Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
23 Dec 2022, 11:00 amClosed
11750-GMO SOUTH ZONE
STRUCTURAL WORKS AT RAJAHMUNDRY LPG PLANT
GEM/2022/B/2894489
GEM/2022/B/2894489
Open Tender
East Godavari, Andhra Pradesh
₹0
Exempted
23 Dec 2022
13 Dec 2022
23 Dec 2022
23 Dec 2022
13 Dec 2022 - 21 Dec 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Structural steel works | Structural steel works — SUPPLYING, TRANSPORTING, FABRICATING, ERECTING IN POSITION IN POSITION OF PRE- FABRICATED STEEL STRUCTURES AT ALL ELEVATIONS FOR CANOPY/HOARDING USING TUBULAR STRUCTURAL STEEL SECTIONS CONFORMING TO IS 1161-LATEST EDITION , INCLUDING CUTTING, WELDING OR BOLTING, SUPPLY OF BOLTS/NUTS/WASHERS ETC., COMPLETE AS PER DRAWINGS INCLUDING SURFACE PREPARATION AND APPLYING ONE COAT OF ZINC PHOSPHATE PRIMER BEFORE ERECTION, ONE COAT AFTER ERECTION AND TWO COATS OF SYNTHETIC ENAMEL PAINT AS PER SPECIFICATION AFTER ERECTION AND ALL MATERIALS AND LABOUR COMPLETE. (NO WELDING IS PERMITTED AT SITE). THE RATE QUOTED SHALL INCLUDE COST OF BOLTS, NUTS, WASHERS, WELDING AND ELECTRODES AND ANY OTHER CONSUMABLES REQUIRED FOR COMPLETING THE WORK. NUTS, BOLTS AND WASHERS SHALL NOT BE CONSIDERED FOR MEASUREMENT/PAYMENT. THEORETICAL WEIGHT OF STEEL SECTIONS SHALL BE CONSIDERED FOR PAYMENT. | - | Metric Ton |
| 2 | Structural steel works | Structural steel works — SUPPLYING, TRANSPORTING, FABRICATING, ERECTING IN POSITION IN POSITION OF PRE- FABRICATED STEEL STRUCTURES AT ALL ELEVATIONS FOR CANOPY/HOARDING USING TUBULAR STRUCTURAL STEEL SECTIONS CONFORMING TO IS 1161-LATEST EDITION , INCLUDING CUTTING, WELDING OR BOLTING, SUPPLY OF BOLTS/NUTS/WASHERS ETC., COMPLETE AS PER DRAWINGS INCLUDING SURFACE PREPARATION AND APPLYING ONE COAT OF ZINC PHOSPHATE PRIMER BEFORE ERECTION, ONE COAT AFTER ERECTION AND TWO COATS OF SYNTHETIC ENAMEL PAINT AS PER SPECIFICATION AFTER ERECTION AND ALL MATERIALS AND LABOUR COMPLETE. (NO WELDING IS PERMITTED AT SITE). THE RATE QUOTED SHALL INCLUDE COST OF BOLTS, NUTS, WASHERS, WELDING AND ELECTRODES AND ANY OTHER CONSUMABLES REQUIRED FOR COMPLETING THE WORK. NUTS, BOLTS AND WASHERS SHALL NOT BE CONSIDERED FOR MEASUREMENT/PAYMENT. THEORETICAL WEIGHT OF STEEL SECTIONS SHALL BE CONSIDERED FOR PAYMENT. | - | Metric Ton |
| 3 | Structural steel works | Structural steel works — SUPPLYING, TRANSPORTING, FABRICATING, ERECTING IN POSITION IN POSITION OF PRE- FABRICATED STEEL STRUCTURES AT ALL ELEVATIONS FOR CANOPY/HOARDING USING TUBULAR STRUCTURAL STEEL SECTIONS CONFORMING TO IS 1161-LATEST EDITION , INCLUDING CUTTING, WELDING OR BOLTING, SUPPLY OF BOLTS/NUTS/WASHERS ETC., COMPLETE AS PER DRAWINGS INCLUDING SURFACE PREPARATION AND APPLYING ONE COAT OF ZINC PHOSPHATE PRIMER BEFORE ERECTION, ONE COAT AFTER ERECTION AND TWO COATS OF SYNTHETIC ENAMEL PAINT AS PER SPECIFICATION AFTER ERECTION AND ALL MATERIALS AND LABOUR COMPLETE. (NO WELDING IS PERMITTED AT SITE). THE RATE QUOTED SHALL INCLUDE COST OF BOLTS, NUTS, WASHERS, WELDING AND ELECTRODES AND ANY OTHER CONSUMABLES REQUIRED FOR COMPLETING THE WORK. NUTS, BOLTS AND WASHERS SHALL NOT BE CONSIDERED FOR MEASUREMENT/PAYMENT. THEORETICAL WEIGHT OF STEEL SECTIONS SHALL BE CONSIDERED FOR PAYMENT. | - | Metric Ton |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000033-HB-12731.pdf
TENDER_DOCUMENT • 6.35 MB
115545.pdf
TENDER_DOCUMENT • 0.13 MB
Download all tender documents and submit your bid