Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹42,400
Closing Date
17 Aug 2026, 5:00 pm
egional project Director,Regional project manageme
REGIONAL PROJECT DIRECTOR,REGIONAL PROJECT MANAGEMENT UNIT,KRWSA, MATHA ARCADE, THODUPUZHA, IDUKKI - 685584
Rectification work of 1WSS under Package-1 to Konni GramaPanchayath in Pathanamthitta District
2026_KRWSA_839840_3
KRWSA/IDKI/TEN/WSS/27/26
Open Tender
Civil Works - Water Works
Item Rate
Konni Grama Panchayath in Pathanamthitta District
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
₹42,400
16 Jul 2026
16 Jul 2026
19 Aug 2026
16 Jul 2026
17 Aug 2026
16 Jul 2026
16 Jul 2026 - 17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX 1-SREEGANGA | |||||
| 1.01 | Excavating trenches of required width for pipes, cables, etc., including excavation for
sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not
exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of
50m, in all kinds of soil. | 84 | m3 | 678.19 | ₹56,967.96 |
| 1.02 | Cutting the bituminous / concrete roads with cutting machine for a minimum depth of
200mm along the sides of proposed alignment of the pipe to be laid without causing
any damage to other utilities, including the charges for hire and conveyance of tools
and plant, cost of consumables and charges for lighting, watching, ribbon fencing,
caution boards, traffic diversion, and as per the direction of departmental officers etc.
complete, before carrying out the demolition of bituminous / concrete road by
mechanical means and carrying out the excavation. | 150 | m | 27.11 | ₹4,066.5 |
| 1.03 | Refilling the trenches with a wet mix of close graded granular materials (Stone
aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size -
17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings -
4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size
- 20%), mixing properly after adding sufficient quantity of water, refilling in layers
not exceeding 150mm, compacting properly at Optimum Moisture Content with
Surface Plate Vibrator and disposing the excavated material etc. complete, including
traffic control, providing caution boards and as per direction of Engineer-in-charge
for road restoration works in pipeline leak sites. | 6.75 | m3 | 8,793.49 | ₹59,356.06 |
| 1.04 | 00.98.172
Supply of HDPE Pipe PE 100 (IS 4984/1995), 12.5kg, 63mm Outer Dia. | 700 | m | 162.61 | ₹1,13,827 |
| 1.05 | Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already
made, placing in position aligning the pipeline to the lines and levels and jointing the
pipes and specials with solvent cement and testing the pipeline with water to the
required test pressure (excluding cost of pipes and specials): 63mm nominal outside
diameter pipes. | 700 | m | 104.31 | ₹73,017 |
| 1.06 | Providing and fixing G.I. pipes complete with G.I fittings including trenching and
refilling etc. External work50 mm dia nominal bore | 150 | m | 820.36 | ₹1,23,054 |
| 1.07 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :50mm nominal diameter | 2 | NO | 1,101.33 | ₹2,202.66 |
| 1.08 | DISTRIBUTION Excavating trenches of required width for pipes, cables, etc., including excavation for
sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including
getting out the excavated soil, and then returning the soil as required, in layers not
exceeding 20cm in depth, including consolidating each deposited layer by ramming,
watering, etc., and disposing of surplus excavated soil as directed, within a lead of
50m, in all kinds of soil. | 256.5 | m3 | 678.19 | ₹1,73,955.74 |
| 1.09 | Cutting the bituminous / concrete roads with cutting machine for a minimum depth of
200mm along the sides of proposed alignment of the pipe to be laid without causing
any damage to other utilities, including the charges for hire and conveyance of tools
and plant, cost of consumables and charges for lighting, watching, ribbon fencing,
caution boards, traffic diversion, and as per the direction of departmental officers etc.
complete, before carrying out the demolition of bituminous / concrete road by
mechanical means and carrying out the excavation. | 350 | m | 27.11 | ₹9,488.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
NIT.pdf
Tender Documents • 1.70 MB
BOQ_1455810.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].