| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 CrAccepted-AOC PLOT NO 54 UDYOG KENDRA II ECOTECH III GREATER NOIDA | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | L1 | Accepted-AOC Responsive | |
| 2 | L2₹16.9 Cr+₹1.6 Cr (10.5%)Rejected-AOC KOTHI NO 6 CIVIL LINES OPP TB TOWER DISTRICT MORADABAD UTTAR PRADESH | MORADABAD | UTTAR PRADESH | 244001 | L2 | Rejected-AOC Responsive | |
| 3 | L3₹19.0 Cr+₹3.7 Cr (23.9%)Rejected-Finance 35 WARD NO 02 ISLAMNAGAR DISTT BUDAUN | BUDAUN | UTTAR PRADESH | 110025 | L3 | Rejected-Finance Non Responsive | |
| 4 | L4₹20.8 Cr+₹5.5 Cr (36.0%)Rejected-Finance | L4 | Rejected-Finance Non Responsive | |
| 5 | L5₹21.0 Cr+₹5.7 Cr (37.1%)Rejected-Finance | L5 | Rejected-Finance Non Responsive |
| Sl No | Description | Qty | Unit | M/S PRAMOD KUMAR GUPTA L5 | M/S M A DEVELOPERS AND ENGINEERS L2 | M/S A B INFRAZONE PRIVATE LIMITED L3 | J S S Infratech L1 | m/s m.m. construction L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 75,785 | Cum | 280 ₹2,12,19,800 | 45 ₹34,10,325 | 210 ₹1,59,14,850 | 30 ₹22,73,550 Lowest | 278 ₹2,10,68,230 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Carted Earth up 5 km) | 2,671 | Cum | 200 ₹5,34,200 | 100 ₹2,67,100 | 195 ₹5,20,845 | 40 ₹1,06,840 Lowest | 205 ₹5,47,555 |
| 3.00 | Excavation in foundation in ordinary soil (Loam, clay or sand )including lift up to 1.5M and including filling watering and ramming of excavated earth in the trenches but including cost of including complete shifting of material & of material & concrete etc all labour, material , royalty and T&P all taxes complete. | 7,844 | Cum | 100 ₹7,84,400 | 45 ₹3,52,980 | 90 ₹7,05,960 | 20 ₹1,56,880 Lowest | 90 ₹7,05,960 |
| 4.00 | Construction of granular sub-base by providing coarse graded materials, spreading with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with Vibratory roller to achieve the desired density, complete as per clause 401 | 7,831 | Cum | 3,500 ₹2,74,08,500 | 3,200 ₹2,50,59,200 | 3,200 ₹2,50,59,200 | 2,800 ₹2,19,26,800 Lowest | 3,430 ₹2,68,60,330 |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 10,843 | Cum | 3,900 ₹4,22,87,700 | 3,500 ₹3,79,50,500 | 3,300 ₹3,57,81,900 | 3,200 ₹3,46,97,600 Lowest | 3,870 ₹4,19,62,410 |
| 6.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | 58,279 | Sqm | 13 ₹7,57,627 | 12.2 ₹7,11,003.8 | 16 ₹9,32,464 | 20 ₹11,65,580 | 12 ₹6,99,348 Lowest |
| 7.00 | Providing and applying Tack coat with VG-10 Bitumen over Bituminous surface at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic ar per Technical Specification Clause 503. | 58,279 | Sqm | 12 ₹6,99,348 | 10.2 ₹5,94,445.8 | 24 ₹13,98,696 | 10 ₹5,82,790 Lowest | 15 ₹8,74,185 |
| 8.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 4,079 | Cum | 11,800 ₹4,81,32,200 | 9,170 ₹3,74,04,430 | 9,300 ₹3,79,34,700 | 8,000 ₹3,26,32,000 Lowest | 11,775 ₹4,80,30,225 |
| 9.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. | 1,748 | Cum | 13,000 ₹2,27,24,000 | 11,034 ₹1,92,87,432 | 10,500 ₹1,83,54,000 | 10,000 ₹1,74,80,000 Lowest | 13,200 ₹2,30,73,600 |
| 10.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 4,717 | Cum | 8,900 ₹4,19,81,300 | 6,380 ₹3,00,94,460 | 8,500 ₹4,00,94,500 | 6,000 ₹2,83,02,000 Lowest | 8,650 ₹4,08,02,050 |
Tender Value
₹21.0 Cr
EMD Value
₹31.5 L
Closing Date
15 Dec 2025, 12:00 pmClosed
The SE Moradabad Circle PWD Moradabad
The SE Moradabad Circle PWD Moradabad
Widening and Strengthening of NH-24 to Hasanpur Dayawali Khalsa Road (ODR-49) via Memonpur Agraula, Soharka.
2025_CEMBD_1096059_1
7262/E-Tender/25-26 Dated 19.11.2025
Open Tender
Civil Works - Roads
Item Rate
450 days
Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹31.5 L
Moradabad
13 Feb 2026
5 Dec 2025
15 Dec 2025
5 Dec 2025
15 Dec 2025
5 Dec 2025
8 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 75,785 | Cum | - | - |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Carted Earth up 5 km) | 2,671 | Cum | - | - |
| 3 | Excavation in foundation in ordinary soil (Loam, clay or sand )including lift up to 1.5M and including filling watering and ramming of excavated earth in the trenches but including cost of including complete shifting of material & of material & concrete etc all labour, material , royalty and T&P all taxes complete. | 7,844 | Cum | - | - |
| 4 | Construction of granular sub-base by providing coarse graded materials, spreading with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with Vibratory roller to achieve the desired density, complete as per clause 401 | 7,831 | Cum | - | - |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 10,843 | Cum | - | - |
| 6 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | 58,279 | Sqm | - | - |
| 7 | Providing and applying Tack coat with VG-10 Bitumen over Bituminous surface at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic ar per Technical Specification Clause 503. | 58,279 | Sqm | - | - |
| 8 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 4,079 | Cum | - | - |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. | 1,748 | Cum | - | - |
| 10 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 4,717 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.97 MB
Tendernotice_2.pdf
PDF • 7.85 MB
BOQ_2017557.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .