| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 CrAccepted-Finance | ₹3.7 Cr | 1 | Accepted-Finance Responsive |
| 2 | 2₹3.9 Cr+₹19.9 L (5.41%)Accepted-Finance | ₹3.9 Cr+₹19.9 L (5.41%) | 2 | Accepted-Finance Responsive |
| 3 | 3₹4.2 Cr+₹51.1 L (13.9%)Accepted-Finance | ₹4.2 Cr+₹51.1 L (13.9%) | 3 | Accepted-Finance Responsive |
Tender Value
Refer Docs
EMD Value
₹9.2 L
Closing Date
1 Dec 2020, 4:00 pmClosed
EE PMGSY DIVISION KARGIL
BAROO, KARGIL
UPGRADATION NAD MAINTENECE OF ROAD FROM KHANGRAL SANJAK ROAD TO BARTHANG SANJAK KARGIL
2020_KSRRD_102029_1
06/EE/PMGSY/KGL OF 2020-21
Open Tender
Civil Works - Roads
Item Rate
548 days
Sanjak Kargil
Please refer Tender documents.
12 documents required · 12 mandatory
₹6,000
EE, PMGSY Kgl
₹9.2 L
Yes
OFFICE OF CHIEF ENGINEER PMGSY LADAKH LEH
15 Jan 2021
12 Nov 2020
3 Dec 2020
13 Nov 2020
1 Dec 2020
13 Nov 2020
16 Nov 2020
Amount
Part A: Pavement 1st
EARTH WORK IN HILL ROADS:- Excavation in hilly areas in soil by mechnical means including cutting and trimming of side slopes & disposing of Excavated earth with in a lift upto 1.5m and safe disposal of surplus un serviceable excavated soil as directed by the Engineer incharge without damaging any private/ public property. as per technical specification Clause 1603.1.Including construction of reference pillars as per requirement. Ordinary Soil
EARTH WORK IN HILL ROADS:- Excavation in Hilly areas in ordinary rock not requiring blasting by mechnical means including cutting and trimming of side slopes & disposing of Excavated earth with in a lift upto 1.5m and safe disposal of surplus un serviceable excavated soil as directed by the Engineer incharge without damaging any private/ public property, as per tchnical specification Clause 1603.1 Soft Rock
EARTH WORK IN HILL ROADS:- Excavation in Hilly areas in hard rock requiring blasting by mechnical means including cutting and trimming of side slopes & disposing of Excavated earth with in a lift upto 1.5m and safe disposal of surplus un serviceable excavated soil as directed by the Engineer incharge without damaging any private/ public property, as per technical specification Clause 1603.1 Hard Rock
Part B: Pavement 2nd
Granular sub-base :- Granular sub-base / base / surface course with local nallah/quarry materials (Table 400.13)by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers manually on prepared surface , mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.(Including all leads lifts).
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. by mechanical means including loading/ unloading and haulage of materials, T&P etc. and testing of materials for quality control. (Complete Job)
Prime Coat :- Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.00 kg/sqm as per Technical Specification Clause 502.(Low Porosity) (Including all leads lifts).
Bituminous Macadam :- Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per table 500.4 premixed with bitumen binder @ 3.20 % to 3.50 %,of denisity,Viscosity VG grade 10 transported to site laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.(Including all leads lifts).
Providing, laying and rolling of open graded premix carpet 20mm thickness composed of 13.2mm to 5.6mm aggregates using penetration grade bitumen to required time, grade and level to serve as wearing course on previously prepared bed, including mixing in a suitable plant, laying and rolling with a three wheel 80-100KV static roller capacity, finished to required grade and camber as per technical specification clause 508. By mechanical means. Bitumen (S-90).
Seal Coat :- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510.specification 1995) By Mechanical Means Type B Bitumen Viscosity VG grade 10 (Including all leads lifts).
Construction of Subgrade Earthen shoulder with approved material obtained from Borrow pits with all leads and lifts, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with all sorts of leads and lifts as per TS Clause 303.1
Part C: Protection Works
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious materials and disposal up to a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material ordinary soil incl. dewatering of trenches and diverting of Nallah wherever necessary. complete Job
Dense or hard soil
Soft rock
Providing concrete for plain concrete in open foundations complete as per drawings and technical specification clause 802, 803, 1202 and 1203 PCC grade M-10 nominal mix 1:3:6 including Haulage of material involved.
Plain/re-enforced cement concrete in sub-structure complete as per drawings and technical specifications clauses 802, 804, 805, 806, 807, 1202 & 1204 ( Height upto 5 M) including cost of form works ,loading/ unloading/ haulage of all materials and T&P etc as well as testing of materials and mix for quality control (complete job ) PCC grade M15
Filling available excavated earth over stone fillings / in trenches as per drawings & Technical specification Clause 305.3.9
Filling of earth obtained from barrow pits in trenches as per drawing and technical specification Clause 305,3.9 including loading/ unloading/ hulage of materials complete job, finished work to be measured.
Backfilling behind abutment, wing wall and return wall complete as per drawings and T.S clause 1204.3.8 with 2nd class stones/granular material
Polygon/ Random Rubble masonry uncoursed / brought –to course, in 1 Cement :6 fine sand mortar with Nallah stone, in substructure/ Super Structure, including leveling up at specified levels with M-5 nominal mix ( max. size of stone aggregate : 20mm nominal ) concrete as per drawing and technical specification clauses 600, 700, 702, 704, 1202, 1204 and 1600, including cost of stones, through/ bond stones, loading/ unloading/ haulage of materials complete,
Full Rate
Labour Rate only
Polygonal/ Random Rubble masonry, uncoursed / brought –to course, laid dry, with quarry stones of approved quality in sub structure/super structure as per drawing and technical specifications as per clause 1606 . including cost of stones ,through/ bond stones,loading/Unloading/haulage of materials complete.
Full Rate
Labour Rate only
Part D: Cross Drainage
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious materials and disposal up to a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material ordinary soil incl. dewatering of trenches and diverting of Nallah wherever necessary. complete Job
Dense or hard soil
Soft rock
Providing concrete for plain concrete in open foundations complete as per drawings and technical specification clause 802, 803, 1202 and 1203 PCC grade M-10 nominal mix 1:3:6 including Haulage of material involved.
Providing concrete for plain/ reinforced cement concrete in open foundations complete as per drawing and technical specifications clause 802,803,1202 & 1203, M-15 grade.
Providing and laying reinforced cement concrete in super structure complete as per drawings and technical specification clause 800, 1205.4 and 1205.5 RCC grade M-20
Supplying, fitting, and placing TMT reinforcement bar in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Backfilling behind abutment, wing wall & return wall complete as per drawing & technical specification Clause 1204.3.8 ).
Providing & Laying M.S Pipe (5mm thick) 300 mm dia flanged type for a length of 7.5 mtr for cross drainage works including construction of catch pits at the inlet and out let in M - 15 Grade concrete and provding and laying a bed of sand layer and provindg earth cushion to the required grade and cross section (as directed by engineer in-charge as per drawring and PWD specification.
Part E: Road Furniture
Providing and fixing of typical PMGSY informatory sign board with logo as per MORD specification and drawing. Three MS Plate of 1.6mm thick. Top and middle plate duly welded with MS flat iron 25mm X 5m size on back edges. The lower plates duly welded with MS angle iron frame of 25mm x 25mm x 5mm. the angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2Nos. 75mm x 75m of SWG sheet tubes post duly embedded in cement conc. M-15 grade blocks 450mm x450mm x 600mm, 600mm below ground level as per clause 1701 and annexure 1700.1
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per 1RC-67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminum sheeting 1.5mm thick supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade cement concrete 450mm x 450mm x 600mm, 600mm below ground level as per drawing and technical specification clause 801.
Providing and erecting direction and place identification rectro-reflectorised sign as per IRC-67 made of encapsulated lense type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5mm thick supported on a mild steel single angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly design foundation with M15 grade cement concrete 450mmx450mmx600mm , 600mm below ground level as per drawing and Technical specification clause 1701
Reinforced cement concrete M15 grade kilometer/ local stone of standard design as per IRC 8, fixing in position including painting and printing etc as per drawing and technical specification clause 1703 i) 5th Km stone (precast)
ii) Ordinary Km stone(Pre cast)
iii) 200Mtr ( precast stone mile)
Maintenance for Five Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
MS TSERING ANGDUS
M/S Everest Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .