Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹3.3 LAccepted-AOC PULININNA KALLAMPOTTA BUNGLOW PARANIYAM ARUMANOOR POOVAR P O | Ist | Accepted-AOC Ist Rank | |
| 2 | Rejected-Technical PARAVAN VILA VEEDU MELAMMAKAM MARIYAPURAM | - | Rejected-Technical IInd accept | |
| 3 | Rejected-Technical | - | Rejected-Technical 6th accept | |
| 4 | Rejected-Technical | - | Rejected-Technical 5th accept | |
| 5 | Rejected-Technical | - | Rejected-Technical 3rd accept |
| Sl No | Description | Qty | Unit | RAVIDAS M L4 | AJEESH KUMAR AR L2 | RAJEESH M R L3 | GIREESH R L6 | R Thankamony L5 | PRAKASH N V L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00construction of side wall | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 36.18 | cum | 308.52 ₹11,162.25 | 290.5 ₹10,510.29 | 306.31 ₹11,082.3 | 332 ₹12,011.76 | 319.92 ₹11,574.71 | 288.29 ₹10,430.33 Lowest |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 8.1 | cum | 7,173.82 ₹58,107.94 | 6,754.85 ₹54,714.29 | 7,122.52 ₹57,692.41 | 7,729 ₹62,604.9 | 7,438.88 ₹60,254.93 | 6,703.54 ₹54,298.67 Lowest |
| 1.00 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 73.48 | sqm | 864.98 ₹63,558.73 | 814.46 ₹59,846.52 | 858.79 ₹63,103.89 | 931 ₹68,409.88 | 896.94 ₹65,907.15 | 808.27 ₹59,391.68 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 398.52 | kilogram | 96.42 ₹38,425.3 | 90.79 ₹36,181.63 | 95.73 ₹38,150.32 | 103 ₹41,047.56 | 99.98 ₹39,844.03 | 90.1 ₹35,906.65 Lowest |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 22.14 | cum | 7,772.55 ₹1,72,084.26 | 7,318.61 ₹1,62,034.03 | 7,716.96 ₹1,70,853.49 | 8,374 ₹1,85,400.36 | 8,059.73 ₹1,78,442.42 | 7,263.02 ₹1,60,803.26 Lowest |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 40.5 | sqm | 294.85 ₹11,941.43 | 277.63 ₹11,244.02 | 292.74 ₹11,855.97 | 317 ₹12,838.5 | 305.74 ₹12,382.47 | 275.52 ₹11,158.56 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,586
Closing Date
18 Oct 2025, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer NIP Channel Sub Division Neyyattinkara.
DEPOSIT NIP Kulathoor GP Construction of Retaining wall near ch 21565m on the right side of Kollamcode branch canal at Muzhanguvila in Uchakada ward General Civil Work
2025_Irrig_810150_1
IRR/IA/EST/4047/2025_5_1_1
Open Tender
Civil Works - Canal
Item Wise
Neyyattinkara
Please refer Tender documents.
2 documents required · 2 mandatory
₹935
Yes
₹10,586
Yes
12 Nov 2025
15 Oct 2025
21 Oct 2025
15 Oct 2025
18 Oct 2025
15 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BID.pdf
Tender Documents • 2.20 MB
BOQ_1351957.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .