| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC SANGALPAM CHEMANCHERY VENGALAM | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹17.3 L+₹1.4 L (8.61%)Rejected-AOC | L2 | Rejected-AOC Agreement executed | |
| 3 | L3₹17.4 L+₹1.4 L (8.91%)Rejected-Finance | L3 | Rejected-Finance Lowest bid accepted |
Tender Value
₹17.7 L
EMD Value
₹44,293
Closing Date
10 Aug 2023, 3:00 pmClosed
Executive Engineer
PWD Buildings Division Kozhikode
Construction
2023_PWD_586297_2
25/EEBK/2023-24
Open Tender
Civil Works - Buildings
Item Rate
270 days
Nadapuram Kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹44,293
Yes
16 Oct 2023
29 Jul 2023
14 Aug 2023
29 Jul 2023
10 Aug 2023
29 Jul 2023
Amount
Painting and other repairs
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
14.46:Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work
14.53.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work
14.59.1:Polishing on wood work with ready made wax polish of approved brand and manufacture:Old work
14.61:Painting (one or more coats) with black japan paint of approved brand and manufacturing to given an even shade.
OD16226/2023-2024:Upholsters make and repair furniture with soft, padded textile covering features, such as armchairs, sofas and bedheads. Including choosing, measuring, cutting, fitting and sewing fabric and leather materials etc complete (Upholsterers work on household furnishings)
50.9.12.1:Providing and fixing Thomson Multi wood board or equivalent make, in shelves with screws and fittings wherever required, edges to be painted with polyurethane primer (fittings to be paid separately) as per the direction of site Engineer-in-charge.
15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
OD16234/2023-2024:Providing & fixing on roof ceramic roof tiles and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
OD16235/2023-2024:Providing & laying on roof ceramic tile ridge and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
OD72592/2021-2022:Engaging labour for cleaning ,shifting and reshifting files and furniture
OD17174/2023-2024:Providing and Applying Teracotta Mural works as per design intent .Mural work to be Apply on to the existing wall using Paint and suitable adhesive .Including cost and conveyance of all materials , labour charges etc. complete.
21.1.1.3:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portionPolyester powder coated aluminium ( minimum thickness of polyester powder coating 50 micron )
21.1.2.3:For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Polyester powder coated aluminium (minimum thickness of polyester powder coating 50 micorn)
21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness
OD17266/2023-2024:Providing and fixing fly proof net for air holes as per the direction of engineer in charge
OD17279/2023-2024:Providing cover to bed all works complete
OD17323/2023-2024:Supplying and fixing zebra Horizontal blinds curtain fixing to powder coated aluminium frame work including all fittings etc.complete as per the direction of the Engineer in charge
OD21713/2023-2024:Providing and fixing staff table made with Pre - laminated with decorative lamination on both side exterior Grade - I MDF Board 17 mm thick confiriming to IS:14587 top of cabin is fixed with 18 mm thick MDF partition including providing draws, cupboards, keyboard top portion with toughened glass etc including all other fittings all cost of materials all labour charges etc complete, (measurement taken top of the table surface only)
OD17448/2023-2024:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc Supplying department material
OD17453/2023-2024:Providing and fixing 12 mm thick toughened glass approved brand and manufacture for dining table, all complete as per direction of Engineer-in-charge
Interlocking for yard
16.9:Scarifying metalled (water - bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity.
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
Front Gate & Name Board
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD281752/2022-2023:Random rubble ( Departmentally supplied rubble stone) masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand)
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.15:Centering and shuttering including strutting, etc. and removal of form for:Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
OD7814/2023-2024:Providing & laying on roof ceramic tile ridge and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
OD7815/2023-2024:Providing & fixing on roof ceramic roof tiles and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
OD17424/2023-2024:Providing and fixing wood composite panel board fixed in stainless steel frame of gate using rivet etc. complete as per architectural drawings and directions of Engineer - in- Charge.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
OD15844/2023-2024:Providing and fixing I st quality Polished Laterite cladding stone of approved make of any size as approved by Engineer -in-Charge, in skirting, dados etc.
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD17366/2023-2024:Supplying and fixing of stainless steel brushed metel name letters upto 10 inch height including all charges
Drainage , Landscaping & Gardening Works
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
OD17455/2023-2024:Engaging labour for cutting the root of the tree, cleaning and transporting debris & waste
OD17267/2023-2024:Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unsaverieable material?s as per direction of officer in charge Cost of plantation per trees plants
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
OD17341/2023-2024: Providing and fixing Pearl grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and even, watering with sprinkler
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
SAJI P
K P IBRAHIM
Bidder Name
BALRAJ SAHU P K
SAJI P
K P IBRAHIM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_874644.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .