Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
22 Nov 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer I and F C Division Kargil
Executive Engineer I and F C Division Kargil
Construction of Crate protection work for lift irrigation scheme Stainkung inclduding construction of R/ wall and escape channel at spots under Capex.
2023_PWD_11871_4
Fresh e- NIT NO- 94 of 2023-24-IFC Kargil.
Open Tender
Civil Works - Canal
Works
30 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹100
Payable To Executive Engineer I and F C Division K
₹17,000
23 Nov 2023
17 Nov 2023
23 Nov 2023
17 Nov 2023
22 Nov 2023
17 Nov 2023
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed.
All kind of soil 60%
Ordinary rock 40%
Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in:
All kind of soil 65%
Ordinary rock 30%
Hard Rock (RB) 05%
Dumping /filling of stone in horizontal on level including cost of stone & all carriage complete.
Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 40mm nominal size) nallah including all carriage complete..
Dumping /filling of stone on horizontal on level excluding cost of stone but including all carriage complete.
Filling of avalable excavated earth (excluding rock) in trenches plinth ,side s of foundation etc. layers not exceeding 20Cm in depth ,consoloadating each deposited layer by ramming and watering lead upto 50mtr and lift upto i.5 mtr
Providing and fixing of steel Gate of Size (600x500)mm including priming,painting complete as per the direction of site Engineer.
Hand packing stones in wire crates including cost of crates ,stones and all carriage complete.
Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing and all carriage complete..
Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job
ABDUL RAHMAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .