| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.7 LAccepted-Finance | ₹9.7 L | 1 | Accepted-Finance LESS ER -0.03 |
| 2 | 2₹9.8 LRejected-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹9.8 L | 2 | Rejected-Finance aBOVE ER 1.28 |
| Sl No | Description | Qty | Unit | A CHINNADURAI L2 | N JAYAMOHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Plain Cement Concrete In Layer of Surface Including clearing and levelling the site, etc., complete complying with standard specification. | 40.5 | cum | 525 ₹21,262.5 | 520 ₹21,060 Lowest |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 40 | cum | 115 ₹4,600 | 111 ₹4,440 Lowest |
| 3.00 | Plain Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 47 | cum | 5,500 ₹2,58,500 | 5,430 ₹2,55,210 Lowest |
| 4.00 | Plain Cement Concrete 1:1.5:3 (one cement, one and half crushed stone sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 47 | cum | 7,600 ₹3,57,200 | 7,550 ₹3,54,850 Lowest |
| 5.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 32 | cum | 2,600 ₹83,200 | 2,560 ₹81,920 Lowest |
| 6.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 320 | Sqm | 85 ₹27,200 | 81.5 ₹26,080 Lowest |
| 7.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 16 | cum | 4,800 ₹76,800 | 4,655 ₹74,480 Lowest |
| 8.00 | Goods and Service Tax @ 18% | 1 | L.S. | 1,49,177.25 ₹1,49,177.25 | 1,47,247.2 ₹1,47,247.2 Lowest |
Tender Value
₹9.8 L
EMD Value
₹9,800
Closing Date
23 Sept 2025, 3:00 pmClosed
Commissioner
Municipal Office, Ulundurpet Municipality
Restoration of Potholes at Ward No. 01 to 24 in Ulundurpet Municipality
2025_MAWS_607187_5
861/2025/E1
Open Tender
Civil Works
Works
30 days
Ulundurpet Municipal Limit
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,800
13 Aug 2026
22 Sept 2025
23 Sept 2025
22 Sept 2025
23 Sept 2025
22 Sept 2025
Amount
Dismantling Plain Cement Concrete In Layer of Surface Including clearing and levelling the site, etc., complete complying with standard specification.
Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers.
Plain Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means
Plain Cement Concrete 1:1.5:3 (one cement, one and half crushed stone sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Goods and Service Tax @ 18%
A CHINNADURAI (BID ID -1468597)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_725714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].