Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
11 Dec 2025, 3:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM BTPS
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin-712503
Removal of Mill rejection coal dust debris earth etc and Disposal of Stone Boulders and Assorted refuses at BTPS
2025_WBPDC_938766_1
WBPDCL/BTPS/NIT/E2723/25-26
Open Tender
Support/Maintenance Service
Item Rate
730 days
Bandel Thermal Power Station
Please refer Tender documents
5 documents required · 5 mandatory
₹0
₹3.1 L
Yes
Administrative Building, BTPS, Hooghly
14 Jan 2026
8 Nov 2025
13 Dec 2025
10 Nov 2025
11 Dec 2025
25 Nov 2025
15 Nov 2025
Supply of unskilled workman [01 no. Listed worker for 10 months)Covered under Medical insurance] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually. Category I. Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%. (ii) Mandays means physical attendance & CL if any & Holiday if any. (iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates. Category I. (Please enter Basic Rate in Rs.33,245.27 for this item.)
Supply of unskilled workman [21 nos. Listed worker (19 heads for 48 months, 01 head for 19 months & 01 head for 21 months)Covered under Medical insurance] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually. Category II. Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%. (ii) Mandays means physical attendance & CL if any & Holiday if any. (iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates. Category II. (Please enter Basic Rate in Rs.32,480.31 for this item.)
Supply of unskilled workman [01 no. Listed worker for 24 months)Covered under ESI] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually. Category III. Note: - (i) In case of absent from duty by any worker on working day or enjoying C.L (Max. 14 days/head/year) or enjoying listed Holiday (Max. 14 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%. (ii) Mandays means physical attendance & CL if any & Holiday if any. (iii) Wages plus benefits including Medical allowance, PF, Bonus, O.T., listed Holiday, House rent allowance and Welfare allowance are included in rates. Category III. (Please enter Basic Rate in Rs.25,561.92 for this item.)
Supply of unskilled workman [02 no. Non-Listed worker for 24 months)Covered under ESI] including all benefits for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E.I.C. Loading at first point and unloading at site manually. Category IV. Note: - (i) In case of absent from duty by any worker on working day or enjoying E.L (Max. 15 days/head/year) or enjoying listed Holiday (Max. 7 days/head / year) necessary deduction will be made from monthly bill as per prevailing norms for different categories + estimated profit @ 8.00%. (ii) Mandays means physical attendance & CL if any & Holiday if any. (iii) Wages plus benefits including ESI, PF, Bonus, O.T., EL, listed Holiday, House rent allowance and others allowance are included in rates. Category IV. (Please enter Basic Rate in Rs.21,309.65 for this item.)
Service Charges on labour cost against engaged workers Category I-IV
Cost of Tools & Tackles on labour cost against engaged workers Category I-IV
Annual Cost of PPE (on reimbursement basis at actual) for 23 Nos Listed workers. For each worker; soap (06 nos. per month), Duster (04 nos. per year), Helmet(01 no / 2 year), Safety shoe (01 No/2 year), Gumboot (01 pair / year), Hand gloves (01 pair per month), Nose guard (02 nos. per month) to be supplied in consultation with Fire & Safety Deptt. HR & A Deptt., and Utilizer Deptt. BTPS. (The PPE quantities are indicative only, but does not absolve the responsibilities of executing agency to maintain the safety standard applicable within factory area)
Annual Cost of PPE (on reimbursement basis at actual) for 02 No Non-Listed workers. For each worker; Helmet (01 no / 2 year), Safety shoe (01 No/year), Gumboot (01no. /year), Hand gloves (01 pair per month), Nose guard (02 nos per month) to be supplied in consultation with Fire & Safety Deptt., HR & A Deptt., and Utilizer Deptt., BTPS. (The PPE quantities are indicative only, but does not absolve the responsibilities of executing agency to maintain the safety standard applicable within factory area)
Carriage of mill rejects, other debris like earth, brick bats, stone metals, stone chips, gravels, slag metal, shingles, stone etc. & similar miscellaneous materials, scrap mixed with iron scrap, rubbish, dry leaves, lopped tree branches, grasses, cinder, accumulated ash etc. from bottom ash hopper, coal mill area, ESP area, crusher house 8A-8B, 1A-1B, 11A-11B, guest house, cement go-down, Intake pump house and other different areas inside & outside of plant area and assorted other materials by trucks up to a distance of 5KM. within the plant area including loading in to the truck at the lifting point and unloading at destination (including dressing & carriage by head load 30 Mtr. at each of the two point and sprinkling water during loading, transit & unloading if required including tools & tackles and incidental charges all complete) dumping the same at low lying area of WBPCDL's land completed as per direction of the EIC. (Measurement will be taken on truck or stack measurement /lorry & usual 1/8th shrinkage will be deducted). The contractor shall have to maintain at his own cost the temporary approach road to different points for plying trucks.
Carriage & removal of Coal reject boulders & big coal from Wagon Tripler area to reject yard and coal yard respectively and coal form Coal Mill area to coal yard or any other area inside & outside of plant premises as per direction of EIC including tools & tackles and incidental charges all complete. Distance carried not exceeding 5 km.
Cost of GPA Insurance for engaged worker Category I-IV
Cost of WC Insurance for engaged worker Category I-IV
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.17 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_2216156.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .