| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹3.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.3 Cr+₹13.4 L (4.21%)Rejected-Finance 0 STATION ROAD PARICHHA PARICHHA NEAR BANK OF INDIA JHANSI UTTAR PRADESH 284305 | JHANSI | UTTAR PRADESH | 284305 | ₹3.3 Cr+₹13.4 L (4.21%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical CG 14 AJAY VIHAR GOVIND PURAM DISTT GHAZIABAD U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | M/S Singh Construction L2 | GSB DEVELOPERS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in covering of geo-bag on bank slope and patra in all type of soil including all lead & lift, dressing with mannual compaction etc. required for proper completion of work T&P etc. as per direction of Engineer-in charge. | 6,137.5 | M3 | 25 ₹1,53,437.5 Lowest | 50 ₹3,06,875 |
| 2.00 | Supplying, laying and placing of 9mm, 4 strands Polypropelene Rope Gabion size ( 1.8m x 1.8m x 0.5m) with lid only, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) filled with RBM in geotextile bags size (1.00mx0.75m) fabricated from Engineered Textile" manufactured from 100% PP multifilament yarn by machine in cross direction,woven into stable network such that the yarn retains their relative position.The fabric used for bags shall be (200 GSM)TFI 1200 or equivalent and meet the criteria given under technical specification and have high UV resistance, inert to biological degradation and resistant to naturally encountered chemicals like acids and alkalies, Including cost of material, labour, Contractor profit, T&P etc. Required for proper completion of work as per specification and direction of Engineer-in-Charge. | 12,160.38 | M3 | 1,710 ₹2,07,94,249.8 Lowest | 1,800 ₹2,18,88,684 |
| 3.00 | Centering & Shuttering for C.C. Block (size 1.50M x 1.50M x 1.50M) including cost of Shuttering, Labour and T&P etc. required for proper completion of work, as per specification and direction of Engineer-in-Charge. | 3,888 | M2 | 240 ₹9,33,120 Lowest | 400 ₹15,55,200 |
| 4.00 | Providing and laying of cement concrete for C.C. Block (size 1.50M x 1.50M x 1.50M) with cement, coarse sand and stone grit in the proportion of 1:3:6, including mechanical mixure and mechanical vibrator all cost of material labour T&P etc required for proper completion of work. as per specification and direction of Engineer-in-Charge. | 1,458 | M3 | 7,700 ₹1,12,26,600 | 5,500 ₹80,19,000 Lowest |
Tender Value
₹4.9 Cr
EMD Value
₹9.8 L
Closing Date
16 Mar 2026, 2:00 pmClosed
SE
SE Flood Circle Lakhimpur Kheri
ANTI EROSION WORK NEAR BARA GURUDWARA BY REPLACING E.C. BAG STUD TO C.C. BLOCK STUD AT R/B OF RIVER MOHANA/KAURIALA IN DISTRICT - LAKHIMPUR-KHERI.
2026_UPIDC_1122699_5
03/SE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Lakhimpur Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹9.8 L
Lakhimpur
23 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
10 Mar 2026
Earth work in covering of geo-bag on bank slope and patra in all type of soil including all lead & lift, dressing with mannual compaction etc. required for proper completion of work T&P etc. as per direction of Engineer-in charge.
Supplying, laying and placing of 9mm, 4 strands Polypropelene Rope Gabion size ( 1.8m x 1.8m x 0.5m) with lid only, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) filled with RBM in geotextile bags size (1.00mx0.75m) fabricated from Engineered Textile" manufactured from 100% PP multifilament yarn by machine in cross direction,woven into stable network such that the yarn retains their relative position.The fabric used for bags shall be (200 GSM)TFI 1200 or equivalent and meet the criteria given under technical specification and have high UV resistance, inert to biological degradation and resistant to naturally encountered chemicals like acids and alkalies, Including cost of material, labour, Contractor profit, T&P etc. Required for proper completion of work as per specification and direction of Engineer-in-Charge.
Centering & Shuttering for C.C. Block (size 1.50M x 1.50M x 1.50M) including cost of Shuttering, Labour and T&P etc. required for proper completion of work, as per specification and direction of Engineer-in-Charge.
Providing and laying of cement concrete for C.C. Block (size 1.50M x 1.50M x 1.50M) with cement, coarse sand and stone grit in the proportion of 1:3:6, including mechanical mixure and mechanical vibrator all cost of material labour T&P etc required for proper completion of work. as per specification and direction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BidPDF.pdf
Tender Documents • 1.25 MB
BOQ_2090936.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .