Loading…
Loading…
Tender Value
₹1.0 L
EMD Value
₹1,100
Closing Date
6 Aug 2026, 6:00 pm
Office of Executive Engineer
Construction of Additional Structure (i.e. Pipe VRB) at Ch.975 mt on Kharva Branch Minor-VI off taking from Kharva Minor-VI of Gundiyala Distributary (LD-03)
326706
02-2026/27
Open
Miscellaneous Works
Works
Botad
7 documents required · 6 mandatory · 1 optional
₹708
Executive Engineer, Saurashtra Branch Canal Division No.3/1, Botad
₹1,100
23 Jul 2026
23 Jul 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 3/1, Botad.
Construction of Additional Structure (Pipe VRB) at Ch.975 mt on Kharva Branch
Work: - Minor-VI off taking from Kharva Minor-VI of Gundiyala Distributary (LD-03).
Sr. No Item Description Unit Quantity Rate Amount
Excavation in all sort of strata and formations
incl. depositing the unuseful excavated stuff as
and where directed incl sorting and stacking
useful materials as directed up to 30 mt lead
etc. complete incl. dewatering.
(Depth 0 TO 3.0 mt) (For all type canal &
foundation trenches of C.D. works) A) IN
OVERBURDEN INCL. HARD MURRUM.
Prov. & laying in position "NOMINAL MIX'
cement concrete using cement, sand and
crushed aggregate by mass and machine mix
for C.C. work incl. necessary formworks
centering scaffolding compaction by
mechanical vibrator, curing as directed with all
lead & lift etc. complete For General Purpose
(C) Concrete grade 1:2:4 and MSA-40mm
Prov. & laying in position "NOMINAL MIX'
cement concrete using cement, sand and
crushed aggregate by mass and machine mix
for C.C. work incl. necessary formworks
centering scaffolding compaction by
mechanical vibrator, curing as directed with all
lead & lift etc. complete For General Purpose
(E) Concrete grade 1: 1.5 :3 and MSA-20mm
Providing, supplying, Lowering, and laying
ISI Standard R.C.C. NP-3 Class pipes in
standard lengths of following Diameter
suitable for either collar joints or rubber ring
joints including all taxes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to Site, and jointing in proper
4 position, grade and alignment at all level as Rmt. 10.0 1535.0
directed by Engineer-in-charge including all
labour, giving hydraulic testing as per ISI code.
NOTE: - One collar should be supplied with
each full length plain ended RCC pipe, cost
included in rates below. One rubber ring
should be supplied with each full length
socketed pipe, cost included in rates below.
Earthwork / Back filling with selected earth
brought from outside borrow area or from
5 excavated useful material incl. watering Cu.mt 170.15 141.0
ramming, Compaction with pneumatic temping
and all lead and lift etc. complete.
Total cost of work Rs.
I/We am/are willing to carry out the work at…...................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item(with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)
(C)NetTendered Amount(A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Nominal Mix the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC) in all the
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
Nivida.pdf
Additional Structure DTP Kharwa Minor.pdf
Amendment-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].