Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-Finance ODISHA OB | BALESHWAR | ODISHA | 756001 | ₹16.0 L | L1 | Accepted-Finance 08NOS BIDDER QUOTED RATE1603456.678 |
| 2 | L1₹16.0 LAccepted-Finance | ₹16.0 L | L1 | Accepted-Finance 08NOS BIDDER QUOTED RATE1603456.678 |
| 3 | L1₹16.0 LAccepted-Finance | ₹16.0 L | L1 | Accepted-Finance 08NOS BIDDER QUOTED RATE1603456.678 |
| 4 | L1₹16.0 LAccepted-Finance C O C CLASS CONTRACTOR | ₹16.0 L | L1 | Accepted-Finance 08NOS BIDDER QUOTED RATE1603456.678 |
| 5 | L1₹16.0 LAccepted-Finance | ₹16.0 L | L1 | Accepted-Finance 08NOS BIDDER QUOTED RATE1603456.678 |
Tender Value
₹16.2 L
EMD Value
₹16,197
Closing Date
31 Jul 2026, 5:30 pmClosed
DFO, ANANDAPUR
DIVISIONAL FOREST OFFICER, KEONJHAR WL DIVISION, ANANDAPUR
Construction of Multiproduct Cluster Buildng at Kathakata under Hadagarh (WL) Range..
2026_DFOKW_136963_1
DFO-KJR-WL-01 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
KATHAKATA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,197
Yes
6 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
24 Jul 2026 - 30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil within 50 m initial loead and initieal lift, including dressing and levelling the bed etc. complete | - | Cum | 282.9 | - |
| 2 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. | 1 | Cum | 643 | ₹642.36 |
| 3 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | - | Cum | 6,559.5 | - |
| 4 | R.C.C. M-20 using 20 mm & down size h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. A. For Column Base | 1 | Cum | 7,984.24 | ₹7,976.26 |
| 5 | B. Plinth Beam | - | Cum | 8,884.55 | - |
| 6 | Column / Beam (Ground Floor) | - | Cum | 19,951.1 | - |
| 7 | Lintel (Ground Floor) | - | Cum | 15,965.5 | - |
| 8 | R.C.C. Chajja (Ground Floor) | 1 | Sqm | 1,286.9 | ₹1,285.61 |
| 9 | Roof Slab (Ground Floor) Toilet | - | Sqm | 14,807.4 | - |
| 10 | Cutting, Bending, binding and tying the grills and placing in position including cost, conveyance, taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | - | Qntl | 8,733.5 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_603143.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
DTCNkathakata01.pdf
Tender Documents • 1.88 MB
BOQ_603143.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .