No changes in approved technical personnel shall be made by the consultant
without approval from the Engineer-in-Charge.
The consultant shall submit necessary biodata of person to be engaged for work
along with bid. It contains Aadhar card, PAN card, qualification experience proof.
The same KP & TA shall not be allowed to work at another project site. The
minimum number of key personnel and technical assistant define as per project cost
and mentioned in the clause.
The necessary biodata of project management along with qualification and
experience shall be submitted to GMB and after approval he shall be engaged in the
In addition to this the consultant shall submit PF copy, PAN card, Aadhar Card of
personnel engaged to the department.
The attendance register for key personnel and T A shall be maintained at site. For
project manager the site visit register shall be maintained.
The TPI shall ensure deployment of the following personnel and adherence to the
minimum site visit frequency specified below:
Sr. No. Personnel Minimum Visit Frequency / Requirement
1 Technical Assistant Shall be available at site during the progress of work.
2 Key Personnel At least once a week.
3 Project Manager At least Once a Month or as required, depending on the
nature and progress of work.
GUJARAT MARITIME BOARD
Note: The Engineer-in-Charge may revise the above frequency in consultation with the
consultant, considering the quantum, duration, nature and requirements of the work.
The decision of the Engineer-in-Charge shall be final and binding.
3.2.7 The bidder has to submit the justification of the rates submitted if requested.
3.3 The Services provided by the consultant shall be inclusive of following:
(a) Remuneration to the personnel
(b) Offices’ hire charges.
(c) Traveling expenses of the personnel.
(d) Lodging and Boarding expenses of the personnel.
(e) Periodical reporting / documentation.
(f) Communication.
(g) Any contingency expenditure in connection to perform the assignment.
(h) All statutory taxes including local and state/central government taxes shall
be borne by the consultant excluding GST on the Service provided which
shall be governed as per stipulation made under prevailing Act/rules.
3.5 Site Visits & Visit Schedule:
3.5.1 The Consultant has to inspect the work at all stages during execution, depending
upon the nature of work. As for example…
1. For road works: He has to visit during mobilization, earthwork, sub-base
courses, base courses and pavement layers etc.
2. For Buildings: He has to visit during foundation setting/layout,
excavation, RCC footings and other items in plinth, Ground floor RCC
construction, first floor and subsequent floor RCC construction, masonry,
plastering, flooring, doors, windows and finishing items etc.
3.5.2 Frequency of visits:
Sr. No. Personnel Minimum Visit Frequency / Requirement
1 Technical Assistant/Site Continuous supervision of work Shall be available at site
Engineer during the progress of work.
2 Key Personnel At least once a week.
3 Project Manager At least Once a Month or as required, depending on the
nature and progress of work.
GUJARAT MARITIME BOARD
However, the Engineer-in-Charge with his discretion may alter the above
frequencies in consultation with the consultant on the basis of quantum,
duration, need and nature of works in progress.
Monthly visit schedule for the project has to be decided by the consultant in
consultation with the concern EE/DEE in charge of the project. Same shall be
circulated by the concern EE to the SE (C) and EE(C), QC Division, GMB,
3.5.3 During visit of quality control team of GMB, if any defect in the work as per
agreement is found,10% amount of the Consultant fee shall be deducted from
the Consultant’s fee to be paid by GMB and Consultant can be blacklisted from
the empanelment of TPI.
3.6 Reporting requirement:
3.6.1 The consultant shall submit to the employer 5 copies of each of the following
reports for the work. The language of reports shall be ENGLISH. These outputs
shall be on hard copy. The reports shall be prepared using MS WORD/MS EXCEL,
on the format prepared by the consultant and as approved by the
GMB/Engineer-in Charge.
Sr. Particulars of report No. Of Frequency
1 Project work detail study 5 • Once
and requirement report. • Within two weeks from the
commencement of services for the work.
2 Monthly Inspection and 5 • At the end of every month
progress reports
3 Final completion report 5 • Once
(including certification of • Within 15 days after completion of the
inspected project/works) contract work.
1.0 Project work detail study and requirement report:
The Consultant has to submit:
• Item wise material testing and cube testing detail schedule as per frequency of
norms and IS code.
• Site visit schedule by TPI agency, Quality assurance plan.
• Preliminary assessment of potential difficulties, if any and their mitigating
• Design review requirement if any.
GUJARAT MARITIME BOARD
• Test requirement through Govt. Labs, Govt. approved labs and field testing in
this schedule. All tests should be carried out in the presence of consultant
representatives and results should be certified by the consultant.
• Item wise required list of machinery used in the project work site for proper
workmanship with line and level of the work.
• Required list of instruments used for line level and proper measurement of
particular items of the project work.
• Details of his KP and TA which shall be control this project like his education,
experience of the completed projects and project nearby residence address with
proof and contact details.
• Any more information as deemed necessary.
2.0 Monthly Inspection and progress reports:
• Item wise measurement shall be taken by consultant (TA) in the presence of
concern DE and representative of constructing agency.
• Measurement shall be recorded in the measurement book (MB) by consultant
(KP) as per work executed at the site day to day and shall be 100% checked by
concern DE with verification by concern Executive Engineer.
• Received all testing results shall be certified by consultant and concern DE.
• For maintaining site register like cement register, steel register, level book
register and other relevant registers like visit register, attendance register, TPI
engineer shall assist GMB site engineer and both engineers shall sign it with
checking by DEE.
• Bar bending schedule (BBS), as per the approved working drawings shall be
checked by TPI agency.
• Details of events and main activities undertaken during the period, inspection
report of ongoing work and progress of work with respect to work program.
• Technical and quality audit reports, checking of site records maintained by the
supervisory staff etc.
• Material testing, quality certification etc.
• Any problem met with during the course of execution, analysis and solution
• Issues related to machineries, plant and equipment to be provided by the
contracting agency, if any.
• Consultant has to produce photographs of important activity were used of
important machinery/equipment and instrument for batter line level and quality.
GUJARAT MARITIME BOARD
• Before completion of hidden activity, consultant has to submit photographs of
progressive activities such as reinforcement details of raft foundation, piling
• Any more information as deemed necessary.
3.0 Final completion report with certification of all necessary documents:
• Consultant has to submit all testing results duly certified by representative of
consultant and concern EIC/DE as per frequency of norms or as per IS code.
• Consultant has to submit item wise variation statement of the work.
• Consultant has to submit item wise excess and saving details with justification of
• Consultant has to submit extra items details with justification of the work.
• Material testing and certification, NDT carried out, conformity with the relevant
IS Code or work specifications.
• Inspection report of over all work.
• Problems encountered during construction.
• Recommendation to the GMB for similar projects/works in future.
• Consultant has to submit certified completion drawings of the completed project
One copy of report duly verified by Consultant, Concerned DEE(C) and
Concerned EE (C) shall be submitted to EE (C), QCD.
3.6.3 A “Register of Visits” by the TPI consultant/representative shall be maintained at
the site in prescribed proforma as may be finalized from time to time, in which
date wise visits along with activities carried out by the TPI representatives and
their remarks if any shall be mentioned clearly. The same shall be signed by the
TPI representative, contracting agency’s representative and EIC of GMB. Reports
to be prepared under clause no 3.6.1 shall be based on the observations made in
this Register of Visits.
3.6.4 Laboratory, Field testing, Survey equipment:
i) Laboratory testing of materials/samples in required frequency as per IS
provisions/work specifications shall be obligatory to the contracting
agency and all the cost in this regard, either in government laboratory or
government approved laboratory including transportation of samples
shall be borne by the contracting agency. TPI consultant shall not have to
bear this cost. However, he is responsible to see that all the sampling
done by the contracting agency are as per IS provision/norms.
GUJARAT MARITIME BOARD
ii) The TPI consultant shall assist GMB/Contracting agency for survey &
leveling work etc.
iii) All machinery and equipments for NDT testing if required as per IS
provisions or in case of doubtful value obtained in routine testing shall be
arranged by the TPI consultant at his cost.
Consultant Executive Engineer (C)
GUJARAT MARITIME BOARD
GENERAL CONDITIONS OF CONTRACT
4.1 General Provisions
4.1.1 Law governing the contract.
This contract, its meaning and interpretation and the relation between the
parties shall be governed by the applicable law.
This contract has been executed in English, which shall be the binding and
controlling language for all matters relating to the meaning or interpretation of
Any notice, request or consent required or permitted to be given or made
pursuant to this contract shall be in writing.
4.1.4 Locations
The services shall be performed at such locations as are specified in the tender
document or as the client may approve.
4.1.5 Taxes and Duties
(a) The consultant shall pay GST, duties, fees and other impositions as may be
applicable excluding service tax.
(b) Any other taxes, levies, imposed by Govt. of Gujarat and Govt. of India from
time to time will be chargeable to consultant.
4.2 Commencement, completion, suspension and termination of contract.
4.2.1 Commencement of services.
The consultant shall begin carrying out the services from the date of
commencement as stipulated in the work order issued to him.
4.2.2 Suspension
The client may by written notice of suspension to the consultant suspend all
payments to the consultant hereunder if the consultant fails to perform any of
their obligations under this contract, including carrying out the services,
provided that such notice of suspension (i) shall specify the nature of failure and
(ii) shall request the consultant to remedy such failure within a period not
exceeding 15 days after receipt by the consultant of such notice of suspension.
GUJARAT MARITIME BOARD
4.2.3 Termination
The client, after serving not less than 30 (thirty) days written notice of
termination to the consultant, may terminate this contract:
(a) If the consultant fails to remedy a failure in the performance of their
obligations hereunder, as specified in all notice of suspension pursuant to
clause no. 4.2.2 above.
(b) If the consultant become in solvent or bankrupt.
(c) If the consultant fails to comply with any final decision reached as a result of
arbitration proceedings.
(d) If the consultant, in the judgment of the client has engaged in corrupt or
fraudulent practices in completing the contract. Termination of the contract
may disqualify the consultant for bidding for other GMB projects.
(e) The jurisdiction for arbitration shall be Gandhinagar or the District pertaining
to the project work.
4.2.4 Completion of the Project:
The stipulated time limit for completion of the TPI services under the tender is
12 months. However, since the consultant’s fees are percentage-based and
linked to the progress of the project work, the consultant shall continue to
provide TPI services until the actual completion of the project work by the
contracting agency, without any additional payment by GMB beyond the
accepted consultancy fee. Liability on Quality:
The consultant is responsible to ensure complete quality of work executed. If
quality of any part of work is proved inferior anyhow during execution or after
completion of project, it shall be treated as the consultant’s failure in his
obligations and accordingly action shall be taken as per clause 4.2.2 & 4.2.3
mentioned above. Moreover, all the payments due to the consultant and his
deposits kept with different EICs pertaining to various works at different work
sites of GMB assigned to the consultant, along with EMD kept at GMB,
Gandhinagar shall be forfeited; and the consultant shall be barred forever to
participate in any TPI empanelment onwards.
4.3 Obligations of the Consultant.
4.3.1 Standards of performance
The consultants shall perform the services and carry out their obligations with
reasonable due diligence, efficiency and economy, in accordance with generally
accepted professional techniques and practices, and shall observe sound
management practices, and use appropriate advanced technology and latest
equipments, testing machineries and methods. The consultant shall always act,
in respect of any matter relating to this contract or to the services, as faithful
GUJARAT MARITIME BOARD
advisers to the client, and shall at all times support and safeguard the client
legitimate interests in any dealings.
The consultants shall perform the services in accordance with the applicable law and
shall take all practicable steps to ensure that any sub-consultants as well as the
personnel of the consultants comply with the applicable law. If the contract is within
purview of EPF act, then consultant is required to submit the details of EPF code to
4.3.2 Law governing services
The consultants shall perform the services in accordance with the applicable law
and shall take all practicable steps to ensure that any sub-consultants as well as
the personnel of the consultants comply with the applicable law. If the contract
is within purview of EPF act, then consultant is required to submit the details of
EPF code to GMB.
4.3.3 Consultant not to benefit from commissions discounts etc.
Consultants shall not except for their own benefit any trade commission,
discount or similar payment in connection with activities pursuant to this
contract or to the services or in the discharge of their obligations hereunder, and
the consultants shall use their best efforts to ensure that any sub-consultants, as
well as the personnel and agents of either of them, similarly shall not receive any
additional remuneration.
The consultant and/or his personnel shall not disclose any confidential
information relating to the project/work, the services, the contracts or the
client's business or operations without the prior written consent of the client.
4.3.5 Insurance to be taken out by the consultant.
The consultant shall take out and maintain at their own cost, insurance against
the risks and for the coverage as mentioned below, for the period of
(a) Third Party motor vehicle liability in respect of motor vehicle used by the
consultant or his personnel.
(b) Workers compensation insurance in respect of personnel of the consultant.
(c) Insurance against loss or damages to the consultant's property used in
performance of services and any documents prepared by the consultant.
4.3.6 To provide all necessary formats for quality control acceptable as per Indian
Standard /PWD procedure for respective works to be provided in advance to the
Engineer-in-charge.
GUJARAT MARITIME BOARD
4.3.7 The consultant shall make no correspondence directly with the contracting
agency of the project/work or he shall give no instructions/suggestions directly
to the contracting agency. He shall convey such issues to the authorized
representative of GMB only.
4.3.8 Delay in reporting:
Time shall be the essence of the contract. If the reporting as mentioned in clause
3.6.1 is delayed at any stage, Gujarat Maritime Board will recover liquidated
damages not amounting to penalty (excluding service tax) of the sum equivalent
to 0.2% per day, of the total consultancy amount accepted by the Gujarat
Maritime Board which may be up to a ceiling of 10% of the total consultancy
amount (excluding service tax).
4.3.9. If any personnel employed on work by the consultant misbehaves with GMB’s or
contractor’s representative, he shall be removed from the site with a written
order by the EIC and shall be prevented to engage anywhere at any work in GMB
by such circular.
4.4 Obligations of the client
4.4.1 Assistance
The client shall provide the consultant and his personnel with work permits and
such other documents as shall be necessary to enable the consultant or
personnel to perform the services.
4.4.2 Access to land
The client warrants that the consultant shall have free of charge, unimpeded
access to all land in his premises in respect of which access is required for
performance of the services.
4.4.3 Data, services and facilities
The client shall provide to the consultant free of charge the following:
(a) Copy of detailed engineering design and estimates of TPI work.
(b) Copy of contract documents containing conditions of contract, contract
specifications, BOQ and drawings etc.
In consideration of the services performed by the consultant under this contract,
the client shall make to the consultant such payments and in such manner as is
provided by clause 4.9 of General Conditions.
4.5 Bonds and guarantees for performance security
On issue of the Acceptance letter, the consultant shall provide "performance
security" within 10 days of issue of Acceptance letter equivalent to 5 % of the
GUJARAT MARITIME BOARD
contract amount of consultancy services in the standard Performa in favour of
GMB NON PLD A/c. This shall be applicable to each individual project/work
assigned to the consultant failing in which, same shall be considerable to
rejection of bid.
4.5.1 Bank guarantee shall be obtained in following format.
GUJARAT MARITIME BOARD
STAMP PAPER WORTH OF
Rs.100/- (NON-JUDICIAL)
FORMAT OF PERFORMANCE BANK GUARANTEE
PERFORMANCE BANK GUARANTEE
1.0 In consideration of the __________________________________, which
expression shall unless repugnant to the context or meaning thereof be deemed to
include their successor interest and assigns on the one part having awarded the
deployment works in favour o having registered office at
(hereinafter referred to as the CONTRACTOR), which expression
shall unless repugnant to the context or meaning thereof include its successors,
administrators, representatives and assigns, on the other part, by signing an agreement
..............................................on hereinafter referred as the AGREEMENT
the execution of the works on terms and conditions set out interalia in the AGREEMENT
mentioned above as “CONTRACT” documents valued at
) the same having been unequivocally accepted by the CONTRACTOR
and the CONTRACTOR having agreed to provide a performance bank guarantee for the
obligations/liabilities under the contract equivalent to 10% of the said value of the
Contract to the Gujarat Maritime Board amounting to Rs. (Rupees
) as Contract security in the form of a Bank Guarantee.
2.0. We hereinafter referred to as ‘The Bank’ which expression, shall unless repugnant
to the context or meaning thereof, include its successors, administrators,
representatives and assignees do hereby irrevocable guarantee and undertake to pay
The Gujarat Maritime Board. ON DEMAND WITHOUT any previous notice and without
any demur and without referring to any other source, any and all monies payable by the
CONTRACTOR by reason of any breach by the said CONTRACTOR of any of the terms and
conditions of the said CONTRACTOR including non-execution of the “CONTRACT
AGREEMENT” to the extent of 10 % of the Contract price Upto
GUJARAT MARITIME BOARD
. Any such demand made
by the Gujarat Maritime Board on the Bank shall be conclusive and binding absolute and
unequivocal not withstanding any difference between the Gujarat Maritime Board and
the CONTRACTOR or any dispute or disputes raised/pending before any court, tribunal,
Arbitrator or any other authority.
The Bank agrees that the guarantee herein contained shall continue to be enforceable
till this sum due to the Gujarat Maritime Board is fully paid and claims satisfied or till the
Gujarat Maritime Board discharges this guarantee.
3.0 The Bank further irrevocably guarantees and undertakes to pay any and all
monies due and payable by the CONTRACTOR by reasons of non-fulfilment of any of the
following obligations.
3.1. In the event of failure by the CONTRACTOR to satisfactory execute the works
meeting the schedule and in complying with the provisions of the agreement.
4.0. The Gujarat Maritime Board shall have the fullest liberty without affecting in any
way the liability of the Bond under this guarantee, from time to time, to extend the time
of performance by the CONTRACTOR. The bank shall not be released from its liabilities
under these presents by any exercise of Gujarat Maritime Board of the liberty with
reference to the matter aforesaid.
5.0. The Gujarat Maritime Board shall have the fullest liberty, without affecting this
guarantee to postpone from time to time the exercise of any powers vested in them or
of any right which they might have against the CONTRACTOR and to exercise the same
at any time in any manner, and either to enforce or to forbear to enforce any covenants
contained or implied in the agreement between GUJARAT MARITIME BOARD and the
CONTRACTOR or any other course of remedy or security available the GUJARAT
MARITIME BOARD and the bank shall not be released of its obligations / liabilities under
these presents by any exercise by GUJARAT MARITIME BOARD of his liberty with
reference to the matters aforesaid or any of them or by reasons of any other act of
forbearance or other acts of omission or commission on the part of GUJARAT MARITIME
BOARD or any other indulgence shown by GUJARAT MARITIME BOARD or by any other
matter or thing whatsoever which under law would, but for this provision, have the
effect of relieving the Bank Guarantee. The Bank further undertakes not to revoke this
guarantee during its currency without the previous consent of GUJARAT MARITIME
GUJARAT MARITIME BOARD
6.0 The Bank further agrees that the decision of GUJARAT MARITIME BOARD as to
the failur4e on the art of the CONTRACTOR to fulfil their obligations as aforesaid and/or
as to the amount payable by the Bank to GUJARAT MARITIME BOARD hereunder shall
be final, conclusive and binding on the Bank.
7.0. The Bank also agrees that GUJARAT MARITIME BOARD shall be entitled at his
opinion to enforce this guarantee against the Bank as a principal debtor, in the first
instance not withstanding any other security or guarantee that it may have relations to
the CONTRACTOR’S liabilities.
8.0. This guarantee will not be discharge due to the change in the constitution of the
Bank or the CONTRACOR.
9.0. Notwithstanding anything contained hereinabove, our liability under this bank
Guarantee shall not exceed Rs.
Bank guarantee shall be valid upto
It is a condition to our liability for
Payment of the guarantee amount or any part thereof arising under this bank guarantee
that we receive a valid return claim or demand for payment under this bank guarantee
on or before , failing which our liability under this bank guarantee will
Automatically cease.
(Signature with name in block letters and with designation) (Printed Name)
(Signature with name in block letters and with designation)
GUJARAT MARITIME BOARD
4.6 Force Majeure
4.6.1 Definition
For the purpose of this contract, "Force majeure" means an event which is
beyond the reasonable control of a party, and which makes a party's
performance of its obligations here under impossible or so impractical as
reasonably to be considered impossible in the circumstances, and includes, but
is not limited, to acts of God, war (declared or undeclared), riots, civil disorder,
(a) Within the power of the party invoking force majeure to prevent,
confiscation or any other action by Government agencies.
(b) Force majeure shall not include (i) any event which is caused by the
negligence or intentional action of a party employees, nor (ii) any event
which a diligent party could reasonably have been expected to both (A)
take in to account at the time of the conclusion of this contract and (B)
avoid or over come in the carrying out of its obligations hereunder.
(c) Force majeure shall not include insufficiency of funds or failure to make
any payment required hereunder.
4.6.2 No breach of contract.
The failure of a party to fulfill any of its obligations here under shall not be
considered to be a breach of or default under, this contract in so far as such
inability from an event of force majeure, provided that the party affected by
such an event has taken all reasonable precautions, due care and reasonable
alternative measures, all with the objective of carrying out the terms and
conditions of this contract.
4.6.3 Consultation
Not later than thirty (30) days after the consultant or GMB, as the result of force
majeure, have become unable to perform their contractual obligation under this
contract, the parties shall consult with each other with a view for agreeing on
appropriate measures to be taken in the circumstances.
4.7 Arbitration
That in the present tender, board is already getting security deposit as bank
guarantee and looking to the fact that the amended arbitration act of 2015 has a
fee schedule which makes arbitration proceedings expensive, I’m of the opinion
that we may exclude arbitration altogether and let the parties approach civil
court as that would be cost effective. However, if the board is of the view that
arbitration clause is required to be incorporated, the same may include the
following wordings-:
Single member arbitral tribunal
GUJARAT MARITIME BOARD
In case a dispute or difference of any kind whatsoever, arises out of or relates to
the contract, between the parties to the contract, it is a term of the agreement
that before invoking arbitration, the aggrieved party refer the matter to (. for his
decision / mediation to be carried out
By _____ / the senior management of both companies for negotiations/dispute
resolution board to consist of_________).
On the failure of the procedure prescribed above or if a party is dissatisfied with
the decisions/recommendations aforesaid, and notwithstanding anything eke
contained elsewhere in the agreement, a party to the agreement may refer to
arbitration to be conducted by (resident person to be nominated by
/ A person to be mutually decided by the parties) to adjudicate upon the
aforesaid disputes and differences that have arisen between the parties. Pending
submission of and/or decision on a dispute or difference as aforesaid or until the
arbitral award is published, the parties shall continue to perform all of their
obligations under this Agreement without prejudice to a final adjustment in
accordance with such award.
The decision of the arbitrator arrived at after hearing the parties shall be final
and binding upon the parties. The arbitration proceedings shall be conducted in
accordance with the Arbitration and Conciliation, 1996 or / any statutory
modifications or re-enactments thereof. It is also agreed by the parties that the
arbitration proceedings shall be conducted in English language. The venue of
arbitration shall be___________and any proceedings arising out of this contract
shall be subject to the jurisdiction of________court.
4.8 Sub-contract
The consultant shall not be permitted to assign the work to any sub-consultant.
4.9 Payment for consultancy services.
Payment to the consultant shall be done at his accepted tender rates and as per
following terms.
4.9.1 Consultant's services are linked with the execution of the particular project work.
Consultancy fees depend upon the amount of work executed on the basis of
accepted tender rates of the contracting agency.
4.9.2 Total amount of consultancy fees shall be payable on the basis of total actual
4.9.2 Total amount of consultancy fees shall be payable on the basis of total actual
amount of the project work considering the quantities of various items actually
executed on completion of the project by the contracting agency. Thus, the basis
for payment of the consultant's fees shall be the actual total amount of the
for payment of the consultant's fees shall be the actual total amount of the
project work considering variation in quantities as per actual execution and not
the accepted tender amount of the contracting agency.
4.9.3 Considering the above, the consultant's fees shall be paid as under:
GUJARAT MARITIME BOARD
a. 90% of consultancy fees shall be paid on the basis of payment of each bill
to the contracting agency of the project work after getting quality
assurance certificate.
b. Remaining 10% shall be paid within 30 days after acceptance of the final
completion report by the GMB as submitted by the consultant
mentioned under clause no.
4.10 Miscellaneous
4.10.1 Modification
Modification of the terms and conditions of this contract may only be made by
written agreement between the parties.
4.10.2 All monitory references and payments herein shall be in Indian Rupee Currency.
4.10.3 Authorized Representatives
Any action required or permitted to be taken, and any document required or
permitted to be executed under this contract by the client or the consultant may
be taken or executed by the officials specified as below:
A For client Executive Engineer (C), Morbi
B For consultant ……………………………………..
4.10.4 The Addresses for correspondence are:
(a) For the client office of Executive Engineer(C),
Construction Division, Gujarat
Maritime Board, Char Godown. Near
V.C Fatak. Morbi-363641
Tel. No. Phone No.
E mail [email protected]
Website http://www.gmbports.org
(b) For the Consultant ………………………………….
Consultant Executive Engineer (C)
GUJARAT MARITIME BOARD
GUJARAT MARITIME BOARD
Name of Work: Third Party Inspection (TPI) & Quality Assurance for the work of
“Construction of Office Building and Residential Quarters at Nalia.”
PRICE BID — SCHEDULE-B
To be submitted online
Description Amount / Rate
1 Estimated Project Cost (₹) Rs.
TPI Fees as a percentage of the Project Cost (to be % Of Project COST (To be
quoted by the Consultant) submitted online
3 Total TPI Fees (₹) ₹ ---------
1. The Consultant shall quote the TPI fees as a percentage of the estimated project
2. GST on the services provided shall be paid extra as per prevailing norms, upon
submission of the original challan evidencing payment of the said tax to the
Government of India.
GUJARAT MARITIME BOARD
Name of work: - Third Party Inspection & Quality Assurance for the work of
“Construction of office building and Residential Qtr. at Nalia.”
SALIENT FEATURES OF THE PROJECT ON WHICH TPI TO BE CARRIED OUT BY THE
The construction work consists of following components/ structures.
➢ Construction of B category staff quarters
➢ Construction of C category staff quarters
➢ Construction of Office Building
➢ Construction of sump and pump room
➢ Construction Of Chokidar Room
➢ Construction of compound wall of surrounding GMB land
➢ Construction of Road & general area development in GMB land.
➢ Plumbing Work
Copy of BOQ of the work for all component is attached with the bid document.
GUJARAT MARITIME BOARD
Memorandum showing items to be carried out as per accepted tender of the work.
Item Estimated Item of work Tendered Rates Unit Amount
In In words (Rs.)
NOTE: As per separate sheet attached
(Memorandum showing items of works to be carried out)
1. Total Tendered amount Rs
2. Rebate on above tendered amount if anyRs.00=00
3. Net accepted tendered amount (1 - 2) Rs.
GUJARAT MARITIME BOARD
DETAILS OF EVENTS & PROGRESS DURING PERIOD (To be submitted monthly by TPI agency)
Sr. No. ACTIVITY/ITEM Qty. as Unit Status Qty. Executed Workmanship Observatio
NO. per of Prev. Up ns/Remark
tender Work Month's to s/
Note: In addition, progress report may also be incorporated in form of Bar Chart with respect to
GUJARAT MARITIME BOARD
Compliance to the observations of TPI Agency (To be submitted by EIC before
each RA/Final bill of works)
Name of Contractor:
Name of TPI Agency: Month:
Sr. Observations of TPI Compliance by Certification Remarks
No. Agency Contractor by EIC
GUJARAT MARITIME BOARD
DETAILS OF TPI AGENCY'S PERSONNEL DEPLOYED AT WORK (To be submitted monthly
Name of TPI Month:
Sr. Name of Designation Qualification Experience Whether Remarks
No. Personnel of of Personnel of meeting the
Personnel personnel criteria as
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical bid - Nalia quarter.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .