| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC MAIN ROAD CHHATABAD P O KATRASGARH DHANBAD 828113 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828113 | L1 | Accepted-AOC L1 Firm | |
| 2 | L2₹2.7 L+₹5,029.40 (1.92%)Rejected-Finance | L2 | Rejected-Finance Not L1 Firm | |
| 3 | L3₹2.7 L+₹10,009 (3.83%)Rejected-Finance CHHATABAD P O KATRASGARH DHANBAD DHANBAD 828113 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828113 | L3 | Rejected-Finance Not L1 Firm |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
20 Aug 2022, 5:00 pmClosed
Area Manager (EnM), Block-II Area
Office of the General Manager, Block-II Area, P.O.-Nawagarh Distt-Dhanbad 828306
Complete rewinding and repairing of power transformer 750KVA/6.6KV/440V Sl. No. 1419 make KVA Process installed at Main substation Nadkhrukee under ABOCP mine
2022_BCCL_253036_1
GM/B-II/AM (ENM)/E-TENDER/2022-23/108 dt 09.08.22
Open Tender
Electrical and Maintenance Works
Percentage
15 days
ABOCP Mines, BII Area
Please refer Tender documents.
12 documents required · 12 mandatory
₹3,700
21 Oct 2022
10 Aug 2022
22 Aug 2022
10 Aug 2022
20 Aug 2022
10 Aug 2022
10 Aug 2022 - 13 Aug 2022
eProcurement System of Coal India Limited Created By: GAURAV GAURAV Created Date/Time: 22-Aug-2022 04:21 PM Tender Title: Complete rewinding and repairing of power transformer 750KVA/6.6KV/440V Sl. No. 1419 make KVA Process installed at Main substation Nadkhrukee under ABOCP mine Tender ID: 2022_BCCL_253036_1
Tender Inviting Authority: Area Manager (E&M), Block-II Area
Name of Work : Complete rewinding and repairing of power transformer 750KVA/6.6KV/440V Sl. No. 1419 make KVA Process installed at Main substation Nadkhrukee under ABOCP mine.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/S NEW VISHAL ENTERPRISES(GSTN-20ABUPA5888P1ZY) 248980.00 9.00 271388.20 Two Lakh Seventy One Thousand Three Hundred and Eighty Eight
2.00 STAR ELECTRICALS AND ENGINEERINGS WORKS(GSTN-20APEPA6348C1ZN) 248980.00 7.00 266408.60 Two Lakh Sixty Six Thousand Four Hundred and Eight
3.00 ASAD ALI ELECTRICAL AND ENGINEERING WORKS(GSTN-20ABPPA0236L1Z3) 248980.00 4.98 261379.20 Two Lakh Sixty One Thousand Three Hundred and Seventy Nine
Lowest Amount Quoted BY: ASAD ALI ELECTRICAL AND ENGINEERING WORKS(261379.20)
BOQ Summary Details Tender Title: Complete rewinding and repairing of power transformer 750KVA/6.6KV/440V Sl. No. 1419 make KVA Process installed at Main substation Nadkhrukee under ABOCP mine Tender ID: 2022_BCCL_253036_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ASAD ALI ELECTRICAL AND ENGINEERING WORKS 261379.20 L1
2 STAR ELECTRICALS AND ENGINEERINGS WORKS 266408.60 L2
3 M/S NEW VISHAL ENTERPRISES 271388.20 L3
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .