Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC BIST DOAB CANAL GW DIVISION JALANDHAR | L1 | Accepted-AOC Award of Contract the Khosa Contractor by the committee for the Lower Bidder than others | |
| 2 | L2₹3.0 L+₹27,000 (10.0%)Rejected-AOC | L2 | Rejected-AOC Higher tender rates from the lowest bidder |
| Sl No | Description | Qty | Unit | KHOSA CONTRACTOR L1 | ARISE BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Running vehicle Charges for Inspection of Abohar Canal Division Works for FY 2025-2026 w.e.f 1-October 2025 to 31-March-2026 For
malookpur canal Sub division (6 months x1=6) | 6 | Month | 45,000 ₹2,70,000 Lowest | 49,500 ₹2,97,000 |
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
19 Sept 2025, 10:00 amClosed
Executive Engineer, Abohar Canal and Ground Water
Executive Engineer, Abohar Canal and Ground Wate
Estimate for Hiring of Vehicle for inspection of Abohar Canal Division works for Malookpur Canal Sub-Division.
2025_WR_149554_1
E-TenderingNoticeNo.07/Abohar Canal AND Ground Water Divn/2025-26 Dated 11/09/2025
Open Tender
Miscellaneous Services
Item Rate
FAZILKA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹5,400
Yes
26 Sept 2025
11 Sept 2025
19 Sept 2025
12 Sept 2025
19 Sept 2025
12 Sept 2025
Amount
Running vehicle Charges for Inspection of Abohar Canal Division Works for FY 2025-2026 w.e.f 1-October 2025 to 31-March-2026 For malookpur canal Sub division (6 months x1=6)
ARISE BUILDERS (BID ID -683380)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .