| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L Quoted ₹5.2 L | L1 | Accepted-AOC awarded to lowest bidder |
| 2 | L2₹5.6 LRejected-Finance | ₹5.6 L | L2 | Rejected-Finance OTHER THAN LOWEST |
| Sl No | Description | Qty | Unit | Tehal Dass L2 | MAYA RAM L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth up to a lead of 20 Mtrs in pick work, Jumper work and Blasting work in all leads and lifts. | 12.82 | cum | 650 ₹8,333 | 600 ₹7,692 |
| 2.00 | Excavation in foundations trenches etc. (for pipes and pits ) upto all depths in all kinds of soil such as pick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited in all leads and lifts including trimming and dressing of sides levelling of bed to correct excavation and returning the stacked soil after laying jointing and testing of G.I.Pipes in trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting/timbering and dewatering where ever required including restoration of un-metalled/metalled paved surface of its original conditions including cost of diversion for traffic night signals fixing caution boards and fencing etc.complete in all respects. | 21.11 | Cum | 825 ₹17,415.75 | 800 ₹16,888 |
| 3.00 | Providing and laying cement concrete 1:3:6(1cement:3 sand:6 crushed stone agg.40mm nominal size)and curing complete excluding cost of form work in foundation and plinth in all leads and lifts. | 2.01 | Cum | 14,800 ₹29,748 | 14,500 ₹29,145 |
| 4.00Providing and laying cement concrete 1:1.5:3(1cement: 1.5 sand:3 crushed stone agg.20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 4.01 | In foundation and plinth in all leads and lifts. | 4.16 | Cum | 19,000 ₹79,040 | 18,000 ₹74,880 |
| 4.02 | Walls (any thickness)but not less than 0.1 mtr.thickness)attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto floor two level in all leads and lifts. | 7.34 | Cum | 18,500 ₹1.4 L | 17,000 ₹1.2 L |
| 4.03 | Suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level in all leads and lifts. | 1.72 | Cum | 19,500 ₹33,540 | 17,800 ₹30,616 |
| 5.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm, so as to give a fair finish including centering ,shuttering, propping etc.with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plain concrete work in:- | |||||
| 5.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pillasters,buttresses plinth and string courses and the like in all leads and lifts | 84.4 | Sqm. | 750 ₹63,300 | 700 ₹59,080 |
| 5.02 | Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness in all leads and lifts. | 17.42 | Sqm. | 900 ₹15,678 | 850 ₹14,807 |
Tender Value
₹4.0 L
EMD Value
₹8,100
Closing Date
3 Oct 2025, 5:00 pmClosed
Executive Engineer Jal Shakti Division Thunag
O/O Executive Engineer Jal Shakti Division Thunag Distt Mandi HP
C/O RCC circular storage Tank 35000 ltr Cap. At Salain
2025_HPIPH_115692_12
5296-5336 dt 23/09/2025
Open Tender
Civil Works - Water Works
90 days
Balichowki
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹8,100
Yes
11 Feb 2026
24 Sept 2025
4 Oct 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid