Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.9 L+₹1.1 L (7.13%)Rejected-AOC NOT AVAILABLE | L2 | Rejected-AOC L2 | |
| 3 | L3₹17.9 L+₹2.1 L (13.5%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | MANDIL ANIL KUMAR L2 | SYDHICK A T L3 | O RAMESH L1 |
|---|---|---|---|---|---|---|
| 1.00CULVERT | ||||||
| 1.00 | 2.7.A:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br> (A) Rubble Stone Masonry in Lime Mortar | 18.7 | cum | 540.28 ₹10,103.24 | 572.61 ₹10,707.81 | 504.34 ₹9,431.16 Lowest |
| 1.00 | 2.5.2.B:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (II) By Mechanical Means <br>(B) Reinforced Cement Concrete | 9.6 | cum | 1,361.27 ₹13,068.19 | 1,442.72 ₹13,850.11 | 1,270.72 ₹12,198.91 Lowest |
| 1.00 | OD351881/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 118 | hour | 412.66 ₹48,693.88 | 437.35 ₹51,607.3 | 385.21 ₹45,454.78 Lowest |
| 1.00 | OD351876/2025-2026:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 0.6m
bottom width 1.2m height 1.0 m side and filling in between with earth to form ring bund and
maintaining the same leak proof till the completion of the work and clearing the site by
dismantling the bund after completion of the work.etc.complete. | 15 | metre | 520.47 ₹7,807.05 | 551.62 ₹8,274.3 | 485.86 ₹7,287.9 Lowest |
| 1.00 | OD358290/2025-2026:Coconut pile Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour for fixing staging platform and all other appliances necessary for pile driving down after pointing the bottom end details for one post of 6m long 15 numbers per day 6*15=90 details for 90m lengtyh | 75 | metre | 213.56 ₹16,017 | 226.34 ₹16,975.5 | 199.36 ₹14,952 Lowest |
| 1.01 | OD358291/2025-2026:Coconut pile Supplying and stacking well matured straight coconut post for driving down through various strata below bed level including cost of conveyance labour charges etc complete | 75 | metre | 115.72 ₹8,679 | 122.64 ₹9,198 | 108.02 ₹8,101.5 Lowest |
| 1.01 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 54.64 | cum | 58.08 ₹3,173.49 | 61.55 ₹3,363.09 | 54.22 ₹2,962.58 Lowest |
| 1.01 | OD344752/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 30.98 | cum | 3,615.23 ₹1,11,999.83 | 3,831.56 ₹1,18,701.73 | 3,374.77 ₹1,04,550.37 Lowest |
| 1.01 | OD351896/2025-2026:DR with Dept. stone - Dry rubble masonry - Dry rubble without concrete levelling course using departmental rubble including packing of compactness to lines and levels , labour charges etc. complete as per direction of Dept. officers at site. | 13.09 | cum | 1,553.36 ₹20,333.48 | 1,646.31 ₹21,550.2 | 1,450.04 ₹18,981.02 Lowest |
Tender Value
₹19.5 L
EMD Value
₹48,713
Closing Date
31 Oct 2025, 6:00 pmClosed
Municipal Engineer
LID EW Section , Municipal Engineer, Shornur municipality
Shornur Municipality Annual plan 2025 2026arani iccons karakkadthodu culvert maintananceproject no 370 2025 26 Ward 10
2025_LSGD_814645_6
07/AE/LID and EW/SRR/7th Phase
Open Tender
Civil Works - Roads
Item Rate
Shornur Muncipality Ward 10
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹48,713
Yes
19 Nov 2025
25 Oct 2025
1 Nov 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1362921.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.03 MB
Tendernotice_2.pdf
PDF • 0.13 MB
Tendernotice_3.pdf
PDF • 0.12 MB
aranisbd.pdf
Tender Documents • 3.82 MB
aranipreliminary.xls
Tender Documents • 1.40 MB
araninit.pdf
Tender Documents • 0.07 MB
aranniaffidavit.pdf
Tender Documents • 0.11 MB
BOQ_1362921.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .