Tender Value
₹4.9 Cr
EMD Value
₹9.8 L
Closing Date
24 Oct 2026, 11:00 am6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE MANDI-II,HPPWD MANDI
EE
Development of existing campus of Govt. Vallabh Degree College Mandi, District Mandi (H.P) (SH- Landscaping, Ramp , Boundary wall and water proofing treatment along with Bio Engineering works).
2026_PWD_145725_1
MDII
Open Tender
Civil Works
Percentage
120 days
EE MANDI-II, HPPWD MANDI
Please refer Tender documents.
12 documents required · 12 mandatory
₹7,000
Yes
₹9.8 L
Yes
14 Oct 2026
14 Oct 2026
24 Oct 2026
14 Oct 2026
24 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (one point five metre) in width or 10 sqm (ten squaremetre) on plan), including dressing of sides and ramming of bottoms, upto any lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, upto any lead complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 726.49 | Per cubic metre | 291.3 | ₹2,11,626.54 |
| 2 | Earth work in excavation for structures for all kinds of soil as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto any lead, dressing of sides and bottoms and back filling in trenches with excavated suitable materials complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 386.43 | Per cubic metre | 582.35 | ₹2,25,037.51 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto any lead also including ramming and watering of the earth in layers not exceeding 20 cm. (twenty centimetre) in trenches, plinth, sides of foundation etcetera complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 1,443.35 | Per cubic metre | 299.05 | ₹4,31,633.82 |
| 4 | Providing and laying in position cement concrete 1:2:4 (one cement: two coarse sand :four graded, crushed stone aggregate 20mm (twenty millimetre) nominal size ) including curing complete excluding the cost of centering, shuttering, in all works up to all floor level complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 47.59 | Per cubic metre | 6,053.15 | ₹2,88,069.41 |
| 5 | Providing and laying in position cement concrete 1:4:8 (one cement: four coarse sand :eight graded, crushed stone aggregate 40mm (forty millimetre) nominal size ) including curing complete excluding the cost of centering, shuttering, in all works up to all floor level complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 95.25 | Per cubic metre | 5,074.6 | ₹4,83,355.65 |
| 6 | Providing and laying in position cement concrete 1:5:10 (one cement: five coarse sand :ten graded, crushed stone aggregate 40mm (forty millimetre) nominal size ) including curing complete excluding the cost of centering, shuttering, in all works up to all floor level complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 741.1 | Per cubic metre | 4,797.6 | ₹35,55,501.36 |
| 7 | Providing and laying damp-proof course 40mm (forty millimetre) thick with cement concrete 1:2:4 (one cement : two coarse sand): four graded stone aggregate 12.5mm (twelve point five millimetre) nominal size) including cost of formwork complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 5.8 | Per square metre | 304.3 | ₹1,764.94 |
| 8 | Providing and applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg (one point seven kilogram) per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 5.8 | Per square metre | 203 | ₹1,177.4 |
| 9 | Providing centering and shuttering including strutting, propping etcetera and removal of form for foundation footings, bases of columes etcetera for mass concrete complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 419.04 | Per square metre | 243.1 | ₹1,01,868.62 |
| 10 | Providing centering and shuttering including strutting, propping etcetera and removal of form for all heights in walls (any thickness) including attched pilasters, butteresses, plinth and string courses etcetera complete in all respect.The rates are inclusive of Octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the Government, but excluding GST and including entire carriage of material within all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. | 405.1 | Per square metre | 515.45 | ₹2,08,808.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
SBD.pdf
Tender Documents • 2.82 MB
BOQ_217093.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .