Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.6 LAdmitted-Finance PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | -2.00% | ₹33.6 L | L1 | Admitted-Finance |
| 2 | L2₹35.9 LAdmitted-Finance DABGRAM COLONY 1 P O RABINDRA SARANI SILIGURI | SILIGURI | WEST BENGAL | +4.50% | ₹35.9 L | L2 | Admitted-Finance |
| 3 | L3₹37.4 LAdmitted-Finance DONNAGAR GANGANAGAR KOLKATA 700132 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | +9.00% | ₹37.4 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 142 HAHIHARPUR KENSHILI USTHI SOUTH 24 PARGANAS WEST BENGAL 743375 | 24 PARAGANAS SOUTH | WEST BENGAL | 743375 | - | - | - | Rejected-Technical Not Qualified |
Tender Value
Refer Docs
EMD Value
₹68,642
Closing Date
17 Mar 2026, 5:00 pmClosed
The General Manager,BKTPS
Bakreswar Thermal Power Project P.O. - BkTPS, District - Birbhum Pin - 731104
OVERHAULING OF U#3 Ash Handling Plant BKTPS IN 2026-2027
2026_WBPDC_1002252_1
WBPDCL/BKTPP/NIT/E4094/25-26
Open Tender
Miscellaneous Services
365 days
at Bakreswar Thermal Power Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹68,642
Yes
Off Line- At the chamber of HOD -CC,BKTPS
18 May 2026
19 Feb 2026
20 Mar 2026
19 Feb 2026
17 Mar 2026
2 Mar 2026
28 Feb 2026
OH OF U#3 BA HOPPER AREA
Replacement/Repairing of Clinker Grinder ( With chute sump and checking/replacement of nozzle, nozzle tip<(>,<)> nozzle holder etc. )
OH of Feed Gate along with Feed Gate ( accessories and including feed gate enclosure box. )
Replacement/Servicing of Jet Pump along ( combine tube, nozzle tip, nozzle holder etc )
Replacement of BA Hopper looking glass/ ( Looking glass assembly. )
Repairing/Checking of BA Hopper manhole ( door. )
Replacement/Servicing of Knife Gate V/V ( 200NB/250NB) at economizer surge hopper & at discharge of Clinker Grinder. )
Replacement/Servicing of 300NB ( 250NB Gate/Globe/Butterfly Valve. )
Replacement/Servicing of 100NB/150NB/ ( 200NB Butterfly/Plug Valve/Gate/Globe Valve. )
Replacement/Servicing of 15NB/25NB/50NB/ ( 65NB/80NB/Gate/Globe/Butterfly Valve/Ball Valve. )
Trough Seal, Economiser Hopper, Eco ( Surge hopper and BA Hopper checking & cleaning. )
OH OF U#3 ESP AREA
Removal, physical inspection, refitting ( And replacement (if required) of ESP Fluidising Tiles. )
Checking, removal, refitting, repairing/ ( Replacement of diffuser feeder assembly (below ESP Hopper<(>,<)> 1st & 2nd field) including checking/replacement of diffuser fluidizing tiles for wet cleaning. )
Checking, removal, refitting, repairing/ ( Replacement of Ash Intake Valve of ESP & APH Hopper for wet cleaning. )
Checking, Repairing/Replacement of Air ( Intake V/V of ESP vacuum header. )
Checking, Repairing/Replacement of ( 10inch/9inch TERSG V/Vs. )
ESP Hopper inside cleaning, checking, ( Repairing (if required) and change of all manhole door packing for wet cleaning. )
Flushing/Cleaning of fluidising air line ( Total ESP & FAE Tower. )
OH OF U#3 FA TOWER AREA
Bag Filter/Cage checking, Cleaning & all ( Bag Filter replacement with pulse jet bar & body checking and repairing )
Replacement/Repairing of Swing ( Disc V/V of Transfer Hopper. )
Replacement/Repairing of Vent ( Valve, equalising valve of Transfer Hopper and NUVA Feeder. )
Physical inspection, ash Cleaning & ( Repairing of ISH & Fluidizing tiles/gasket replacement )
Disposal of ISH ash through tractor
Replacement/Repairing of NUVA ( Feeder diffuser including fluidizing tiles and repairing/replacement of body pad. )
Replacement/Repairing of Collection Tank ( Including checking & replacement of impingement plate and Drop pipe. )
OH of Wetting Head including checking & ( Replacement of nozzle, inlet section, gaskets, tail piece, outlet section etc. )
Replacement/Repairing of Air Washer (Dry ( & Wet) including Checking & replacement of nozzles, gaskets or complete assembly etc. )
PIPELINE & FABRICATION JOB U#3
Rotation/Replacement of 8 inch/9 inch ( including bend/lateral/tool piece & T-joint below ESP Hopper & up to FAE Tower, line alignment checking,repairing/erection of damaged support, gasket replacement etc. )
Replacement of 200NB, 250NB, 300NB MS ( Pipe Line. )
Replacement of 100NB, 150NB MS pipe line
Replacement of 9inch, 10inch DRC Pipe
Replacement of 15NB, 25NB, 40NB, 50NB, ( 65NB, 80NB MS pipe lines. )
Replacement of 9inch/10inch CI/DRC ( Tee/Bend etc. )
Fabrication & Erection of 150NB, 200NB, ( 250NB MS bend. )
Fabrication & Erection of 40NB, 50NB, ( 65NB, 80NB, 100NB MS bend )
HIRING OF HYDRA (CAPACITY 14/20 T) U#3
HIRING OF HYDRA (CAPACITY 14/20 T) ( i) Scope includes Operator & Fuel, lubricant etc. and Break down maintenance, if any. ii) The above service of Hydra to be provided throughout the OH period. )
GST Extra as applicable
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_2456702.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid