| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.0 Cr+₹71,933.02 (0.71%)Rejected-Finance 13 ARUNA NAGAR GT ROAD ETAH | ETAH | UTTAR PRADESH | 207001 | ₹1.0 Cr+₹71,933.02 (0.71%) | L-2 | Rejected-Finance ADMITTED |
| 3 | L-3₹1.1 Cr+₹6.0 L (5.93%)Rejected-Finance | ₹1.1 Cr+₹6.0 L (5.93%) | L-3 | Rejected-Finance ADMITTED |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | PURNAGIRI CONSTRUCTION CO. PVT. LTD. L1 | SHREE HARI BUILDERS L2 | DHIRENDRA PRATAP SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in dry soil i/c 1.5m lift and lead upto 30m i/c all cost of labour, material and T&P etc. complete. | 180 | Cum | 90 ₹16,200 Lowest | 97.98 ₹17,636.4 | 105.6 ₹19,008 |
| 2.00 | Cement Concrete 1:3:6 Cement , Sand and Aggregate i/c all cost of labour, material and T&P etc. complete. | 33 | Cum | 5,200 ₹1,71,600 | 4,942 ₹1,63,086 Lowest | 6,100 ₹2,01,300 |
| 3.00 | Reinforced Cement Concrete M20(1:1.5:3) Cement , Sand and Aggregate i/c all cost of labour, material and T&P etc. complete. | 104 | Cum | 6,500 ₹6,76,000 | 6,432.8 ₹6,69,011.2 Lowest | 8,200 ₹8,52,800 |
| 4.00 | Reinforcement including Bending, binding, cutting and placing of reinforcement including cost of binding wire but excluding cost of steel. i/c all cost of labour, material and T&P etc. complete. | 14.5 | MT | 66,682 ₹9,66,889 | 66,358 ₹9,62,191 | 90 ₹1,305 Lowest |
| 5.00 | Centering & shuttering for R.C.C./R.B. work including cost of centering & shuttering up to 3.0 m. height.c all cost of labour, material and T&P etc. complete. | 781 | Sqm | 590 ₹4,60,790 Lowest | 789 ₹6,16,209 | 750 ₹5,85,750 |
| 6.00 | Ist Class Brick Work in 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 184 | Cum | 5,200 ₹9,56,800 | 4,931 ₹9,07,304 Lowest | 5,100 ₹9,38,400 |
| 7.00 | DPC 2.5 Cm thick and cement concrete consisting of 1 part cement and 1½ parts approved coarse sand and & parts approved 13 mm (½") graded stone grit and including water proofing materials as ordred by the Engineer-in-Charge in the proportion as specified by the manufacturers.per i/c all cost of labour, material and T&P etc. complete. | 9.6 | Sqm | 400 ₹3,840 | 326.6 ₹3,135.36 | 234 ₹2,246.4 Lowest |
| 8.00 | Plastering upto 3m height with 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 781 | Sqm | 180 ₹1,40,580 | 177.6 ₹1,38,705.6 Lowest | 190 ₹1,48,390 |
| 9.00 | Plastering above 3m height with 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 221 | Sqm | 200 ₹44,200 Lowest | 213.52 ₹47,187.92 | 220 ₹48,620 |
| 10.00 | Ceiling Plaster with 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 164 | Sqm | 200 ₹32,800 | 189 ₹30,996 Lowest | 250 ₹41,000 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
30 Jul 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BARREILLY
Duni Barrage par badh niyantaran kacah ka nirman evam duni nirikshan bhavan ki boundary wall banane ka karye.
2026_UPIDC_1169722_1
02/SE/2026-27
Open Tender
Civil Works
Item Rate
540 days
PILIBHIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹2.5 L
Yes
19 Sept 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in dry soil i/c 1.5m lift and lead upto 30m i/c all cost of labour, material and T&P etc. complete. | 180 | Cum | - | - |
| 2 | Cement Concrete 1:3:6 Cement , Sand and Aggregate i/c all cost of labour, material and T&P etc. complete. | 33 | Cum | - | - |
| 3 | Reinforced Cement Concrete M20(1:1.5:3) Cement , Sand and Aggregate i/c all cost of labour, material and T&P etc. complete. | 104 | Cum | - | - |
| 4 | Reinforcement including Bending, binding, cutting and placing of reinforcement including cost of binding wire but excluding cost of steel. i/c all cost of labour, material and T&P etc. complete. | 14.5 | MT | - | - |
| 5 | Centering & shuttering for R.C.C./R.B. work including cost of centering & shuttering up to 3.0 m. height.c all cost of labour, material and T&P etc. complete. | 781 | Sqm | - | - |
| 6 | Ist Class Brick Work in 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 184 | Cum | - | - |
| 7 | DPC 2.5 Cm thick and cement concrete consisting of 1 part cement and 1½ parts approved coarse sand and & parts approved 13 mm (½") graded stone grit and including water proofing materials as ordred by the Engineer-in-Charge in the proportion as specified by the manufacturers.per i/c all cost of labour, material and T&P etc. complete. | 9.6 | Sqm | - | - |
| 8 | Plastering upto 3m height with 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 781 | Sqm | - | - |
| 9 | Plastering above 3m height with 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 221 | Sqm | - | - |
| 10 | Ceiling Plaster with 1:4 Cement Mortar i/c all cost of labour, material and T&P etc. complete. | 164 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
LOT05.pdf
Tender Documents • 2.27 MB
BOQ_2194873.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .