| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC DHALIWAL | JALANDHAR | PUNJAB | 144001 | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹16.1 L+₹1.2 L (8.09%)Rejected-Finance VILLAGE BALOH PO NANWAN TEHSIL GHUMARWIN DISTT BILASPUR H P | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹18.4 L+₹3.5 L (23.3%)Rejected-Finance VILL BHAGOUT P O MANJHWAR TEHSIL GHUMARWIN DISTT BILASPUR H P 174003 | BILASPUR | HIMACHAL PRADESH | 174003 | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹18.5 L+₹3.6 L (24.3%)Rejected-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | L4 | Rejected-Finance Due to L4 |
Tender Value
₹21.3 L
EMD Value
₹39,400
Closing Date
19 Sept 2022, 10:30 amClosed
Executive Engineer
Division No.1, HPPWD Bilaspur
Hume pipe culvert.
2022_PWD_64865_4
PW-BLP1-CBeproc/22-8064-8105 dt 28.7.22
Open Tender
Civil Works - Roads
Item Rate
180 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹39,400
3 Mar 2023
12 Sept 2022
19 Sept 2022
12 Sept 2022
19 Sept 2022
12 Sept 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas all depth / width as well as 10 sqm (Ten square metre) on plan) as per techanical specification clause 1104. including getting out and disposal of excavated earth upto all lead and lift as directed by Engineer-in-charge. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (One Cement : Three coarse sand) : Six graded stone aggregate 20 mm (Twenty milimetre) nominal size) cement content not less then 250kg/cum (Two hundred fifty kilograme / per cubic metre) as per techanical specification clause 802, 803, 1202 and 1203.. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (One Cement : four coarse sand) : Eight graded stone aggregate 40 mm (Forty milimetre) nominal size).cement content not less then 170kg/cum (One hundred seventy kilograme / per cubic metre) as per techanical specification clause 802, 803, 1202 and 1203. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (One cement : Five fine sand : Ten graded stone aggregate 40 mm (Forty milimetre) nominal size). cement content not less then 130kg/cum (One hundred thirty kilograme / per cubic metre) as per techanical specification clause 802, 803, 1202 and 1203. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm (One hundred milimetre) dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (One cement : Two fine sand) as per techanical specification clause 1108. including testing of joints etc. complete : 900 mm (Nine hundred milimetre) dia. R.C.C. pipe. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Rattan Singh
SONU KUMAR
Anil Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .