Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LQualified | ₹8.2 L | L1 | Qualified MII |
| 2 | L2₹33.9 LQualified | ₹33.9 L | L2 | Qualified MSE, MII, Category: General |
| 3 | Disqualified | - | - | Disqualified MSE, MII, Category: OBC |
| 4 | Disqualified | - | - | Disqualified MSE, MII, Category: SC |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
18 May 2026, 12:00 pmClosed
Architecture Services
Structure Services
Detailed Estimate
Soil investigation
Conducting soil investigation
Excavation of soil
Field Test
Concluding Field determination
9267863
GEM/2026/B/7484617
Two Packet Bid
Architecture Services,Structure Services,Detailed Estimate,Soil investigation,Conducting soil inves
Porbandar, Gujarat
Total value wise evaluation
BOQ
7 documents required · 7 mandatory
3 yrs
40%
Offg SBSO, CWE SUBS MUMBAI, Department of Military Affairs, Indian Army, Ministry of Defence, (Patil Krishna Tukaram)
₹30,000
27 May 2026
8 May 2026
18 May 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Architecture Services | Architecture Services Preparation of complete conceptual plans as per specified in specification of documents | 1,126 | Sqm | Porbandar | 30 |
| 2 | Structure Services | Structure Services Structural design and drawing for all buildings as per specified in specification of documents | 1,126 | Sqm | Porbandar | 30 |
| 3 | Detailed Estimate | Detailed Estimate preparation of BOQ and Yardstick as per specified in specification of documents | 1,126 | Sqm | Porbandar | 30 |
| 4 | Soil investigation | Soil investigation Geotechnical Investigation
Mobilization and demobilization as per specified in specification of documents | 1 | LS | Porbandar | 30 |
| 5 | Conducting soil investigation | Conducting soil investigation bore hole as per specified in specification of documents | 5 | Nos | Porbandar | 30 |
| 6 | Excavation of soil | Excavation of soil by trial pit method as per as per specified in specification of documents | 1 | Nos | Porbandar | 30 |
| 7 | Field Test | Field Test Mobilization and demobilization of as per specified in specification of documents | 1 | LS | Porbandar | 30 |
| 8 | Concluding Field determination | Concluding Field determination of Modulus of Subgrade as per specified in specification of documents | 5 | Nos | Porbandar | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9267863.pdf
GEM_BID • 0.15 MB
boq_2026-04-28-15-54-03_179c394cab912e0c5a6eb8031bdf3899.pdf
BOQ • 1.41 MB
boq_item_sample_file_-4_2026-04-28-15-54-03_e3241d8f031d63f3c155022d276abb56.csv
BOQ • 0.00 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid