Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | +0.00% | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 Cr+₹6.7 L (2.00%)Admitted-Finance | +2.00% | ₹3.4 Cr+₹6.7 L (2.00%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹20.1 L (6.00%)Admitted-Finance | +6.00% | ₹3.6 Cr+₹20.1 L (6.00%) | L3 | Admitted-Finance |
Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
17 Jun 2026, 5:00 pmClosed
C.C.E, Northern R AND B Circle, SAMBALPUR
O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR
BUILDING WORK
2026_EICCL_130287_9
CCENC(RANDB) /24/ 2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
210 days
ATTABIRA
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.4 L
Yes
3 Aug 2026
2 Jun 2026
18 Jun 2026
2 Jun 2026
17 Jun 2026
2 Jun 2026
2 Jun 2026 - 8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old lime or cement plaster from walls including raking out joints 12mm deep and removing the debris within 50m lead as per direction of Engineer-in-charge. | 1,274.23 | Sqm | 57.7 | ₹73,523.07 |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per approved Drawing & Technical Specifications and as per Clause - 201 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 1,500.2 | Sqm | 8.45 | ₹12,676.69 |
| 3 | Dismantling & removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50M lead as per direction of Engineer-in-charge. | 273.08 | Sqm | 144.25 | ₹39,391.79 |
| 4 | Dismantling G.C.I. Or A.C. sheet roofing after carefully removing the bolts and nuts including stacking of the materials for reuse adn removing the debris within 50M lead as per direction of Engineer-in-charge. | 301.6 | Sqm | 104.1 | ₹31,396.56 |
| 5 | Dismantling and removing RCC columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50M lead as per direction of Engineer-in-charge. | 171.18 | Cum | 1,972.96 | ₹3,37,731.29 |
| 6 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for re-use and removing the debris within 50M lead as per direction of Engineer-in-charge. | 84.04 | Sqm | 459.63 | ₹38,627.31 |
| 7 | Dismantling wrought and framed timber in roof frame work of floors after careful removal of nail, bolts etc. and stacking the materials for re-use and removing the debris within 50M lead as per direction of Engineer-in-charge. | 4.63 | Cum | 1,579.86 | ₹7,314.75 |
| 8 | Dismantling brick or stone masonry in lime or cement mortar under 3M height including stacking the useful materials for reuse and removing the debris within 50M lead per 1 Cum | 473.14 | Cum | 1,887.75 | ₹8,93,170.03 |
| 9 | Proving fitting fixing of Semi grid minerals fiber ceiling board having size 600x600x16mm of approved design and quality complete with all fittings and fixtures as per direction of Engineer-in-charge. | 330.53 | Sqm | 1,604 | ₹5,30,170.12 |
| 10 | Earth work in excavation of foundation in all kinds of soil including moorum, stony earth mixed with boulders (except sheet rocks and boulders requiring blasting) with all leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the works etc. complete as directed by the Engineer-in-charge. | 890.39 | Cum | 276.89 | ₹2,46,540.09 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
10ATTABIRA.pdf
Tender Documents • 1.58 MB
BOQ_593599.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .