| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.2 LAccepted-AOC | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹23.4 L+₹2.2 L (10.4%)Accepted-AOC | 2 | Accepted-AOC ACCEPT | |
| 3 | 3₹24.2 L+₹3.1 L (14.4%)Accepted-AOC | 3 | Accepted-AOC ACCEPT | |
| 4 | 4₹24.6 L+₹3.4 L (16.1%)Accepted-AOC | 4 | Accepted-AOC ACCEPT |
Tender Value
₹22.3 L
EMD Value
₹33,476
Closing Date
1 Mar 2021, 6:00 pmClosed
Executive engineer, PWD Roads division Kannur
O/o Executive engineer PWD Roads division Kannur
SLTF FD 20-21 - Reconstruction of Damaged Culverts - At KM 14/600 Ulikkal Arabi Kolithattu Peratta Thottilpalam Road.
2021_PWD_418211_1
PWD/2020-2021/19507/RdDnKNR
Open Tender
Civil Works - Roads
Item Rate
90 days
KM 14/600
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹33,476
Yes
11 Aug 2021
23 Feb 2021
4 Mar 2021
23 Feb 2021
1 Mar 2021
23 Feb 2021
Amount
Culvert
2.4.2.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means
2.4.4.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Rubble stone masonry in cement mortar.<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
od26038/2020_2021 : Bailing out water by using 5HP motor and pump set including all cost and erection charges oil and labour charges etc. complete.
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
od26039/2020_2021 : Dry Rubble masonry : Dry rubble masonry without concrete levelling course masonry with good quality blazed rubble including packing to compactness to lines and levels. Cost and conveyance of all materials , labour etc complete. as per the direction of departmental officers at site.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
13.3 : Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical SpecificationsPlastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
12.8.E.1.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M25 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 - Using Concrete Mixer
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
3.15 : Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.1.B.1 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-V - For sub base cum drainage layer - Mix in Place MethodConstruction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
13.9.A : Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification <br> Granular materialBack filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
od13842/2020_2021 : Mix seal surfacing Providing laying and rolling of close graded premixed surfacing material 20mm thickness composed of 11.2 mm to 9mm (Type A) 13.2 mm to 9mm (Type B) aggregates using Bitumen VG-30 to required line grade and level to serve as a wearing course on previously prepared base including mixing in a suitable plant laying and rolling with a static roller 8- and finishing to required level and grades as per technical specifications by MORD By manual means Type A (Bitumen VG 30)
55.16 : Providing and fixing guard post<br>Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wideProviding and fixing guard postProviding and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
C. H. MOHAMMED ASHARAF
THOMAS KANNANTHANATH
JAMES KANNANTHANATH
Bidder Name
THOMAS KANNANTHANATH
K.T. DEVASIA
JAMES KANNANTHANATH
C. H. MOHAMMED ASHARAF
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_593856.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .