Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L5₹39.6 L+₹6.0 L (17.8%)Accepted-AOC WZ 1391 31 B NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L5 | Accepted-AOC The lowest bonafide bid | |
| 2 | L1₹33.6 LRejected-Finance 262 1 NEAR MANAV CHOWK NEW GRAIN MARKET AMBALA CITY HARYANA HARYANA 134003 | AMBALA | HARYANA | 134003 | L1 | Rejected-Finance Non bonafide bid. Quoted on lower side than minimum fair wages. | |
| 3 | L2₹33.8 L+₹22,994.40 (0.68%)Rejected-Finance | L2 | Rejected-Finance Non bonafide bid. Quoted on lower side than minimum fair wages. | |
| 4 | L3₹39.1 L+₹5.5 L (16.3%)Rejected-Finance | L3 | Rejected-Finance Non bonafide bid. Quoted on lower side than minimum fair wages. | |
| 5 | L4₹39.6 L+₹6.0 L (17.8%)Rejected-Finance | L4 | Rejected-Finance Non bonafide bid. Quoted on lower side than minimum fair wages. |
Tender Value
₹47.5 L
EMD Value
₹95,000
Closing Date
1 Oct 2020, 6:00 pmClosed
GE I R AND D Chandigarh
Plot No 02 Sector 37A Chandigarh
OUTSOURCING SERVICES FOR OPERATION OF WATER SUPPLY INSTALLATIONS AT TBRL RANGE RAMGARH
2020_MES_369385_1
GE I R AND D/CHD-41/2020-21
Open Tender
Civil Works
Item Rate
330 days
Ramgarh
As per tender documents
9 documents required · 9 mandatory
₹500
GE I R AND D Chandigarh
₹95,000
Yes
23 Nov 2020
2 Sept 2020
3 Oct 2020
2 Sept 2020
1 Oct 2020
24 Sept 2020
Amount
Providing outsourcing services for manning and operation of Submersible Pump Sets any capacity / Centrifugal Pump Sets any capacity/DG Set any capacity / Liquid chlorinator / Bleaching dozer/ Electrical control panel and sluice valves of various sizes installed at following installations :- (a) Pump House No 6 & 7 and firefighting Pump house at ETF Complex including booster pump house at SWS, AAG Zone & ETF Zone by deploying minimum one operator (FGM) per shift of 8 hours for THREE CONTINUOUS SHIFTS (1st Shift from 0900 hours to 1700 hours and 2nd Shift from 1700 hrs to 0100 hrs and third Shift 0100 hrs to 0900 hrs) INCLUDING SUNDAYS AND HOLIDAYS. Rates quoted below for various sub items shall deem to include for providing services as mentioned here-in-under:- Basic Labour Wages Rate for 01 (ONE) independent Operator (FGM) in one shift
EPF for 01 (ONE) independent Operator (FGM) in one shift
ESIC for 01 (ONE) independent Operator (FGM) in one shift
Bonus for 01 (ONE) independent Operator (FGM) in one shift
Overheads and profit for 01 (ONE) independent Operator (FGM) in one shift
Labour Welfare Cess (LWC) for 01 (ONE) independent Operator (FGM) in one shift
Providing outsourcing services for manning and operation of Submersible Pump Sets any capacity / Centrifugal Pump Sets any capacity/DG Set any capacity / Liquid chlorinator / Bleaching dozer/ Electrical control panel and sluice valves of various sizes installed at following installations :- (a) Tubewell No. 9 (nearby Zone-II) & Pump House No 3 and DG Set 30 KVA by deploying minimum one operator (FGM) per shift of 8 hours for ONE SHIFT (from 0900 hours to 1700 hours) INCLUDING SUNDAYS AND HOLIDAYS. Rates quoted below for various sub items shall deem to include for providing services as mentioned here-in-under:- Basic Labour Wages Rate for 01 (ONE) independent Operator (FGM) in one shift
EPF for 01 (ONE) independent Operator (FGM) in one shift
ESIC for 01 (ONE) independent Operator (FGM) in one shift
Bonus for 01 (ONE) independent Operator (FGM) in one shift
Overheads and profit for 01 (ONE) independent Operator (FGM) in one shift
Labour Welfare Cess (LWC) for 01 (ONE) independent Operator (FGM) in one shift
Providing outsourcing services for manning and operation of Submersible Pump Sets any capacity / Centrifugal Pump Sets any capacity/DG Set any capacity / Liquid chlorinator / Bleaching dozer/ Electrical control panel and sluice valves of various sizes installed at following installations :- (a) Pump House No 5 (nearby Zone-I) and DG Set 63 KVA by deploying minimum one operator (FGM) per shift of 8 hours for TWO CONTINUOUS SHIFTS (1st Shift from 0900 hours to 1700 hours and 2nd Shift from 1700 hrs to 0100 hrs) INCLUDING SUNDAYS AND HOLIDAYS. Rates quoted below for various sub items shall deem to include for providing services as mentioned here-in-under:- Basic Labour Wages Rate for 01 (ONE) independent Operator (FGM) in one shift
EPF for 01 (ONE) independent Operator (FGM) in one shift
ESIC for 01 (ONE) independent Operator (FGM) in one shift
Bonus for 01 (ONE) independent Operator (FGM) in one shift
Overheads and profit for 01 (ONE) independent Operator (FGM) in one shift
Labour Welfare Cess (LWC) for 01 (ONE) independent Operator (FGM) in one shift
Providing outsourcing services for manning and operation of Submersible Pump Sets any capacity / Centrifugal Pump Sets any capacity/DG Set any capacity / Liquid chlorinator / Bleaching dozer/ Electrical control panel and sluice valves of various sizes installed at following installations :- (a) Tubewell No 4 (nearby zone-VIII (RTRS) by deploying minimum one operator (FGM) per shift of 8 hours for TWO CONTINUOUS SHIFTS (1st Shift from 0900 hours to 1700 hours and 2nd Shift from 1700 hrs to 0100 hrs) INCLUDING SUNDAYS AND HOLIDAYS. Rates quoted below for various sub items shall deem to include for providing services as mentioned here-in-under:- Basic Labour Wages Rate for 01 (ONE) independent Operator (FGM) in one shift
EPF for 01 (ONE) independent Operator (FGM) in one shift
ESIC for 01 (ONE) independent Operator (FGM) in one shift
Bonus for 01 (ONE) independent Operator (FGM) in one shift
Overheads and profit for 01 (ONE) independent Operator (FGM) in one shift
Labour Welfare Cess (LWC) for 01 (ONE) independent Operator (FGM) in one shift
Providing outsourcing services for manning and operation of Submersible Pump Sets any capacity / Centrifugal Pump Sets any capacity/DG Set any capacity / Liquid chlorinator / Bleaching dozer/ Electrical control panel and sluice valves of various sizes installed at following installations :- (a) Tubewell No 8 (Zone-IV) by deploying minimum one operator (FGM) per shift of 8 hours for ONE SHIFT (from 0900 hours to 1700 hours) INCLUDING SUNDAYS AND HOLIDAYS. Rates quoted below for various sub items shall deem to include for providing services as mentioned here-in-under:- Basic Labour Wages Ratefor 01 (ONE) independent Operator (FGM) in one shift
EPF for 01 (ONE) independent Operator (FGM) in one shift
ESIC for 01 (ONE) independent Operator (FGM) in one shift
Bonus for 01 (ONE) independent Operator (FGM) in one shift
Overheads and profit for 01 (ONE) independent Operator (FGM) in one shift
Labour Welfare Cess (LWC) for 01 (ONE) independent Operator (FGM) in one shift
Providing outsourcing services for manning and operation of Submersible Pump Sets any capacity / Centrifugal Pump Sets any capacity/DG Set any capacity / Liquid chlorinator / Bleaching dozer/ Electrical control panel and sluice valves of various sizes installed at following installations :- (a) Pump House No 10 (nearby Zone-VIII (RTRS) by deploying minimum one operator (FGM) per shift of 8 hours for THREE CONTINUOUS SHIFTS (1st Shift from 0900 hours to 1700 hours and 2nd Shift from 1700 hrs to 0100 hrs and third Shift 0100 hrs to 0900 hrs) INCLUDING SUNDAYS AND HOLIDAYS. Rates quoted below for various sub items shall deem to include for providing services as mentioned here-in-under:- Basic Labour Wages Rate for 01 (ONE) independent Operator (FGM) in one shift
EPF for 01 (ONE) independent Operator (FGM) in one shift
ESIC for 01 (ONE) independent Operator (FGM) in one shift
Bonus for 01 (ONE) independent Operator (FGM) in one shift
Overheads and profit for 01 (ONE) independent Operator (FGM) in one shift
Labour Welfare Cess (LWC)for 01 (ONE) independent Operator (FGM) in one shift
Providing outsourcing services for manning and operation of Submersible Pump Sets any capacity / Centrifugal Pump Sets any capacity/DG Set any capacity / Liquid chlorinator / Bleaching dozer/ Electrical control panel and sluice valves of various sizes installed at following installations :- (a) Tubewell No 11 (nearby Ballistic Vidyalaya) and Tubewell No. 12 (Sports Complex) by deploying minimum one operator (FGM) per shift of 8 hours for ONE SHIFT (Shift from 0900 hours to 1700 hours) INCLUDING SUNDAYS AND HOLIDAYS. Rates quoted below for various sub items shall deem to include for providing services as mentioned here-in-under:- Basic Labour Wages Rate for 01 (ONE) independent Operator (FGM) in one shift
EPF for 01 (ONE) independent Operator (FGM) in one shift
ESIC for 01 (ONE) independent Operator (FGM) in one shift
Bonus for 01 (ONE) independent Operator (FGM) in one shift
Overheads and profit for 01 (ONE) independent Operator (FGM) in one shift
Labour Welfare Cess (LWC)for 01 (ONE) independent Operator (FGM) in one shift Notes for Sr Item No 1.00 to 7.50 (i) The items of BOQ have been divided into items/ sub items to cater various elements like basic labour wages, EPF, ESIC, Bonus, LWC and contractor overheads and profits. The contractor is liable to quote separate rates for all such items/ sub items in the BOQ. The quoted rates of all such items shall be inclusive of all taxes, cess, and levies as applicable including GST. (ii) It will be the sole responsibility of the contractor to ascertain the relevant rates of minimum labour wages and various elements as per latest prevailing Govt Notifications and applicable rate of taxes etc on the bid submission end date. (iii) The quoted rate against any of the items/sub items catered in the BOQ corresponds to/works out to lower than the corresponding prevailing minimum rates of wages/subscriptions/contribution towards EPF, ESIC, Bonus and LWC as per Govt Notifications shall be treated as NON-BONAFIDE and such bid shall not be considered for acceptance. (iv) The amount of contribution towards Bonus, EPF and ESIC as quoted in items/Sub Items of BOQ shall be payable only after submission of VALID and AUTHENTIC document in support of having paid the requisite amount to the workmen. (v) The rate quoted for items/sub items in the BOQ shall not be less than minimum wages as notified by Govt of India/concerned Sate Govt/ Local Body whichever is higher and not less than applicable rates for contribution of employer towards EPF, contribution to ESIC, contribution of Bonus and LWC under respective headings/sub items. In case the rates quoted are less than the prevailing rates/instructions under any heading(s), the bid will not be considered for acceptance. In such case, the lowest bidder shall be determined from amongst the valid/bonafide bids only. (vi) Quotation with ‘NIL’ or ‘Zero’ consideration (overhead and profit) shall be considered non bonafide. (vii) The quoted rates of the items/sub items of the BOQ shall deem to include the consumable items mentioned in Note No 20.12 of 'Schedule 'A' Notes, except Diesel Oil which shall be issued under Schedule 'B' free for use. (viii) An operator shall be ITI qualified in relevant trade with 03 (Three) years practical experience as Operator (FGM)/or Matriculation passed with 07(Seven) years practical experience as Operator (FGM) and shall have adequate knowledge for operation of Pump and maintaining records of day to day. (ix) Diesel oil required for operating of DG Set shall be issued by Department free of cost under Schedule 'B'. It will be responsibility of the contractor to collect the Diesel on his own arrangement from store yard of AGE E/M R&D Ramgarh for filling to DG sets. (x) Daily log sheets, cotton waste, uniform with shoes for operators, first aid box at each installation shall be arranged by the contractor without any extra cost of the department. (xi) In case any laxity is noticed by the G.E. on the part of the contractor not running the plant efficiently/any installation is found unattended or the operator goes absent, then the G.E. may at his discretion impose penalty on the contractor to pay the department @ Rs 600/- per shift for the period the plant has not run efficiently due to negligency of the contractor as a compensation and deducted from the payment due to him. (xii) Operator shall also be responsible for keeping the installation premises as well as area nearby neat & clean. (xiii) Weekly off shall be provided to the operators by the contractor and unit rate quoted shall deemed to include the cost of the same.
M/S J N TRADERS
Choice india
RUHI ASSOCIATES
G M CONSTRUCTION COMPANY
Baliyan Electrical Works
Bal Singh and Sons
M/S BALWINDER SINGH
BRIJ MOHAN LAL AND CO.
P.K.MALL ENTERIPRSES
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .