SUPERINTENDING ENGINEER (O&M)
Construction of T.C. Plinth and RMU Plinth Under Various divisions under Godhra circle office
346900
GDC/O&M/Civil/Plinth/2026-27/05
Open
Civil Works
Works
Panchmahal
14 documents required · 13 mandatory · 1 optional
₹1,475
Madhya Gujarat Vij Company Limited
₹44,200
19 Sept 2026
19 Sept 2026
19 Sept 2026
12 Oct 2026
19 Sept 2026
NAME OF WORK:- Construction of T.C. Plinth and RMU Plinth Under Various
divisions under Godhra circle office
Item Description Qty unit Rate Amount
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
1 materials and disposing off the excavated stuff 460.00 CMT 207.55
upto 50 Meter lead.(A) Loose or soft soil
Providing and laying cement concrete 1:4:8 (1-
Cement : 4- coarse sand : 8- hand broken stone
2 aggregates 40 mm nominal size) and curing 50.00 CMT 2673.91
complete excluding cost of formwork in (A)
Foundation and Plinth
Providing and laying controlled cement
concrete M.200 and curing complete including
the cost of formwork and excluding
3 reinforcement for reinforced concrete work in 80.00 CMT 4458.57
(A) Foundations, footings, Base of columns and
Brick work using common burnt clay building
bricks having crushing strength not less than
4 35kg./Sq.Cm. in foundation and plinth in 320.00 CMT 3989.63
Cement Mortar 1:6 (1- Cement : 6 -fine sand)
(B) Conventional
Brick work using common burnt clay building
bricks having crushing strength not less than
35kg./Sq.Cm. in superstructure above plinth
5 level upto floor two level in Cement Mortar 1:6 160.00 CMT 4266.35
(1- Cement : 6 -fine sand) (B) Conventional
Providing 20mm thick cement plaster in single
coat on single or half brick walls for interior
plastering upto floor two level and finished
6 even and smooth in. Cement mortar 1:3 (1- 1310.00 SMT 295.08
cement:3-sand)including finishing with a
floating coat of neat cement slurry necessary
Gishi etc complete
NAME OF WORK:- Construction of T.C. Plinth and RMU Plinth Under Various
divisions under Godhra circle office
Item Description Qty unit Rate Amount
Providing TMT Bar FE 500D reinforcement for
R.C.C. work including bending, binding and
7 placing in position complete upto floor two 3850.00 KG 76.17
Applying two coats of putty & two coats of
primer of approved brand and manufacture on
new wall surface to givean even shade
8 including thoroughly brushing the surface free 1310.00 SMT 40.19
from mortar dropping and other foreign matter
and sand papered smooth.
Finishing wall with weather proof exterior
emulsion paint on wall surface (Two coats) to
give a required shape even shade after
9 throughly brushing the surface to remove all 1310.00 SMT 117.18
dirt and remains of loose powdered materials
Filling available excavated earth (excluding
rock) in trenches. plinth, sides of foundations
10 etc. in layers not exceeding 20 cm. in depth 180.00 CMT 133.41
consolidating each disposited layer by ramming
Demolition of Brick work and stone masonry
including stacking of serviceable materilas and
11 disposal of unserviceable materials with all 25.00 CMT 548.47
lead and lift.(ii) In Cement Mortar.
Demolition including stacking of serviceable
materilas and disposal of unserviceable
12 materials with all lead and lift. (i) R.C.C. work 25.00 CMT 1054.62
Job work for cleaning the site by labours
including removing of trees, grass and levelling
13 the ground complete as per directed by EIC 300.00 No 487.00
(Unskiiled labour).
Removing of debries by tractor trip by means
of loading existing debries and disposal it off
14 out side up to any lead directed by EIC. 100.00 No 700.00
NAME OF WORK:- Construction of T.C. Plinth and RMU Plinth Under Various
divisions under Godhra circle office
Item Description Qty unit Rate Amount
Removing & Refixing Chainlink/FRP fencing
15 along with vertical post from site without 100.00 RMT 40.00
damaging the fencing and other structure
Removing & refixing of Paver floors laid in
16 mortar including stacking the same as directed 100.00 SMT 250.00
Ø GST at applicable rate will be reimbursed in actual to the contractor only after
submission of sufficient proof of such payment made to the Govt. For claiming refund of
GST agency has to submit invoice in the format as prescribed by the Act.
Ø GST at the applicable rate will be levied on the total Schedule – “B”. GST will be subject
CGST, SGST, UTGST, IGST act and rules, regulation and notifications issued by Government
/ MGVCL from time to time. Contractor has to classify the supply / service according to the
GSN / SAC of CGST Act, 2017. MGVCL also reserve the right of classification in case of any
misclassification of goods / services. Contractor has to provide invoice in standard format
as per CGST act and GST invoicing rules. GST will be reimbursed subject matching of
transaction in GST return. In case of mismatch, amount of GST will be retained from the
subsequent invoice of the contractor. For final bills, GST will be retained and reimbursed
on matching the same in GST return and after receipt of request from the contractor.
Ø Labour welfare cess will be deducted from RA & Final bills considering new construction
work as per latest prevailing law.
Ø The material shall be got tested from Government recognized laboratory i.e.(R & B) or
field laboratory of GERI (R&B) or any Government approved laboratory, for which 1% of the
estimated amount to tender shall be recovered from the contractor from the RA Bill &
Final Bill. Contractor should pay testing charges in advance as instructed by EIC (Engineer
in charge) and same shall be adjusted in the recovery amount on production of proof of
Original Bills paid to concerned laboratory. However, if the charges increase over 1% no
excess recovery shall be made from the contractor and such amount paid by the company
directly to testing laboratory.
Ø Security Deposit shall be released on successful completion of one year from actual date
of completion or finalization of final bill whichever is later. For special items like
waterproofing, antitermite treatment separate amount shall be deposited as per item.
Superintending Engineer (O&M)
Circle Office, MGVCL, Godhra.
NAME OF WORK:- Construction of T.C. Plinth and RMU Plinth Under Various
divisions under Godhra circle office
Item Description Qty unit Rate Amount
I/We have read and clearly understood the terms and conditions of schedule-B and
technical specifications put up by MGVCL on web site.
GST shall be appicable as per Govt. rules.
We hereby accept all the conditions and specifications of MGVCL/PWD as well as
specifications of this tender documents and accordingly.
Labour welfare cess will be deducted at rate of 1% of bill amount from bill as prevailing
I/we/am/are willing to carry out the work at-------------------------- %( in words-----------------
------percentage) above/below the estimated cost. Accordingly the total amount of my/our
------percentage) above/below the estimated cost. Accordingly the total amount of my/our
Signature of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document RMU TC Plinth.pdf
Sch B RMU TC Plinth.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .