Assistant General Manager (Commercial)
Tender for Rate Contract for Scaffolding Supply, Erection and Dismantling services At 148-A Village: Mora, Post Bhatha, Opp. L&T, Surat-Hazira Road, Surat-394517 Gujarat, India
306530
GSEG/COM/CCPP/Scaffolding/2026-27/05
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 1 mandatory · 1 optional
₹2,360
Gujarat State Energy Generation Limited, Gandhinagar (Gujarat)
₹17,000
28 Jul 2026
19 May 2026
28 Jul 2026
19 May 2026
28 Jul 2026
19 May 2026
Estimated Cost of the tender items. Rs. 17 lacs (including GST)
Tender Fees Amount Rs.2,360/- (including 18% GST)
Earnest Money Deposit Amount By D.D. Rs. 17,000/-
Online [e-tendering ] tender/offer submission 11th June,
last date up to 15:00 hrs only
Physical receipt of all the relevant documents 11th June,
last date up to 14:00 hrs
Date of opening of Envelope for Tender fee, 11th June,
EMD and technical BID physical as well as on
line opening at 16:00 Hrs.
Time allowed for the said Work Rates shall be applicable for the
Bid Validity 180 days from last date of BID
BIDDER need not to buy Tender from GSEG office. BIDDER can download Tender
Documents from the Web-Site and submit tender fee at the time of submission of
Physical Tender. BIDDERs should be in touch with website
https://gsegtender.nprocure.com for information regarding revision/corrigendum/
amendment in tender till due date of on line submission and thereafter. No separate
correspondence/ advertisement will be done in this regard.
Assistant General Manager (Commercial)
GSEG, Gandhinagar
ARC - Scaffolding services Page 1 of
Gujarat State Energy Generation Limited
GUJARAT STATE ENERGY
GENERATION LTD.
Rate Contract for Scaffolding Supply, Erection and Dismantling
148-A Village: Mora, Post Bhatha, Opp. L&T,
Surat-Hazira Road, Surat-394517
Corporate Office:
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
ARC - Scaffolding services Page 2 of
Gujarat State Energy Generation Limited
ARC - Scaffolding services Page 3 of
Gujarat State Energy Generation Limited
1. Introduction
GSEG (herein after referred to as Owner) is registered company under the
Company’s Act and is engaged in power generation by harnessing the eco-
friendly and economical natural gas in Gujarat. GSEG is inviting BIDs from the
qualified BIDDERs for Rate Contract for Scaffolding Supply, Erection and
Dismantling services at GSEG’s 351 MW Combined Cycle Power Plant at Hazira
Surat for two years.
2. Scope of Enquiry
The scope of work covered in this specification, in general, comprises of
Rate Contract for Scaffolding Supply, Erection and Dismantling services at
GSEG’s 351 MW Combined Cycle Power Plant at Hazira Surat for two years.
3.1. This tender document and its contents are confidential. Accordingly, this
tender document and its contents, or any information, which shall be made
available in connection with any further queries, must be held in complete
3.2. By accepting this tender document, the recipient acknowledges and agrees that:
3.2.1. All of the information contained herein is of a highly confidential nature and
the recipient shall keep all such information and all other information made
available to the recipient in connection with any further investigation
3.2.2. None of such information shall be used by the recipient or any employees or
representatives of the recipient in any manner, whatsoever, in whole or in part,
other than in connection with its submission of BID.
3.2.3. The recipient shall not reproduce this tender document or disclose any
particulars of this tender document in any trade or technical paper or
elsewhere, in whole or in part, and will not distribute all or any portion of this
tender document to any person other than the recipient’s employees or
representatives who have a need to know such information for the purpose set
above and who are informed by the recipient of the confidential nature of such
3.2.4. Any proposed action by the recipient which shall be inconsistent in any
manner with the foregoing agreement shall require the prior written consent
ARC - Scaffolding services Page 4 of
Gujarat State Energy Generation Limited
3.2.5. The recipient shall indemnify the Owner in case of breach of the above. If the
confidential details relating to this Contract or its contents are received by a
third party from the recipient or its employees or its representatives and the
third party makes use of these details to cause harm or monetary loss to the
Owner or use this tender document for their personal gain / monetary gain,
the recipient shall compensate the Owner for the loss suffered as well as for
the value of gain derived by the third party. The recipient shall not use the
confidential details of the tender document for any other purpose except for
the strict purpose of Biding.
ARC - Scaffolding services Page 5 of
Gujarat State Energy Generation Limited
INSTRUCTION TO BIDDER
ARC - Scaffolding services Page 6 of
Gujarat State Energy Generation Limited
1. About BID DOCUMENT
1.1. Definitions
“GSEG” shall mean M/s. Gujarat State Energy Generation Ltd, having its office at.
2nd Floor, Building no. A/78/3-8, Besides iGATE, GIDC Electronic Estate, Sector-
25, Gandhinagar - 382 016 and shall include all their legal representatives and
“BID DOCUMENT” includes the complete set of documents attached hereto
including all Annexure(s), forms, and BID Amendments, if any.
“BIDDER” shall mean an individual or firm or their legal representative who has
received the BID DOCUMENT and is submitting the BID as per the terms &
conditions herein.
“Contractor” shall mean the successful selected Bidder / person or persons, firm or
company or corporation, whose BID has been accepted by the Owner and includes
the Contractor’s legal representative, his successors and permitted assignees.
1.2. Contents of BID DOCUMENT
The BID Invitation Document has been prepared for the purpose of inviting BIDs
for Rate Contract for Scaffolding Supply, Erection and Dismantling services at
GSEG’s 351 MW Combined Cycle Power Plant at Hazira Surat for two years. The
BID DOCUMENT comprises of:
Section 1: Preamble
Section 2: Instruction to BIDDER
Section 3: BIDDER Qualifying Criteria
Annexure 1: Letter of Undertaking
Annexure 2: Information and Documentary Evidence of the BIDDER’s
Annexure 3: CA Certificate for Turn Over
Annexure 4: Details of the Assignments in Last Three Years
Annexure 5: Confirmation of Submission of Price BID/ Proposal
Annexure 6: Format for online submission of price proposal
Section 4: General Terms and Conditions
ARC - Scaffolding services Page 7 of
Gujarat State Energy Generation Limited
Section 5: Scope of Work/ Technical Specifications
1.3. Intent of Inquiry
1.3.1. The enquiry is invited from reputed BIDDER for Scaffolding Supply,
Erection and Dismantling services at GSEG’s 351 MW Combined Cycle
Power Plant at Hazira Surat for two years.
1.3.2. The enquiry specification comprises of Introduction and Scope of Enquiry,
Instruction to BIDDER, Conditions of Contract, Project Information,
Technical information, Annexure(s) & Schedules.
1.3.3. The enquiry specification explains in detail the scope of the Contractor. The
statements and explanations contained in this regard shall be intended to
provide a proper understanding to BIDDER but shall not be construed as
limiting Contractor’s responsibilities and / or Owner’s right to amend / change
the scope or the terms. It shall be clearly understood that the intent of the
Owner shall be that the BIDDER shall execute this Contract as specified and
as required subject to the points explicitly identified and consequently, any
omissions, conflicts or contradictions in these specifications shall be noted,
interpreted and applied appropriately to give effect to this intent. Claims or
disputes on account of wrong interpretation or willful misinterpretation of this
intent by BIDDER after award of Contract shall not be entertained by Owner
nor shall they be legally binding on Owner.
2. Location of Work/ Supply
The work/ services are to be executed/ provided at GSEG’s Combined Cycle
Power Plant at 148-A Village: Mora, Post Bhatha, Opp. L&T, Surat-Hazira
Road, Surat-394510, Gujarat, India.
3. Instruction to BIDDER
3.1. The BIDDER shall bear all costs associated with the preparation and
submission of the BID and GSEG will, in no case be responsible or liable for
these costs regardless the conduct or outcome of the process. The BIDDER is
expected to examine all instructions, forms, terms & conditions in the BID
3.2. GSEG reserves the right to cancel any or all the BIDs as per its discretion
without assigning and giving any reason thereof. GSEG also reserves right to
rescind the process of this BID at any time before placement of the order for
the said scope of work herein.
ARC - Scaffolding services Page 8 of
Gujarat State Energy Generation Limited
3.3. The BIDDER shall prepare the BID based on the information furnished and
terms & conditions provided in the BID DOCUMENT. The BIDDER shall
undertake and shall be deemed to have undertaken a thorough study of the
proposed work, the job site(s) involved, the site conditions, the labour, power,
water, material and equipment availability, transport and communication
facilities and temporary offices and accommodation quarters and all other
factors, constraints and facilities necessary for the formulation of the BID,
supply of materials and the performance of the work(s) as envisaged in this
document. The BID shall also contain all the information asked in the BID
DOCUMENT with supportive data wherever necessary.
3.4. BIDDER shall visit, inspect and examine the site(s) and its surroundings and
shall satisfy himself before submitting his BID as to the nature of the ground
present, physical conditions and all roads, approaches and lands which may be
used temporarily otherwise in connection with the works, means of access to
the site accommodation he may require and in general shall himself obtain all
necessary information as to risks, contingencies and other circumstances which
may influence or affect his BID.
3.5. Failure to furnish all information required by the BID DOCUMENT(s) or
submission of a BID not substantially responsive to the BID DOCUMENT(s)
will be at the BIDDER’s risk and may result in the rejection of the BID.
3.6. The BID submitted is to be signed by a person who is a duly authorized by the
company. A proof in this regard to be submitted in the Technical BID.
3.7. This BID DOCUMENT is non-transferable. Each BIDDER shall submit only
one BID by himself. Joint Venture or Consortium BID is not allowed.
3.8. At any time prior to the deadline for submission of BID, for any reason, whether
at its sole initiative or any response to a clarification requested by a BIDDER,
GSEG may modify the BID DOCUMENT(s) by amendment(s) thereto. The
amendment(s) will be notified on https://gsegtender.nprocure.com website. The
BIDDERs are advised to check website for the same.
3.9. The BID prepared by the BIDDER and all correspondence and documents
relating to the BID exchanged between the BIDDER and the GSEG shall be
written in English language only.
4. Tender Fee & Earnest Money Deposit (EMD)
4.1. The BIDDER shall deposit non-refundable Tender Fee of Rs.2,360/-
(including GST @18%) in the form of an Account Payee Demand Draft from
ARC - Scaffolding services Page 9 of
Gujarat State Energy Generation Limited
a scheduled bank payable at Gandhinagar/ Ahmedabad at the time of
submission of the physical Technical BID or deposit online.
4.2. The BIDDER shall deposit Earnest Money Deposit for an amount of
Rs.17,000/- (Rupees Seventeen Thousand only) in the form of an Account
Payee DD or deposit online. No interest shall be paid on EMD.
4.3. Following are the bank details for submission of Tender fees and EMD:
Name of Beneficiary: GUJARAT STATE ENERGY GENERATION LTD
Name of the Bank: BANK OF BARODA
Name of the Branch: MID CORP BRANCH, AHMEDABAD
Types of Account: CC ACCOUNT
IFSC Code: BARB0MIDAHD
4.4. On online submission of tender fees/ EMD, you are kindly requested to share
the GST details of your company on the same day of amount transfer to
[email protected] with a copy to: [email protected].
4.5. Any BID not accompanied by Tender Fee, BID Security/ EMD shall be
rejected. Please furnish details of Tender Fee & EMD paid on the envelope.
4.6. EMD securities of the unsuccessful BIDDERs will be returned after expiry of
the final BID validity and after award of contract to the successful Bidder. In
case of non-receipt of the such amount, kindly send the request to:
[email protected] with a copy to: [email protected].
4.7. EMD of the successful BIDDER shall be released along with the payment of
services done on request by the contractor. If required, validity of the EMD of
the successful BIDDER shall be extended further.
4.8. EMD shall be forfeited if the BIDDER withdraws his BID during the period
of BID validity. EMD shall be forfeited, if the successful BIDDER doesn’t
respond/ refuses or neglects to execute the contract on issuance of LOI/ Work
5. BID Clarification/ Amendment
5.1. The prospective BIDDER requiring any clarification shall write to GSEG on
or before the last date of BID Clarification so as to ensure submission of BID
on or before the Last Date of Submission of BID and the GSEG will notify on
https://gsegtender.nprocure.com website. The BIDDERs are advised to check
website for the same.
5.2. At any time prior to the Last Date Of Submission of BID, GSEG, for any
reason, whether at his sole initiative or any response to a clarification requested
ARC - Scaffolding services Page 10 of
Gujarat State Energy Generation Limited
by a prospective BIDDER, may modify the BID DOCUMENT(s) by
amendment(s) thereto. The amendment(s) will be notified on
https://gsegtender.nprocure.com website. The BIDDERs are advised to check
website for the same.
6. BID Validity
The BID shall be kept valid for at least 180 days from the Last Date of BID
Submission. A BID with validity for a shorter period than the above may be
rejected by GSEG. If required, GSEG may solicit the BIDDER’s consent to an
extension of the period of BID validity.
No deviations to be taken by the BIDDER to the BID Document(s). BIDs with
any deviation are liable for summarily rejection.
8.1. The price quoted by the BIDDER shall be all inclusive considering the total
scope of work as envisaged in the BID DOCUMENT.
8.2. The price should be quoted in Indian Rupees only.
9. Submission of BID
9.1. All the relevant documents as per requirement of the Bid document must be
submitted physically along with the Tender Fee & EMD in sealed cover so that
the same is received in this office on OR before the due date and time.
9.2. BIDDERs are requested to submit price – BID on-line only and not to submit
the price BID in physical form. BIDDER to confirm submission of online Price
BID in Annexure 5. This is mandatory. Only on-line submitted price BID will
be considered for evaluation. Format for online price bid is at Annexure
9.3. It is mandatory for all the BIDDERs to submit their Technical BID documents
physically in schedule time.
9.4. The Technical BID along with Tender Fee and EMD, prepared by the BIDDER
shall be in One Original and two copies in separate envelopes. The envelope
should be marked as “Original”, “Copy 1” & “Copy 2” respectively.
9.5. The Technical BID must contain following details / Documents. All the
documents must be stamped and self-certified.
9.5.1. Proof of Tender Fee in form of Account Payee DD. EMD payment, either in
form of Account Payee DD, in Favour of GSEG, in separate envelope super
scribing “Tender Fee and EMD”.
ARC - Scaffolding services Page 11 of
Gujarat State Energy Generation Limited
9.5.2. Annexure 1 – Letter of Confirmation with respect to understanding of the
complete scope of services as envisaged, No Deviation in the BID Document.
9.5.3. Copy of power of Attorney / Authority to sign the BID Documents.
9.5.4. Annexure 2 – Details of the Company
9.5.5. Annexure 3 – Certificate from Practicing Chartered Accountant for the year
9.5.6. The List of jobs carried out by the BIDDER for Similar Work in Previous
years and its Documentary evidences to substantiate the same. (Annexure 4).
9.5.7. Confirmation by BIDDER for Online submission of Financial Proposal
9.6. If required the GSEG may ask for the additional information as well as may
invite the BIDDER for discussion on its BID.
9.7. The Envelopes containing information as per above instructions, must be
sealed individually with super scribed as follows:
Envelop 1 containing Tender Fee and EMD: “Tender Fee and EMD”
Envelope 2 containing Original of Technical BID: “Original: Technical
Envelope 3 containing Copy 1 of Technical BID: “Copy 1: Technical BID”
Envelope 4 containing Copy 2 of Technical BID: “Copy 2: Technical BID”
All the above mentioned four envelopes are to be placed in another bigger
envelope which is to be super scribed as “BID for Scaffolding Supply, Erection
and Dismantling services at GSEG’s 351 MW Combined Cycle Power Plant
at Hazira Surat for two years”.
10. BID Closing Dates
10.1. The prospective BIDDER requiring any clarification shall write/ mail to GSEG
on or before the last date of BID Clarification i.e. 5th June, 2026 so as to ensure
submission of BID on or before the Last Date of Submission of BID. No
queries shall be entertained thereafter.
10.2. The prospective BIDDER may send their queries seeking clarification to:
[email protected] with a copy to: [email protected]
10.3. GSEG will notify for clarification/ amendments on
https://gsegtender.nprocure.com. The BIDDERs are advised to check website
10.4. Last date for submission of the Technical BIDs: by 15.00 hrs. of 11th June,
10.5. Date and time of Technical BID Opening: 16.00 hrs of 11th June,
ARC - Scaffolding services Page 12 of
Gujarat State Energy Generation Limited
10.6. Any BID received by GSEG after the deadline for submission of BID
prescribed by GSEG may be rejected. GSEG will not be responsible if BID is
not delivered in time by the Post or Courier or any other reason what so ever.
The responsibility of ensuring on-time submission of their offers lies entirely
with the BIDDERs.
10.7. If there is any change in the dates, it will be notified on
https://gsegtender.nprocure.com website accordingly. The Bidders are advised
to check website for the same.
10.8. The Technical BID may be submitted to the Asst. General Manager
(Commercial) at following address:
Shri Ketan Parekh
Assistant General Manager (Commercial)
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
11. BID Opening and Evaluation
11.1. The authorized representatives of the GSEG will first open envelope
containing Tender Fee and EMD.
11.2. Then the authorized representatives of the GSEG will open envelope
containing Technical BID of those BIDDERs who have submitted Tender Fee
11.3. The BID of any BIDDER who has not complied with the conditions prescribed
herein or conditional BID is liable for rejection.
11.4. Price BID of only the technically qualified BIDDERs shall be considered for
opening and evaluation.
12. Right to Accept Any BID and to Reject Any or All BID
12.1. The right to accept in full or in part/parts the BID will rest with GSEG.
However, GSEG does not bind itself to accept the lowest BID and reserves the
right to reject any or all the BIDs or any part of a BID so received and no
compensation shall be paid for the efforts made by the BIDDER.
ARC - Scaffolding services Page 13 of
Gujarat State Energy Generation Limited
12.2. The right to abandon Bidding process without assigning any reason will rest
with GSEG. No compensation shall be paid for the efforts made by the
12.3. GSEG may reject to BID of the BIDDERs, if it is found that the BIDDER/
Contractor is black listed on previous occasions by the any of the
Departments/Institutions/Local Bodies/Municipalities/Public Sector
Undertakings, etc.
13. Evaluation of BID
The BID shall be evaluated in two stages:
13.1. Stage-I: Review of Tender Fee and EMD (BID Security)
13.1.1. On the date of BID opening as shown on above of this BID, envelope
containing Tender Fee and EMD will be opened.
13.1.2. Those who have submitted Tender Fee and EMD, their Technical BID shall
13.1.3. Technical BIDs which are found deficient on general scrutiny will be treated
as non-responsive and may be rejected.
13.2. Stage-Il: Opening of Price BID
13.2.1. Price BIDs of Technically Qualified BIDDERs shall be opened.
13.2.2. The Price BIDs will be scrutinized for compliance with BID.
13.3. Evaluation methodology
13.3.1. The BIDDER is to submit online, rates for the work item, in Indian Rupees
only, and confirm in the format as mentioned in BID document at Annexure
5. Price BID shall be online only. Based on which the BID will be evaluated.
13.3.2. The BID with overall lowest quoted Online shall be considered as L-1. The
BID second to overall lowest quote shall be considered as L-2 and so on.
13.3.3. In case of tie for L-1 position for qualified bids (technical as well as
financial), L-1 bidder shall be selected through lottery system (either on
nprocure or offline). In that case, Bidder to unconditionally agree for
selection of L-1 Bidder and shall not raise any issue thereafter in this regards.
14. Award of Contract
14.1. GSEG will award the contract to the successful evaluated BIDDER whose BID
has been found to be responsive and who is eligible and qualified to perform
the contract satisfactorily as per the terms and conditions incorporated in the
ARC - Scaffolding services Page 14 of
Gujarat State Energy Generation Limited
14.2. GSEG will communicate the successful BIDDER by a Work Order.
14.3. Failure of the successful BIDDER to comply with the requirements of above
clauses shall constitute sufficient grounds or the annulment of the award and
forfeiture of EMD.
ARC - Scaffolding services Page 15 of
Gujarat State Energy Generation Limited
BIDDER QUALIFICATION
ARC - Scaffolding services Page 16 of
Gujarat State Energy Generation Limited
1. Bidders Qualifying Criteria
1.1. Bidder has paid Tender Fee of Rs. 2,360/- (including GST) in form of demand
draft in favour of “Gujarat State Energy Generation Limited,
Gandhinagar (Gujarat).” Or Online.
Details of Beneficiary:
Name of Beneficiary: GUJARAT STATE ENERGY GENERATION LTD
Name of the Bank: BANK OF BARODA
Name of the Branch: MID CORP BRANCH, AHMEDABAD
Types of Account: CC ACCOUNT
IFSC Code: BARB0MIDAHD
1.2. Bidder has paid EMD of Rs. 17,000/- (Rupees Seventeen Thousand only) in
form of demand draft in favour of “Gujarat State Energy Generation
Limited, Gandhinagar (Gujarat).” Or Online.
Details of Beneficiary:
Name of Beneficiary: GUJARAT STATE ENERGY GENERATION LTD
Name of the Bank: BANK OF BARODA
Name of the Branch: MID CORP BRANCH, AHMEDABAD
Types of Account: CC ACCOUNT
IFSC Code: BARB0MIDAHD
1.3. Bidder must have similar experience of scaffolding work carried out under any
order for maintenance jobs in Power Plant/ Industries in India during last seven
years as follows:
One identical job of amount Rs. 6.8 Lakhs
Two identical jobs of amount Rs. 4.25 Lakhs
Three identical jobs of amount Rs. 3.4 Lakhs
(Experience in GE 9FA Gas Turbine overhauling & other maintenance jobs
and for BHEL make Steam Turbine will be preferable.)
1.4. Bidder must have successfully completed similar nature of job (Minimum
2000 cubic. mtrs total in single order) during last Seven years.
ARC - Scaffolding services Page 17 of
Gujarat State Energy Generation Limited
1.5. Bidder must provide performance certificates from clients where they have
successfully completed similar scaffolding jobs.
1.6. Bidder must have PAN card. Copy of PAN card to be attached.
1.7. Bidder must have GST Number. Copy of GST No. to be attached.
1.8. In last three years, Bidder must have the annual turnover of Rs. 2,55,000/- in
each year. Bidders to submit Certificate of a practicing Chartered Accountant
in this regards as per Annexure –
1.9. Bidder must not be Black listed by any Government Department/Autonomous
bodies / PSU etc. An undertaking that the Bidder has not been blacklisted by
any Government Department/Autonomous bodies / PSU etc. is required to be
submitted by the Bidder.
1.10. Bidder must have a regional office in Gujarat and site office in Surat. Bidder
shall have office/warehouse (scaffolding material storage) in Surat, Gujarat so
that, immediate service can be provided in minimum notice time.
1.11. Bidder should have above stated requirements and the GSEG reserves the right
to request for any additional information and reserves the right to reject the
proposal of any Bidder, if in the opinion of the GSEG, the qualification data is
incomplete or the Bidder is found not qualified to satisfactorily perform the
works. Bidders have to submit the supporting Documents /proofs etc., duly
stamped and self-certified, for all above qualifying criteria.
ARC - Scaffolding services Page 18 of
Gujarat State Energy Generation Limited
Bid Submission forms & check List
(Annexure 1 to Annexure 6)
Following checklist is intended to ensure that all information necessary to evaluate
your proposal has been included. Please indicate Yes / No or Acceptable / Not
Acceptable, whichever is not applicable.
Sr. Name of the Document Submitted Comments, If any
1 All the documents must be stamped and
self certified, in Original and two copies.
2 Proof of Tender Fee & EMD payment,
Demand Draft in Favour of GSEG.
3 Letter of Confirmation with respect to
understanding of the complete scope of
services as envisaged, No Deviation in
the Bid Document (Annexure – 1)
4 Copy of power of Attorney / Authority
to sign the Bid Documents.
5 Details of the Company (Annexure – 2 )
6 Certificate from Practicing Chartered
Accountant for the year wise turnover of
last three years (Annexure 3)
7 The List of similar jobs carried out by
the Bidder in previous years and its
Documentary evidences to substantiate
the same. (Annexure –4)
8 Confirmation of submission of online
Price Bid as per Annexure 5 &
9 Copy of PAN Card
10 Copy of GST No.
11. Check whether Online Price submitted
ARC - Scaffolding services Page 19 of
Gujarat State Energy Generation Limited
(To be submitted on the Bidder‘s Organization Letterhead)
(To be included in the Envelope-2 of Technical Bid)
(Copy of the Power of Authority to sign to be submitted along with this letter)
Assistant General Manager (Commercial)
Gujarat State Energy Generation Limited.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
Subject: Technical Proposal – Submission / Confirmation on Rate Contract for
Scaffolding Supply, Erection and Dismantling services for two years.
authorized person of _________________________, a __________ company,
herewith enclose Technical Proposal for selection of my / our firm / organization
for Rate Contract for Scaffolding Supply, Erection and Dismantling services at
GSEG’s 351 MW Combined Cycle Power Plant at Hazira Surat for two years.
herewith confirm that we have understood the complete Scope & specification of
work as envisaged in the Bid Document. It is also confirm that we have visited the
site and are well acquainted with scope of supply and services along with site and
surrounding condition. For whatsoever reasons, we shall not raise any further
issues for the same in future.
It is also confirmed hereby that no deviation in accordance with the Bid Document
is taken and we shall comply the Bid Document in totality.
The Bid is valid up to 180 days from the last date of Bid submission.
ARC - Scaffolding services Page 20 of
Gujarat State Energy Generation Limited
I/we also confirm that my/our agency has not been blacklisted by any Government
Department or PSU of GOI/GOG as on the date of submission of the Bid.
I/we also confirm that Bankruptcy has not been filed within last 3years and no
insolvency case is pending anywhere in India.
I/We also confirm that my/our company/organisation or its working employees are
not convicted by any court or any other legal authority.
I/We here by agree to abide by and fulfil all the terms and provisions of the Bid
document and contract for work/supply as applicable and in case of default thereof
to forfeit and pay to the Company the sums of money due.
I/We hereby confirm that Price is submitted online on “nProcure” website.
Yours faithfully,
Name of the Bidder ____________________________
ARC - Scaffolding services Page 21 of
Gujarat State Energy Generation Limited
Information and Documentary Evidence of Bidder’s Qualification
1. General Information of the Bidder
1.1 Bidder’s Legal Name
1.2 Bidder’s Legal address in Country of
1.3 Address of Bidders’ Regional Office/
Head Office/ Controlling office in
1.4 Bidder’s Legal status
(Proprietorship / Partnership /
Limited or Incorporated / Limited
Liability Concern / Others)
1.5 Bidder’s Business Status
1.6 Bidder’s Authorized Representative
Telephone / Fax Numbers
1.7 To attach copies of following
i. Copy of the notarized Power of
Attorney, authorizing a person
to sign the Proposal on behalf of
ii. Copy of the PAN Card
iii. Copy of the GST no.
2. Bid Validity (Not less than 180 days from the date of Bid Closing)
Note : Attach all the documents as mentioned above.
ARC - Scaffolding services Page 22 of
Gujarat State Energy Generation Limited
3. Bank Details Information of the Bidder (Copy of Cancelled Cheque to be
3.1 Bidder’s Account in the Bank
3.2 Bidder’s Account Type
3.3 Bidder’s Bank Account Number
3.4 Bidder’s Name & address of Bank
3.5 Bidder’s Bank Branch MICR code
3.6 Bidder’s Bank Branch IFSC code
Name of the Bidder _____________________________
Note : Attach all the documents as mentioned above.
ARC - Scaffolding services Page 23 of
Gujarat State Energy Generation Limited
[On Chartered Accountant’s letter head]
This is to certify that M/s. [Name of the Bidder________________________]
having its office at [Address of the
(Insert PAN no. of the Bidder) is in the business of …….. (Insert briefly the nature
of the business), has recorded the following Turnover and Profit in last three
financial years are as follows:
Year Turnover Rs. Profit Rs.
All figures indicated herein are arrived from the Audit Reports of the Bidders duly
submitted to the Income Tax Department.
[FOR MSME Bidders ONLY] This is to certify that based on financials M/s.
[Name of the Bidder________________________] is valid for MSME under the
Service Category [Service Category].
Round stamp of CA [Name and Registration No. of
Chartered Accountant]
ARC - Scaffolding services Page 24 of
GUJARAT STATE ENERGY GENERATION LTD
Assignments Undertaken/ ongoing During Previous Years
1. Details of Company(ies) /organization for experience of work (Including all ongoing Contracts)
Sr. Name of Address and Type/descripti Date of Amount of Name of the Phone No. Remar
No. the Location where on of the Commencem Job/Work Contact person and e-mail ks
Company/ Work Completed. Job/Work ent of the provided in of the company/ id of the
Organizatio Location Name of Job/Work Rs. Lacs organization to Contact
n the Project whom services person.
for verification.
(Please. attach copy of each contract / agreement. Letter issued by respective organization for work completion may also
ARC - Scaffolding services Page 25 of
GUJARAT STATE ENERGY GENERATION LTD
Confirmation by Bidder for submission of Financial Proposal online
Assistant General Manager (Commercial)
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
Subject: Online Submission of Financial / Price Proposal for Rate Contract for
Scaffolding Supply, Erection and Dismantling services at GSEG’s
MW Combined Cycle Power Plant at Hazira Surat for two years.
authorized person(s) of _________________________, a company, herewith
confirm that we have submitted Financial/Price Proposal, for selection of my / our
firm / organization for Rate Contract for Scaffolding Supply, Erection and
Dismantling services at GSEG’s 351 MW Combined Cycle Power Plant at Hazira
Surat for two years, online on “nProcure” website.
Yours faithfully
Signature ____________________
Designation ____________________
ARC - Scaffolding services Page 26 of
Gujarat State Energy Generation Limited
Format for submission of Financial Proposal, Online Submission
Sr. Height of scaffolding Quantity Unit Rate (Rs./ Total Amount
Sr. Height of scaffolding Quantity Unit Rate (Rs./ Total Amount
No. (Cubic Cubic Metres) (Rs.)
1 Up to 6 meters 5000 To be submitted Calculated
online only online
2 Above 6 meters to 50 meters 3000 To be submitted Calculated
online only online
3 GST (% age) To be
4 Total Amount with GST (Rs.) Calculated
4 Total Amount with GST (Rs.) Calculated
1. The Price quoted above must be inclusive of all scope of work as per the
tender document and including taxes and duties but excluding GST, if any.
2. For applicability of GST shall be based on HSN/SAC Code. GST to be quoted
separately in percentage only.
3. GSEG shall deduct all necessary taxes from source before making the
payment and no further payment / compensation shall be made for such
4. No conditions should be attached to the price proposal.
5. The quoted Price shall be firm and fixed throughout the term of this Order.
There shall not be any increase in price due to change in any applicable taxes
and duties or any other reasons except GST during the term of order.
6. The quantity mentioned is only tentative and not firm. It may vary subject to
the site condition and plant operation. The Engineer can at his discretion may
decide not to execute quantity of item mentioned there in and no payment for
such work shall be paid to the Contractor for his services that are not availed.
Decision of the Engineer shall be final and binding on the consultant in this
ARC - Scaffolding services Page 27 of
Gujarat State Energy Generation Limited
GENERAL TERMS AND
ARC - Scaffolding services Page 28 of
Gujarat State Energy Generation Limited
1.1. As used in this Order, the following terms when capitalized and used shall have
the following meanings:
"Order" means this order along with appendices, as the same may be amended,
supplemented or modified from time to time.
"Contract Schedule" means the schedule set forth in Section 5, hereto, as such
schedule may be adjusted from time to time in accordance with this Order.
company registered and existing under the laws of ________and having its
and its successors and permitted assigns.
"Contractor's Equipment" means all materials, equipment, appliances and
items of whatsoever nature required by Contractor and brought to the site by
Contractor or any of its subcontractors for the obligation of supplies, Services,
works, etc. but not including materials, equipment, appliances or items
intended to form or forming part supply, service or works.
"Owner" means, GUJARAT STATE ENERGY LIMITED (GSEG) a company
registered and existing under, the laws of India and having its Gujarat State
Energy Generation Limited, 2nd Floor, Besides Patni Computers
(iGATE),Shed Nos. A/78/3-8, GIDC Electronic Estate, Sector
Gandhinagar. 382016, India, and its successors and assigns.
“Engineer” means Chief Executive Officer (CEO) of GSEG or any other
person designated by the Owner from time to time.
"Party" means Owner or Contractor, as the case may be.
1.2. Rules of Usage
In the interpretation of this Order, unless the context otherwise requires:
1.2.1. the singular includes the plural and vice versa, and in particular (but without
limiting the generality of the foregoing) any word or expression defined in the
singular has the corresponding meaning used in the plural and vice versa;
ARC - Scaffolding services Page 29 of
Gujarat State Energy Generation Limited
1.2.2. a reference to any gender includes the other genders;
1.2.3. a reference to statutes shall be construed as including all statutory provisions
consolidating, amending, modifying, supplementing or replacing the statute
1.2.4. any reference to a person or entity shall include such person's and such entity's
successors and assigns, and shall include all natural persons, corporations,
companies, limited liability companies, partnerships and other legal entities.
1.3. Order of Priority
In the event of any conflict, variation or inconsistency between the provision
of this Order, as it may be amended modified or supplemented from time to
time and any other provisions of this Order, the most stringent provision in
favor of the Owner shall be applicable.
2. Billing And Payment
2.1. Contract Price
As full consideration to Contractor for the full and complete performance of
the services for the complete scope of work as defined in the tender document,
Owner shall pay for the work as per the schedule of rate as mentioned in the
final work order as accepted by the contractor.
2.2. The foregoing Contract Rate/ Price shall be firm and fixed throughout the term
2.3.1. The Contractor shall maintain an independent estimate & billing section.
2.3.2. Payment will be processed after submission of invoices by Contractor after
certification by technical Department/Engineer for successful completion of
2.3.3. Bills shall be submitted on the basis of work completed against these
approved reports. Payment will be released by the Owner on verification of
work completed against these approved reports. No other method for billing
shall be accepted by the Owner.
2.3.4. The bill shall be raised in computerized format. The bill shall be error free
and accompany all the relevant documents like completion report, receipted
delivery receipts, acceptance by owner etc. The payment of the bill amount
shall be released within 30 working days from the date of receipt of
ARC - Scaffolding services Page 30 of
Gujarat State Energy Generation Limited
undisputed bill duly certified invoices by the Engineer. No interest shall be
paid on delayed payments.
2.3.5. The Contractor shall submit all bills in printed forms and the charges in the
bills shall always be entered at the rates specified in the tender/bid submitted
and contract/work order issued thereafter or in the case of any extra work
ordered in pursuance of these conditions and not mentioned or provided for
in the tender/bid/contract/work order at the rates subsequently accepted by
the Owner for such work. This acceptance of rates shall be obtained by the
Contractor from the Owner’s competent authority in writing before taking up
2.3.6. In case work is nearly suspended, or in case only unimportant progress is
being made, or in case it is apparent that the Contractor is about to forfeit his
Contract or that the money yet due to him will not complete his Contract, the
Owner may, at his discretion, withhold any payment which may be due to the
2.3.7. The Contractor shall not demand, nor be entitled to receive payment for the
work any portion thereof except, in the manner set forth in this Order and
only after the Engineer shall have given a certificate for such payment.
2.4. Extra Items
2.4.1. Any extra items if added to the scope of work shall be approved by Owner
along with the rate and shall also be certified by the Engineer.
2.5.1. Corporate Taxes:
The Contract Price includes all Taxes and duties such as Sales Tax, Work
Contract Tax, Customs and Excise Duty, GST, VAT, Statutory duties &
levies, etc for the entire Contract Period. Any additions, variations or
introduction of new statutory imposition shall be to the account of the
Except GST, Contractor shall bear all income, corporate, property, VAT,
work contract taxes and all other taxes, duties, levies, surcharges, imposts
and similar taxes and duties duly levied or imposed or to be levied on
imposed on Contractor on account of Services rendered by the Contractor
under this Contract or the payments received or to be received by Contractor
ARC - Scaffolding services Page 31 of
Gujarat State Energy Generation Limited
from Company for the Services. GST, if any applicable, shall be separately
charged in the invoice by the Contractor and shall be paid by Company along
with the service fees on receiving declaration confirming payment of such
GST to the Govt. treasury.
In accordance with the provisions of the Income Tax Act, 1961 and its
subsequent amendments, Company shall withhold from the payments to
Contractor such amounts as determined by the prevailing taxation laws in
respect of Contractor’s Services. Company shall deposit these tax
withholdings at source with the Indian revenue authorities and provide
Contractor all appropriate tax receipts and forms evidencing the deposit of
these tax withholdings. Contractor shall be responsible for filing returns of
income to Indian revenue authorities for payments made by the Company
pursuant to this Contract in accordance with the prevailing taxation laws.
2.5.2. Personnel Taxes:
All employment taxes and contributions imposed by any law, regulations or
by trade unions with respect to or measured by the compensation, wages,
salaries or other compensation paid to employees of the Contractor, including
without limitation, taxes and contribution or unemployment compensation
insurance, medical and health insurance, welfare funds, pensions and
annuities and disability insurance. In the event that Contractor fails to do so
and Company is liable to any interest or any penalty arising out of such
personnel taxes, Company shall have the right to recover all such amounts
from Contractor.
3. Mode of Payment
Invoices complete in all respects, raised by the Bidder shall be paid online
through electronic transfer within Thirty (30) Days from the date of receipt of
the same by GSEG Corporate Office.
4. Dispute Resolution
4.1. Informal Dispute Resolution
By mutual agreement between the Managing Directors of both the Parties.
4.2. Arbitration
ARC - Scaffolding services Page 32 of
Gujarat State Energy Generation Limited
In the event the Parties are unable to resolve any dispute in accordance with
this Section, such Dispute shall be referred to and exclusively and finally be
resolved by arbitration in accordance with the Arbitration and Conciliation
Act, 1996 and the rules framed there under.
4.3. The arbitration shall be conducted in Gandhinagar/Ahmedabad.
4.4. The language to be used in the arbitration shall be the English language
exclusively and any award shall be made in the English language only.
4.5. The existence of any such disputed and/or proceedings shall not constitute a
reason for the suspension or stoppage of work under the Contract and the
Contractor shall proceed diligently and in a manner as if no such dispute/
proceedings have been taken place. Simultaneously, no undisputed payments
due or payable by the Owner shall be withheld on account of such proceedings.
5. Miscellaneous
5.1. Additional Scope of Works
If contractor during the course of completion of scope of work as mentioned
in this tender, requires/ recommends the owner for addition in scope of works
related to existing scope; than Owner may accept/ reject the same for
whatsoever reason. If accepted, Owner may issue another work order for
additional/ amendment in scope of works as per the mutual agreed rates and
5.2. Ownership of Documents
Contractor agrees that all documents/ Reports prepared by Consultant/
Contractor used in obligations for Supplies or for the performance of the
Services hereunder (other than any Design Documents or other documents
pertaining exclusively to Contractor's machinery, equipment other proprietary
processes incorporated into the Facilities) shall be the exclusive property of
Owner. Contractor agrees that all such documents, as well as any drawings,
tracings, specifications, calculations, memoranda, data, notes and other
materials that are supplied by Owner and come into the possession of
Contractor, shall be delivered to Owner at the earlier of Acceptance or
termination of the Supplies or Services hereunder.
5.2.1. Use of Reports by Contractor
Contractor shall be entitled to retain and use solely and specifically in
connection with the Supplies or Services hereunder a reproducible set of all
documents delivered to Owner by Contractor.
ARC - Scaffolding services Page 33 of
Gujarat State Energy Generation Limited
5.2.2. Ownership Of Reports
All reports, specification and copies thereof furnished directly by the Owner
are the exclusive property of the Owner. They are not to be used on other
work, and with the exception of the signed contract set, are to be returned to
the Owner on completion of the work.
5.3. Delay not Waiver
It is understood and agreed that any delay, failure or omission by Owner or
Contractor to exercise any right or power arising from any breach or default
by Contractor or Owner in any of the terms, provisions or covenants of this
Order shall not be construed to be a waiver by Owner or Contractor of any
subsequent breach or default of the same or other terms, provisions or
covenants on the part of Contract it or Owner.
5.4. Title to all the Services to be incorporated shall pass to Owner upon receipt of
the amount claimed as progress payments for such portions of the
supplies/Services/works. Said transfer of title shall in no way affect Owner's
rights as set forth in any other provision of this Order. For the purpose of
protecting Owner's interest in all materials, equipment, tools and supplies with
respect to which title has passed to Owner pursuant to this section but which
remain in possession of Contractor or any Subcontractors, Contractor shall take
or cause to be taken an steps necessary under the laws of the appropriate
jurisdiction(s) to protect Owner's title and to protect Owner against claims by
other parties with respect thereto in accordance with the, terms of this Order.
5.5. All notices, reports, documents and other writings and communication
required pursuant to this Order shall be in the English language.
5.6. This Order shall become effective on the date this Order has been
unconditionally accepted by the Contractor.
This being a turnkey contract considering expertise, experience and
resourcefulness of the Contractor, all the services for the comprehensive
Services shall be provided by the Contractor. The rights and liabilities of the
Contractor shall not be assigned or transferred by them.
ARC - Scaffolding services Page 34 of
Gujarat State Energy Generation Limited
7. Governing Law
The Order shall be governed by Law of India. The Gandhinagar / Ahmedabad
courts shall be the exclusive jurisdiction. In case of the arbitration, the place of
Arbitration shall be Gandhinagar/ Ahmedabad.
8. Effective Date
This order will be effective only after receipt of unconditional acceptance of the
9. Term of the Contract/ Order
The contract for said works/ supplies shall be initially for a period of one year
commencing from date of signing of the contract or as mutually agreed; with a
mid-review of your performance at the end of six months. After successful
completion of one year, the contract may be reviewed and extended for a further
period of one year on the same terms and conditions.
10. Work Permit
The Contractor shall work in the plant premises only after taking written work
permit form GSEG or their representatives available at plant site.
ARC - Scaffolding services Page 35 of
Gujarat State Energy Generation Limited
ARC - Scaffolding services Page 36 of
Gujarat State Energy Generation Limited
1. Scope of work
1.1. Erection and dismantling of scaffolding.
1.2. Required material for scaffolding shall be arranged by the contractor. All
Tools & Tackles required for the Job will be in vendor scope
1.3. Only standard material (IS, BS, ANSI standard,) shall be used.
1.4. Bidder has to follow the IS standard for material & services. Indian Standards
1.5. Bidder should complete erection and dismantling of scaffolding work within
3 days (Mobilisation time), if asked to perform & shall have the experience of
working at height of up to 20 meters.
1.6. Provision of safety net wherever required and provision of platforms for
scaffolding being erected for a particular job.
1.7. For installation of safety net temporary hook/ anchor shall be provided by the
contractor. It can be fabricated/ bolted type.
1.8. Base plates shall be installed at the bottom of each pipe during scaffolding.
1.9. For each landing platform, access and egress, Aluminium ladders shall be
provided by the contractor. The ladders are to be provided if the height of
scaffolding is more than 6 meters.
1.10. All scaffolding jobs to be carried out under personal supervision of certified
scaffolding supervisor only.
1.11. Erection and dismantling of scaffolding shall be carried out by certified
scaffolders only.
1.12. Before starting the scaffolding work, Scaffolders are to be medically
examined by site OHC and certified for starting the scaffolding work.
1.13. Required scaffolding job shall be started only after receiving of necessary
1.14. Daily log of scaffolds shall be maintained by the contractor.
1.15. Contractor shall carry out the inspection and fill the checklist (as per
Company’s standard check list F_EHS_69_Scaffolding Checklist attached
in Appendix 1) of scaffolds being used. However, in case if any
modification/change is done, inspection for the same shall be carried out and
the records for the same shall be maintained by the contractor.
1.16. All scaffolds shall be tagged for various stages, e.g., in progress, completed
and ready to use. Intermediate inspections shall be carried out as per the
Company’s standard guidelines.
1.17. All the scaffold material lifting and shifting from one site to another shall be
in Contractor’s scope.
1.18. Contractor must follow GSEG Safety rules and regulation. All PPE’s required
for execution of job shall remain in Contractor’s scope. Contractor must use
PPEs like Safety belt, Safety shoes, safety helmet, fall arrestor, hand gloves,
reflective jacket etc.
ARC - Scaffolding services Page 37 of
Gujarat State Energy Generation Limited
1.19. Contractor must follow GSEG Gate pass procedure for manpower and
1.20. During preparation of scaffolding and dismantling, Contractor must take care
for protecting all equipment, instrument & pipe line, Valves in the vicinity for
any damage due to scaffolding work negligence. If any such damage takes
place due to scaffolding work negligence, Contractor shall either carry out
necessary rectification job at no extra cost or shall bear the cost of such
damage at actuals (decided by GSEG).
1.21. Vendor must provide the barricading around the working area before starting
1.22. Contractor must deploy certified/skilled and fit person for execution &
supervision of scaffolding job. Necessary valid competency certificated for all
supervisors & scaffolders to be submitted to GSEG safety officer at th3 start
of this contract. Scaffolders must have scaffolding erection & dismantling
experience up to 50 meters height.
1.23. Standard 40 mm diameter MS pipes shall be used for scaffolding. The material
to be used for the scaffolding shall be new & free of rust and the integrity of
the material shall be checked by Contractor followed by approval of GSEG
safety officer. The material rejected by them is to be replaced by the
1.24. Scaffolding material like pipe, clamp to be inspected before taking into use.
Any damaged or rusted material shall not be used in scaffolding.
1.25. Scaffolding to be certified by GSEG safety officer before putting into use.
1.26. Contractor has to arrange for required scaffolders & scaffolding material at
specified location with 3 days advance notice.
1.27. The scaffolding shall be installed in any location inside the plant premises of
1.28. Scaffolding materials should be strictly MS pipe (tube) conforming to IS-1161
and couplers (Cup lock /Right Angle couplers/Swivel couplers) conforming
to IS-1570. The Platform for Scaffolding should be provided with toe boards
(150 mm minimum) in order to prevent falling.
1.29. Portable/movable earthing (as per electrical guidelines) shall be provided to
the scaffolding if scaffolding is being erected in the vicinity of live power
supply. This earthing shall be kept connected to scaffolding till the scaffolding
1.30. Contractor shall mobilize scaffolding material and scaffolders, with 3 days
advance notice. However, in case of urgency, Contractor shall be able to
provide scaffolding material and scaffolders as early as possible.
1.31. If required, the contractor must be prepared to carry out work during extended
hours to meet Plant requirements. In such cases, the contractor shall ensure
that additional manpower is mobilized accordingly.
ARC - Scaffolding services Page 38 of
Gujarat State Energy Generation Limited
1.32. After work completion, scaffolding to be removed safely within reasonably
practicable time so as the scaffolding material does not create any obstacle to
Plant operation in the vicinity.
1.33. Contractor shall take care of all housekeeping activity during and after
completion of scaffolding work.
1.34. Concerned department HOD or his representative will certify the scaffolding
for billing purpose.
Requirement of scaffolding for two years will be as under:
Approximately, 8,000 Cubic Meter scaffolding erection & dismantling (with
material) considered.
Sr. No. Volume of scaffolding Height of scaffolding
1 5,000 Cubic Metres Up to 6 meters
2 3,000 Cubic Metres Above 6 meters to 50 meters
ARC - Scaffolding services Page 39 of
Gujarat State Energy Generation Limited
Check List Scaffolding Erection and Dismantling procedure
Area:- F/EHS/156.1/69 Issue-01
Sr. Check Points Yes / Remarks
Erection procedure
1 Decide the load to be taken up per unit area of
scaffold, according to its category decide bay
length as follows
1.1 Distribution load on platform
KN/sq.m.Light duty (max bay length – 2.7 m)
1.2 Distribution load on platform1.50 KN/sq.m
Medium duty(max bay length– 2.4 m)
1.3 Distribution load on platforms 3.00KN/sq.m
Heavy duty(max bay lengths – 1.8 m)
2 Erect scaffolding by competent riggers /
scaffolders under supervision of experienced &
competent supervisor only.
3 Use all scaffolding pipes & accessories after
inspected only.
4 Considering the possible fire hazard and work
interruption, no wooden/ bamboo scaffold will
be permitted at GSEG site.
5 Display scaffolding status board at prominent
location all the time.
6 The height of scaffold should not be more than
four times of its minimum base dimension
unless guy ropes, ties or braces are used.
7 Scaffold having more than 10 m height shall be
secured with fixed structure for stability at first
& than at every 8 m.
8 Provide landing platforms with standard hand
railing at every 9 mtr. of height.
ARC - Scaffolding services Page 40 of
Gujarat State Energy Generation Limited
9 Provide base plate :size: 6x6 inches, thickness:
6 mm at bottom most of each scaffolding pipe.
10 The footing of scaffold shall be placed on
leveled & sound ground(with use of base
plates) capable enough of carrying max.
Intended load without settling or displacement.
11 Don’t use concrete blocks, barrels, boxes, loose
bricks etc. for support of scaffolds
13 Provide guard rail (1200 mm), mid rail (600
mm) & toe guard (100 mm).on all open sides
and end of the platform above 2 m height.
13 Scaffold shall be braced at all four sides
14 Safe & convenient means of access to be
provided: portable ladder, fixed ladder, ramp or
runway. It is the duty of supervisor to provide
safe access and safe work location through the
use of permanent platforms, temporary
platforms and lifelines
15 No worker should be expected to expose
himself to an unprotected fall while getting to
the work location or while
16 Always keep more than 3 mtr. distance from
overhead high tension line. Use portable
earthing for scaffolding.
17 Take care of wind velocity & wind direction.
18 Scaffold should be vertical & checked with
plumb. So that bracing will fit without forcing.
19 Platform shall be made of min. 2 gratings (at
least 46 cm) fastened securely. & grating shall
not extend above 6” from the end.
20 Ladder shall be installed immediately after
completion of second horizontal plane or 6 mtr.
21 Ladder shall extend at least 3 rungs from the
22 Scaffolding shall be erected with a factor of
safety not less than
23 Use of full body harness with double lanyard
with scaffolding hook by all riggers after
completing first horizontal plane
ARC - Scaffolding services Page 41 of
Gujarat State Energy Generation Limited
24 Vertical member shall be connected with
horizontal member by using fix clamp (right
25 Only bracing can be connected with vertical
member by using swivel clamp at ground end.
Other end of bracing shall also be connected
with horizontal member by using fix clamp so
far as possible
26 The completed scaffolding must be certified by
scaffolding supervisor and site engineer
Dismantling procedure
27 Scaffolding to be dismantled by the scaffolders
in presence of competent / experienced
28 Display scaffolding status board at prominent
location all the time.
29 Scaffolding removal shall be from top to
bottom plane wise.
30 First remove bracing and than remove all
horizontal members in one plane
31 After reaching to second last horizontal plane,
first install bracing of 3 m for ground level
plane & then only remove the horizontal
members at second level.
32 Loose scaffolding member shall be lowered
down by rope & not by using man chain or
33 The area of dismantling should be barricaded &
no movement of personnel underneath the
34 Loose member shall be segregated and stacked
35 Removal of ladder may be done after reaching
to the second horizontal plane from ground
36 While erection or dismantling of scaffold the
spanner shall be used with proper string in hand
so that it will not fell down.
ARC - Scaffolding services Page 42 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2026 05 19 Tender for Scaffolding.pdf
2026 05 19 Tender for Scaffolding.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].