Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.6 LAdmitted-Finance PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | -2.00% | ₹33.6 L | L1 | Admitted-Finance |
| 2 | L2₹35.9 LAdmitted-Finance DABGRAM COLONY 1 P O RABINDRA SARANI SILIGURI | SILIGURI | WEST BENGAL | +4.50% | ₹35.9 L | L2 | Admitted-Finance |
| 3 | L3₹37.4 LAdmitted-Finance DONNAGAR GANGANAGAR KOLKATA 700132 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | +9.00% | ₹37.4 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 142 HAHIHARPUR KENSHILI USTHI SOUTH 24 PARGANAS WEST BENGAL 743375 | 24 PARAGANAS SOUTH | WEST BENGAL | 743375 | - | - | - | Rejected-Technical Not Qualified |
Tender Value
Refer Docs
EMD Value
₹68,642
Closing Date
17 Mar 2026, 5:00 pmClosed
The General Manager,BKTPS
Bakreswar Thermal Power Project P.O. - BkTPS, District - Birbhum Pin - 731104
OVERHAULING OF U#3 Ash Handling Plant BKTPS IN 2026-2027
2026_WBPDC_1002252_1
WBPDCL/BKTPP/NIT/E4094/25-26
Open Tender
Miscellaneous Services
Item Rate
365 days
at Bakreswar Thermal Power Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹68,642
Yes
Off Line- At the chamber of HOD -CC,BKTPS
18 May 2026
19 Feb 2026
20 Mar 2026
19 Feb 2026
17 Mar 2026
2 Mar 2026
28 Feb 2026
OH OF U#3 BA HOPPER AREA
Replacement/Repairing of Clinker Grinder ( With chute sump and checking/replacement of nozzle, nozzle tip<(>,<)> nozzle holder etc. )
OH of Feed Gate along with Feed Gate ( accessories and including feed gate enclosure box. )
Replacement/Servicing of Jet Pump along ( combine tube, nozzle tip, nozzle holder etc )
Replacement of BA Hopper looking glass/ ( Looking glass assembly. )
Repairing/Checking of BA Hopper manhole ( door. )
Replacement/Servicing of Knife Gate V/V ( 200NB/250NB) at economizer surge hopper & at discharge of Clinker Grinder. )
Replacement/Servicing of 300NB ( 250NB Gate/Globe/Butterfly Valve. )
Replacement/Servicing of 100NB/150NB/ ( 200NB Butterfly/Plug Valve/Gate/Globe Valve. )
Replacement/Servicing of 15NB/25NB/50NB/ ( 65NB/80NB/Gate/Globe/Butterfly Valve/Ball Valve. )
Trough Seal, Economiser Hopper, Eco ( Surge hopper and BA Hopper checking & cleaning. )
OH OF U#3 ESP AREA
Removal, physical inspection, refitting ( And replacement (if required) of ESP Fluidising Tiles. )
Checking, removal, refitting, repairing/ ( Replacement of diffuser feeder assembly (below ESP Hopper<(>,<)> 1st & 2nd field) including checking/replacement of diffuser fluidizing tiles for wet cleaning. )
Checking, removal, refitting, repairing/ ( Replacement of Ash Intake Valve of ESP & APH Hopper for wet cleaning. )
Checking, Repairing/Replacement of Air ( Intake V/V of ESP vacuum header. )
Checking, Repairing/Replacement of ( 10inch/9inch TERSG V/Vs. )
ESP Hopper inside cleaning, checking, ( Repairing (if required) and change of all manhole door packing for wet cleaning. )
Flushing/Cleaning of fluidising air line ( Total ESP & FAE Tower. )
OH OF U#3 FA TOWER AREA
Bag Filter/Cage checking, Cleaning & all ( Bag Filter replacement with pulse jet bar & body checking and repairing )
Replacement/Repairing of Swing ( Disc V/V of Transfer Hopper. )
Replacement/Repairing of Vent ( Valve, equalising valve of Transfer Hopper and NUVA Feeder. )
Physical inspection, ash Cleaning & ( Repairing of ISH & Fluidizing tiles/gasket replacement )
Disposal of ISH ash through tractor
Replacement/Repairing of NUVA ( Feeder diffuser including fluidizing tiles and repairing/replacement of body pad. )
Replacement/Repairing of Collection Tank ( Including checking & replacement of impingement plate and Drop pipe. )
OH of Wetting Head including checking & ( Replacement of nozzle, inlet section, gaskets, tail piece, outlet section etc. )
Replacement/Repairing of Air Washer (Dry ( & Wet) including Checking & replacement of nozzles, gaskets or complete assembly etc. )
PIPELINE & FABRICATION JOB U#3
Rotation/Replacement of 8 inch/9 inch ( including bend/lateral/tool piece & T-joint below ESP Hopper & up to FAE Tower, line alignment checking,repairing/erection of damaged support, gasket replacement etc. )
Replacement of 200NB, 250NB, 300NB MS ( Pipe Line. )
Replacement of 100NB, 150NB MS pipe line
Replacement of 9inch, 10inch DRC Pipe
Replacement of 15NB, 25NB, 40NB, 50NB, ( 65NB, 80NB MS pipe lines. )
Replacement of 9inch/10inch CI/DRC ( Tee/Bend etc. )
Fabrication & Erection of 150NB, 200NB, ( 250NB MS bend. )
Fabrication & Erection of 40NB, 50NB, ( 65NB, 80NB, 100NB MS bend )
HIRING OF HYDRA (CAPACITY 14/20 T) U#3
HIRING OF HYDRA (CAPACITY 14/20 T) ( i) Scope includes Operator & Fuel, lubricant etc. and Break down maintenance, if any. ii) The above service of Hydra to be provided throughout the OH period. )
GST Extra as applicable
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_2456702.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].