Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10.5 L
EMD Value
₹10,474
Closing Date
5 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Technical Expert
CONSTRUCTING A FIELD OUTLET -19 Nos & NALA PLUG-05 Nos AT VILLAGE :KAVLI TALUKA :JAMBUSAR, DISTRICT :BHARUCH
265393
2025-26
Open
Civil - All
Works
Bharuch
1 document required · 1 mandatory
₹900
Yes
P D DWDU BHARUCH 18 SILUDI
₹10,474
Yes
16 Jan 2026
16 Jan 2026
16 Jan 2026
5 Feb 2026
16 Jan 2026
Name of Work:-CONSTRUCTING A FIELD OUTLET -19 Nos
& NALA PLUG-05 Nos
AT VILLAGE :KAVLI TALUKA :JAMBUSAR
DISTRICT :BHARUCH.
ESTIMATED AMOUNT PUT TO TENDER: - RS.1047400/-
TA.JAMBUSARD.BHARUCH
WDC2.0 KAVI PROJECT
Phone No 7567898555,
PIA:- DISTRICT WATERSHED DEVELOPMENT UNIT-BHARUCH
Notice Inviting On-Line Tender
Department Name :- “District Watershed Development Unit-Bharuch”
Behind Old Mamlatdar Kacheri, Kanbiwaga, Bharuch-392001
Name of Project :- PMKSY WDC 2.0 KAVI Project
Name of work :- Constructinga A Field outlet -19 nos & Nala plug-05nos
@ Village Kavli Ta-Jambusar D-Bharuch
Estimated Contract Value :- Rs.1047400/-
Period of Completion :- 4 Months
Approved Govt. Registered :- “E1”& Above,
Bid Call(Nos.) :-
Tender Currency :- Indian Rupee(INR)
Bid Document fee By DD :- Rs.900/-
Bid document fee Payable :- “P D DWDU BHARUCH 18 SILUDI”
Bid Security/EMD(INR) :- Rs.10474/-
Bid Security/EMD(INR) in :- “P D DWDU BHARUCH 18 SILUDI”
Bid document :- 16/01/2026 12.00 AM
Downloading start Date
Bid document :- 05/02/202618.00 PM
Downloading End Date
Last Date & Time for :- 06/02/202618.00 PM
Receipt (Submission) of
Bid validity period :- 45 days after opening of price bid
Submission of certain :- Submission of Tender Fee and EMD in original during office
documents etc. hours within 7 (Seven) days from the last date of Opening in
in person in the office of the the office the“Technical Expert” DWDU Bharuch-The
“Technical Expert ” exemption certificates of EMD will not beconsidered. The EMD
District watershed is to be paid as per provisions of tender document i.e.
development Rs.50,000/-as DD or FDR & Balance Amount As Bank
unit,bharuch Guarantee (The amount of Earnest Money Deposit with the
C/o “District Rural validity period of not less than 6 months).Submission of
Development Agency” Tender Fee, EMD & Other Required Documents / Pre
Behind Old Mamlatdar Qualifications Documents shall be submitted online
Kacheri, Kanbiwaga, (documents shall have to be scanned & put up online).
The original documents shall have to be submitted last date of
submission of tender throughR.P.A.D.only. The physical
submission of Tender Fee & EMD is not received in time as
shown inbid documents, he will be banned for submitting
tenders of “Technical Expert” PMKSY DWDU Bharuch in future
and recommend the appropriated authority to cancel his
registration and cancelling tendering code.The documents
related to Pre-Qualificationand Other Required Documents
shall be submitted online on www.nprocure.com” for
evaluation as per R & B DepartmentGuidelines. Hard copies of
documents in this regards shall not be accepted by Technical
Expert” PMKSY DWDU Bharuch, Any document, required as
per the PQ Criteria, not uploaded online shall be considered
as“Document Not Submitted” and evaluation shall be carried
out accordingly, the document shall not be asked from the
bidder subsequently, please note.showninbid documents, he
will be banned forsubmitting tenders of “Technical Expert”
PMKSY DWDU Bharuch “ in future andrecommend the
appropriated authority tocancel his registration and
cancellingtendering code.The documents related to Pre-
Qualificationand Other Required Documents shall besubmitted
online on www.nprocure.com” forevaluation as per R & B
DepartmentGuidelines. Hard copies of documents in
thisregards shall not be accepted by Technical Expert” DWDU
Bharuch, Anydocument, required as per the PQ Criteria,
notuploaded online shall be considered as“Document Not
Submitted” and evaluationshall be carried out accordingly, the
documentshall not be asked from the biddersubsequently,
Remarks :- Tenderer shall submit their offer in electronicformat on
website, after digitally signing thesame. Offers which are not
digitally signedwill not be accepted. No offer in physical
form will be accepted and any such offer ifreceived by
Technical Expert” DWDU Bharuchwill be outrightrejected.
Bid Opening Date :- 06/02/2026 from 12.00 PM Onwards.
In the office of the “Technical Expert ” District watershed
development unit,BharuchC/o “District Rural
Development Agency”Behind Old Mamlatdar Kacheri,
Kanbiwaga, Bharuch-392001
Officer Inviting Bids :- “Technical Expert ”, District watershed development
Bid Opening Authority :- Technical Expert ”, District watershed development
Address :- “Technical Expert ”, District watershed development
unit,BharuchC/o “District Rural Development Agency”
Behind Old Mamlatdar Kacheri, Kanbiwaga, Bharuch-
Contact Details :- Phone :-
E-Mail :- [email protected]
General Terms and Conditions
(1) Bidders can download the tender document free of cost from the website.
(2) Bidders have to submit Technical bid as well as Price bid in Electronic format only on
nprocure website till the Last Date & time for submission.
(3) Offers in physical form will not be accepted in any case.
(4) Free vendor training camp will be organized every Saturday between 4.00 to 5.00 P.M. at
(n)code solutions-A Division of GNFC Ltd., Bidders are requested to take benefit of the same.
Bidders who wish to participate in online tenders will have to procure / should have legally valid
Digital Certificate as per Information Technology Act-2000 (Class-III) using which they can sign
their electronic bids. Bidders can procure the same from any of the license certifying Authority of
India or can contract (n)code solutions- A division of GNFC Ltd, who are licensed Certifying
Authority by Govt. of India.
In case bidders need any clarifications or if training required to participate in online
tenders, they can contact (n)Procure Support team:-
(n)code Solutions-A division of GNFC Ltd.,
(n)Procure Cell
403, GNFC Infotower, S.G. Road,
Bodakdev, Ahmedabad – 380054 (Gujarat)
Contact Details
Reliance : +91-79-30181689
E-mail : [email protected]
Other Terms & Conditions as per detailed tender documents
Name of Work:-Constructinga A Field outlet-19 &Nala Plug -05nos@ Village KavliTa-JambusarD-
Important Details
Details of Committee
PMKSY WDC 2.0 KAVI PROJECT have been Sanctioned under Integrated Watershed
Management Programme (Guideline–2021) and running under District Watershed Development
unit, Bharuch. InKavliVillage, Village Level committee has formed for implementation of this
project.This is called “Watershed committee -Kavli”.
Details of Reference:-
Gujarat State Watershed Management Agency, Gandhinagar has instructed For implementation of
various Watershed Development work in Kavli Villageof PMKSY WDC 2.0 KAVI PROJECT,
InvitingOnline Tender documents from Government registered/Approved contractor as prescribe
terms and Conditions given in Tender document.
Mode of sending the tender:-
To view-Tender Notice, Detailed Time Schedule, Tender Document for this Tender and subsequently
purchase the Tender Document and its supporting documents, kindly visit following e-Tendering
website of www.nprocure.com The offer should be submitted online in the prescribed form as per
TWO ENVELOPE SYSTEM ONLY. Both the Bids (Technical as well as Commercial) shall have to be
submitted onlineand documents for Technical bid will also send by RPAD/Speed post only. Bids not
submitted online will not be entertained. The offers of the Bidders qualifying technically are only
eligible for opening of envelope no.2.Commercial bid (Envelope No.2) will be opened in the presence
of bidder or their authorized representative present at a date which will be notified as above.
Details of security Deposit:-
After opening of Commercial bid, qualifiedBidder whoseover all rates are lowest will submit the
security deposit within 7 days or the instruction given by the “Technical Expert ” District
watershed development unit,Bharuch(It is 5 % of estimated cost and it is deposited in the form of
FDR (Nationalized Bank)pledged infavourof“P D DWDU BHARUCH 18 SILUDI“.
Detail of Necessary Documentsrequired for cover “A”:-
(1) Government Registration Certificate of Approved Contractor
(2) Valid Recent Bank Solvency Certificate.( Current year-2025)
(4) Demand Draft of E.M.D./Tender fee (Nationalized Bank only)
(5) GST Number.
(6) The work to be completed by 45 days after opening of price bid. should be verified at the
place of each work. Also the place of the competent authority has been verified. The certificate
of which will have to be uploaded compulsorily. The tender without site verification will be
1. p5ZMST N:TFJ[HDF\ SM>VW]ZFX H6FX[ TM T[ .HFZNFZzLG]\ 8[g0ZOMD" ZN U6JFDF\ VFJX[P
2. SFDULZLDF\ :Y/l:YlT VG];FZO[ZOFZ YJFGL XSITF CMI tIF\4 CJF,FGF .HG[ZzLGLT[DH H/:+FJ lJSF;
;lDlTGF 5|D]BzLGL ;]RGFD]HA SFDULZL SZJFGL ZC[X[P
3. V[S SZTF JW] SFDMGF\ S[;DF\ NZ[S SFD ;FY[ RF,] YFI T[J] VFIMHG .HFZNFZzLV[ UM9JJFG]\ ZC[X[P VF
VFIMHG S[ UM9J6L DF8[ .HFZNFZzLG[ SM. DMAL,F.h[XG RFH" R]SJJFDF\ VFJX[ GCLP SM. 56 ;\HMUMDF\
V[J] H6FX[ S[ .HFZNFZzL\\ SFDGF EFZ6G[ 5\CMRL XS[ T[D GYLP VF 5|;\U[ ;lDlT £FZF SMg8=FS8ZGL XZTMG]\
5F,G G YJF AN, T[DG]\ SFD ZN SZX[ VG[ 0L5MhL8 ZN SZFX[P VF SFD VgIG[ ;M\5TF H[ JWFZFGM BR" YFI T[
SMg8=FS8Z 5F;[YL J;], SZJFGM ZC[X[P
4. XZTL 8[g0Z :JLSFZJFDF\ VFJX[ GCLP
5. SFDULZLDF\ V0R6~5 hF0L N]Z SZJL T[DH VFJFvHJFGF\ Z:TM AGFJJFGL HJFANFZL .HFZNFZzLGLZC[XP[
6. SFD X~ SIF" 5C[,F4 RF,] SFDULZL NZdIFG T[DH 5}6" YI[, SFDGL V[S H V[\U,YL OM8MU|FOL SZJFGL ZC[X[P
OM8MU|FOLGL +6 GS, SZJFGL ZC[X[4 H[DF\ A[ GS, ;lDlTG[ VF5JFGL ZC[X[ VG[ V[S GS, lA, ;FY[ ZH]
SZJFGL ZC[X[P H[DF\ JBTM JBTGL OM8MU|FOL .HFZNFZzLV[ T[DGF BR"[ SZJFGL ZC[X[P
7. >HG[Z .gRFH"GL ;]RGF 5|DF6[ SFD SZFJJFGF HyYFG[wIFG[ ,. ;DI DIF"NF 5|DF6[ ;Z[ZFX H~ZLIFT D]HA
5|lTlNG SFD SZJFG]\ZC[XV
[ G[T[ DF8[GF H~ZL ;FWGF[ ,FJJFGL ZC[X[P
8. JCLJ8L4 S]NZTL4 VgI SFZ6M;Z SFDULZL VF5L G XSFI VYJF SFD G Y. XS[T[JF T[JF ;\HMUMDF\ SM.
lS:;FDF\ DXLGZL4 ;FWGM4 DH]ZM JU[Z[ VF.0, ZC[TF[T[JF lS:;FDF\ 56 SM. VF.0, RFH" R]SJJFDF\ VFJX[
9. SFDULZL 1FlTI]ST DF,]D 50[ VG[HyYFS[ U]6JTFDF\ p65 VFJ[T[JF VYJF VgI SM.56 ;\HMUMDF\ SFDULZLGF
VFN[X ZN SZJFGL ;TF H/:+FJ lJSF; ;lDlTGLZC[XP[
10. SFDULZL NZdIFG BMNF6 T[DH Z:TF AGFJJF AFAT[ SM.56 HFTGF HFGDF,G[ S[B[TZGF 5FSG[G]SXFGYX[T[GL
HJFANFZL .HFZNFZGL U6FX[P H[ DF8[ SM.56 5|SFZG]\ G]SXFG q J/TZ H/:+FJ lJSF; ;lDlT £FZF R]SJFX[
11. .HFZNFZzLV[ NZ[S 5|SFZGL DXLGZL DF8[ JLDM JU[Z[SZFJL ,[JFGF\ ZC[XP[ T[ H ZLT[VS:DFTGF\ ;\HMUMDF\
;\5]6" HJFANFZL .HFZNFZzLGLZC[X[P
12. ;F.8 5Z SFD SZTF 0=F.JZ4 S,LGZ4 :SL, VG[ VG:SL<0 ZMHDNFZ DH]ZM4 RMSLNFZGF CFHZL 5+SP
JLDFVM VG[ ,F.;g; JU[Z[ ;ZSFZzLGF 5|JT"DFG lGIDFG];FZ .HFZNFZzLV[ ,[JFGF ZC[X[P
13. EZ[,F EFJM TDFD 8[1F ;lCTGFZC[X[P
14. SFDULZLG]\ VFBZL AL, SFD ;\TMQFSFZS 5}6" YI[R]SJJFDF\ VFJX[P SFDULZL DF8[ SM.56 5|SFZG]\V[0JFg;
15. H[ .HFZNFZzLG]\ 8[g0Z D\H]Z YFI T[VMV[ H SFD SZJFG]\ ZC[X[P .HFZNFZzL SM.56 ;\HMUMDF\ 5[8F SMg8=FS8Z
G[ SFD VF5L XSX[ GCLP HM 5[8F SMg8=FS8 VF5JFDF\ VFJX[ TM T[G]\ D\H]Z YI[, 8[g0Z ZN SZJFDF\ VFJX[P SFDGF
:Y/ 5Z .HFZNFZzLV[ 5MT[ VYJF 5MTFGF VlWS'T SZ[, 5|lTlGWL s>HG[Zf CFHZ ZCL XSX[P
16. RF,] SFD NZdIFG SM.56 5|SFZGM VS:DFTYX[4TM T[GL ;\5}6" HJFANFZL .HFZNFZzLGLZC[XP[
17. ;ZSFZzL TZOYL VG]NFG p5,aWYI[YL SFDG]\ R}SJ6]\ SZJFDF\ VFJX[P VG]NFGGL DIF"NFDF\ H R]SJ6]\ SZJFDF\
VFJX[VG[VG]NFG DM0]\ D/[4 G D/[T[JF lS:;FDF\ .HFZNFZ £FZF jIFHGL DF\U6L SZL XSFX[ GCLP
18. lA,GL ZSDDF\YL S5FT5F+ AGTL CX[4T[TDS TYF VgI H~ZL SZGL ZSD lA,DF\YL S5FT SZJFDF\
VFJX[PH~Z H6FI TM l:SIMZL8L 0L5MhL8 DF\YL 56 S5FT SZJFDF\ VJX[P
19. SFDMDF\ WFZFvWMZ6 GF H/JFI TM H/:+FJ lJSF; ;lDTL £FZF H[ lG6"I ,[JFDF\ VFJX[T[DFgI ZFBJFGM
20. lJJFNGL AFATDF\ 5|F[H[S8 0FIZ[S8ZzL4 DWDU- B$cVG[ R[ZD[GzL, DWDU-B$c4lH<,FlJSF;
VlWSFZLzLGF[ lG6"I VFBZL U6FX[P
21. gIFI1F[+ :Y/ VG];FZ U6FX[P
22. .HFZNFZzLV[ SFD X~ SZTF 5C[,F ;F.8GL lJhL8 SZL ,[JLP ;F.8 ;OF. T[DH hF0L JU[Z[ 8[g0ZGF EFU~5[
N]Z SZJFGL ZC[X[P hF0L N]Z SIF" AFN SFD 5C[,FGF\ ,[J, TYF T.B.MJU[Z[WDT .HG[Z 5F;[ BZF. SZFJL
23. SFD 5}6" YIF AFN GF\ OF.G, ,[J, VG[ DF5 SMg8=FS8Z[ WDT .HG[Z ;FY[ ZCL ,[JFGF\ ZC[X[P WDT .HG[Z
N=FZF ,[JFDF\ VFJ[, DF5M DFgI ZC[X[P VG[ ;DIDIF"NFDF\ MDT .HG[Z £FZF ,[JFDF\ VFJ[, DF5M DFgI ZC[X[P
MDT .HG[Z nikimp&N<Yyini p\miNp#irj&kyi< bid kimg)r)n&>c&kvN&>krvimi>aivS[.
24. lC0G D[HZD[g8 H[JM S[ 5FIFG]\ BMNF645FIFG]\P.C.C4 ,MB\04OFp\0[XG JU[Z[ GM0, VMOL;ZVG[WDT.HG[Z
5F;[YL 5|DF6LT SIF" AFNH VFU/GL SFDULZL CFY WZJFGL ZC[X[ VFJL SFDULZLGF H~ZL OM8MU|FO; 56
,[JF VG[OF.G, AL, ;FY[ D]SJFGF\ ZC[XP[
25. S5RL4Z[TL45yYZ JU[Z[ DF, ;FDFGGL ZMI<8L .HFZNFZzLV[ D[/JL ,. AL, ;FY[ ZH] SZJFGL ZC[X[P
26. J5ZFI[, DF, ;FDFG GF BZLNLGF\ AL,M ZH] SZJFGF\ ZC[X[P
27. U]6JTF lGIDG[ ,FUTF H~ZL 5ZL1F6M .HFZNFZzLV[ :JBR[" ;ZSFZLVYJFTM ;ZSFZDFgI,[AMZ[8ZLDF\
28. H/:+FJGF\ SFDM lGIT ;DI DIFNF"DF\ 5}6" SZJFGF\ CM. T[ V\U[ IMuI U\ELZTF B]AH H~ZL K[P HYL JS"
VM0"Z D?IF AFN .HFZNFZzLV[ +6 lNJ;DF\ SFD X~ SZJFG]\ ZC[X[ VG[ JS" VM0"Z D?IFGL TFZLB YL +6
DF; DF\ SFD 5]6" SZJFG]\ ZC[X[P SFDULZL lGIT ;DI DIF"NFDF\ 5}6" G YFI TM HFC[Z AF\WSFD lJEFUGF\ lGIDM
29. .HFZNFZzLV[ SFD NZdIFGHFT[ CFHZ ZC[J] VYJFTM IMuI 5|lTlGWLq.HG[Z CFHZ ZFBJMP
30. SFDULZL DF8[ H[vT[ BFTFGF\ SOR ,[JFDF\ VFjIFK[4 T[ VF>8D DF8[ H[vT[ BFTFGF\ 8[SGLS, :5[;LlOS[XG T[
31. DH]Z ;CSFZL D\0/L SFD SZJF ;1FD H6FX[ TM D\0/LGF\ ;ZSFZLGLIDM ,FU] 50X[P
32. SMDG UF>0,F.G OMZ JM8ZX[04 VM5Z[Xg, UF>0,F.G VG[ 8[SGLS, D[gI], D]HAGL;]RGF TYF GLIDM
A\WGSTF" ZC[XP[
33. EZ[,F EFJM 8[g0Z l:JSFZJFGLK[<,L TFZLB YL !Z_ lNJ; ;]WLDFgIZC[X[P
34. U|Fg8GL p5,a3TF VG];FZ TYF SFDGL 5|FIMlZ8L D]HA JS" VM0"Z VF5JFDF\ VFJX[ VYJF 8[g0Z S[g;,
NAME OF WORK :- CONSTRUCTING A FILED OUTLET -19 Nos
AT.VILLAGE:- KAVLI
TA:- JAMBUSAR DIST :- BHARUCH
Qty Unit No. Description Rate Unit Amount
Excavation for foundation in all sorts of
soil including sandy And gravelly soil,
soft murrum including depositing the
excavated stuff as and where directed
66.69 Cu.m 1 including back filling the tranches with 314.60 Cu.m
suitable excavated stuff etc. complete
for lead up to 50 and lift as under.
(Manuly without dewatering)
Providing and laying Plain/Reinforced
cement concrete of cement, sand and
metal (abive 12mm &upto
20mmsize)in following proportion laid
in situ including centering, shuttering,
temping, smooth finishing, curing etc.
complete as directed for all leads and
(S.O.R Page No.24, I.No.19(iii))
Providing cement plaster in 20 mm
thickness and 1:3proprotion including
smooth finishing, curing, scaffolding
etc.complete for all leads and lift as
Providing and fixing marble plate of
100 cm thickness including engraving and
cm2 filling paint for letters as directed. cm2
RS.IN.WORDS :- EIGHT LAKH FOURTY SEVEN THOUSAND FOUR HUNDRED ONLY/-
NAME OF WORK :- CONSTRUCTING A NALA PLUG-04 Nos.
AT.VILLAGE:- KAVLI
TA:- JAMBUSAR DIST :- BHARUCH
Qty Unit No. Description Rate Unit Amount
Excavation for foundation in all sorts of
soil including sandy And gravelly soil,
soft murrum including depositing the
excavated stuff as and where directed
14.60 Cu.m 1 including back filling the tranches with 314.60 Cu.m
suitable excavated stuff etc. complete
for lead up to 50 and lift as under.
(Manuly without dewatering)
Providing and laying Plain/Reinforced
cement concrete of cement, sand and
metal (abive 12mm &upto
20mmsize)in following proportion laid
in situ including centering, shuttering,
temping, smooth finishing, curing etc.
complete as directed for all leads and
(S.O.R Page No.24, I.No.19(iii))
Providing cement plaster in 20 mm
thickness and 1:3proprotion including
smooth finishing, curing, scaffolding
etc.complete for all leads and lift as
Providing and fixing marble plate of
100 cm thickness including engraving and
cm2 filling paint for letters as directed. cm2
RS.IN.WORDS :- TWO LAKHS ONLY/-
I/We Shall Carry out above work at ……………..% Blow/Above
i.e at the cost of Rs…………………in Words…………………………………………………………….
Technical Expert
DWDU-Bharuch SMg8=FS8ZGL ;CLq;LSSM
V[SZFZGFD]{300 $.ni AT[Àp pr}
! 8[g0Z OMD"DF\ NXF"jIFD]HAGL SFDULZL SZJF DF8[ C]\ ;CDTK]\P H[ DF8[ 8[g0Z OMD"DF\ NXF"J[, TDFD XZTM TYF
lGIDMD[JFR[, K[PVG[T[DG[SA], D\H]ZK[P
Z SFDULZL DF8[GL ;F.8 V\NFH 5+ TYF :5[XLlOS[XG JU[[Z[D[HFT[RSF;[, K[P
# 8[g0Z OMD"GF ;L0I], B DF\ VDFZF äFZFEZ[,F EFJ[ SFDULZL SZJF T{IFZ K\\]P
$ 8[SGLS, :8FO TYF ;lDlTäFZF VF5JFDF\ VFJTL ;]RGFVM TYF DFU"NX"G DFgIZC[X[P
5 p5ZF\T SFDULZL V\U[ ;ZSFZzLTZOYL ;CFISVG]NFG D/JFDF\ lJ,\A YJFGF SFZ6M H[SZ[,FSFDM V\U[R]SJ6\]
SZJFDF\ lJ,\A YFI TM T[ R]SJ6\] lJ,\AYL ,[JFDF\ VDFZL ;\DlTK[P
SMg8=FS8ZGL ;CLVG[ ;LSSM
GENERAL TECHNICAL SPECIFICATIONS
1. In the specifications, “As directed” / “Approved” shall be taken to mean “As directed” / “Approved”
by the Engineer-in-charge.
2. Wherever as reference to any Indian Standard appears in the specification, it shall be taken to mean
as a reference to the latest edition of the same in force on the date of agreement.
3. In “Mode of Measurement” in the specifications wherever a dispute arise in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standard shall be referred to.
4. All measurements and computations unless otherwise specified, shall be carried out nearest to the
following limits :
(i) Length, Width and Depth (Height) 0.01 Mtrs.
(ii) Areas 0.01 Sq.Mtrs.
(iii) Cubic Contents 0.01 Cub.Mtrs.
In recording dimensions of work, the sequence of length, width and height (depth) or thickness shall
5. The distance which constitutes lead shall be determined along the shortest practical route and not
necessary the route actually taken. The decision of the Engineer-In charge in this regard shall be
taken as final.
6. Where no lead & lift are specified, it shall mean “all leads” & “all lift”.
7. For excavation lift shall be measured from center of gravity, of excavation depth to center of gravity
of deposition height. In case of foundation concrete and other items of cement concrete lift shall be
measured from ground level to center of gravity of depositing concrete.
8. Definite particulars covered in the items of work, though not mentioned or elucidated in its
specifications shall be deemed to be included therein.
9. Reference to specification of materials as made in the detailed specification of the items of works is
in the form of a design, action containing the number of the specifications of the material and prefix
10. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective
11. material brought on site or materials used in the work found defective at a later date. The contractor
shall have no claim to any payment or compensation whatsoever on account of any such materials
being rejected by the Engineer-in-charge.
12. The contract rate of the item of work shall be for the work completed in all respects.
13. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
14. Collecting of approved materials shall be done at site of work in a systematic manner; materials
shall be stored in such manner as to prevent damage, deterioration or intrusion of foreign matter
and to ensure the preservation of their quality and fitness of work.
15. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work.
16. All work shall be carried out in workmanship like manner as per the best techniques for the
particular item.
17. All tools templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works, during executive shall be kept in sufficient
numbers and in good working condition on the site of the work.
18. The mode, procedure and manner of execution shall be such that it doesn't cause damage or
overloading of the various component of the structure during execution or after completion of the
19. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer-in-charge shall not,
20. absolve the contractor from his responsibility of any adverse effects and consequence of adopting
the same in the course of execution of the work.
21. The contractor shall be responsible for observing the rules and regulations imposed under the
“Minor Minerals Act” and such other law and rules prescribed by Government from time to time.
22. All necessary safety measures and precautions (including those laid down in the
various relevant Indian Standards) shall be taken to ensure the safety of men, materials
and machinery on the site of work as also of the work itself.
23. The testing charges of all materials and concrete cubes shall be borne by the contractor.
24. Approval to any of the executed items for the work doesn't in anyway relieve the
contractor of his responsibility for the drawings and specifications.
25. All the items of the work shall required to be executed during the closer period of canal
concerned in muddy or wet soil. Contractor shall have to plan the execution of work according
to the closer period available in consultation with the Engineer -in-charge. No claim shall be
granted for the non- availability of closer period or enough closer period.
26. Contractor shall have to use mixture machine with hopper for mixing cement fine aggregates and
course aggregates for all concrete items.
Technical Specification
EXCAVATION FOR FOUNDATIONS
1.A.1 Excavation for foundation shall consist of carrying out excavation for the foundation for
structure and drains etc. in dry wet or slushy conditions including removal of the excavated stuff form
the foundation trenches and laying or stacking the same as and where directed by the Executive
Engineer. It also includes back filling of the foundation trenches with suitable excavated materials and
1.A.2. Site Clearance
1.A2.1 All areas required for laying and stacking excavated materials and diversion of
road if any required, shall be cleared off all trees, stumps, roots bushes, weeds, grass, rubbish of all
kinds, loose stones and all other objectionable materials.
1.A2.2 All materials obtained from site clearance shall be removed from the site so as
hot to interfere with the construction operation and maintenance of the project. These materials shall be
the property of Government and shall be dispose off in a manner specified by the Executive Engineer.
1.A2.3 Unless otherwise explicitly provided for the work clearing site as given above
shall be considered as included in the items of foundations excavation, however where trees greater than
60 cms. in girth are required to be removed. This shall be paid separately.
1.A.3. Excavation Classification
All materials in foundation shall be classified in to four items as under:
1.A.3.1 All sorts of soils
This shall include soil, silt, gravel, soft murrum, stiff clay, kanker and other soft
materials which can be excavated by means of pick and shovel, loose stones less than 0.93m3 which do
not required breaking up shall be treated as soil.
1.A.3.2 Hard Murrum
This shall include hard materials comprising all kinds of disintegrated rock or
shall or indurated clay or conglomerate interspersed with boulders of size less than 0.03,
weathered and decomposed rock which do not need blasting and can removed with pick, bar and shovel
though not need blasting and can removed with pick, bar and shovel though not without SL.,.ie
1.A.3.3. Soft Rock
This shall include all materials which is rock but does not need blasting and can be
removed with pick and bar by wedging but which does not come under the category of hard murrum, in
case when occasional blasting may be done for the convenience of excavation, the materials shall not be
classified as hard rock simply because blasting has been resorted to.It shall also include excavation in
boulders exceeding 0.03m3 but less than 0.75m3 in size.
1.A.3.4 Hard Rock
This shall include rock occurring in masses or boulders bigger than 0.75m3 which can best be removed
by blasting. This will also include rock to be removed by chiseling where blasting is not permissible.
1.A.4. Blasting
When blasting is required tobe carried out, all rules in force relating to the storing
transporting and use of blasting materials and precautions for safely of persons and property shall be
strictly observed.
1.A.5. Leads and lifts: Depth Slabs
1.A.5.1. Leads as specified in any item of foundation excavation shall mean the weighted
distance as the crow files between the C.G. of the excavation to the C.G. of the excavated
material laid or stacked as directed by the Executive Engineer. For computation of lead as
above, each structure shall be considered level at the cross section.
1.A.6. Setting Out
1.A.6.1. It shall be the responsibility of the contractor to install substantial reference
points, bench marks etc. at his cost and maintain them during the construction period.
Excavation shall be allowed to commence only after the reference points as benchmarks as above as
established from the Executive Engineer.
1.A.6.2. The areas for laying for stacking the excavated materials tobe used for back
filling in the trenches and for the surplus excavation material, for stacking construction materials and for
construction operations shall also be marked out before starting the excavation.
1.A.7. Excavation & deposing excavated Materials
1.A.7.1. The excavation shall be carried out to the exact lines and levels as specified in the
drawing or as directed by the Executive Engineer. Any extra excavation beyond such lines and levels
shall not be measured and paid for. The excavation below the foundation level shall have not to be filled
back by the contractor with cement concrete of the same proportion as for foundation concrete. The
extra excavation beyond the lines of foundation shall have tobe filled back by the contractor at his cost
with the materials and in the manner specified for back filling of foundation trenches.
1.A.7.2. No extra payment shall be made for slips etc. and same have to be restored by the
contractor at his cost.
1.A.7.3. The excavated material which is considered suitable and required for back filling
of foundation trenches shall be stacked sufficiently which (and in no case nearer than 1.5 mts.) from the
edges of excavation so as not to endanger the stability of the sides or slopes of excavation. the
excavation stuff in excess of above requirement and suitable for filling behind the abutments of returns
abd in approach embankment or canal banks shall be conveyed and laid directly in layers upto the lead
and lift specified in the item. No separate payment shall be made for this. Compaction of material so
laid, if required, shall be paid for separately, if the contractor fails to lay the material as above and waste
it the cost of getting the earth work done by obtaining equivalent quantity, from borrow pits shall be
wasted in the spoil banks of canals as directed by the Executive Engineer, in uniform layers.
1.A.7.4. The excavated stuff when deposited in spoil bank shall be so deposited as not to
obstruct any roads. Tracks of natural drainage and not to interefere with the construction
operation and maintenance of the work.
1.A.7.5. The materials obtained from excavation of soft rock and hard rock shall be sorted
out to separate the rubble, spauls and the materials which can be used in embankment. The useful
materials as approved by the Executive Engineer shall be utilized in embankment. The rubble and
spauls obtained from excavation shall be properly stacked in measurable charts as directed. The rest
shall be wasted in spoil banks.
1.A.8 Shoring and stinting
1.A.8.1. In reaches where vertical excavation is not possible, suitable slopes according to
the strata encounted shall be given. Measurement, for payment shall however be considering sides of all
foundation trenches as vertical.
1.A.8.2. Adequate step shall be taken to prevent slips. However, if slip occur the slopes
should be fattened or other measures taken for stabilizing the slopes. The sides shall be strutted and
shorter carefully and adequately where they areliable to fall. The contractor shall clear the foundation
trenches of slipped material at his cost. The Government shall nor be responsible for any accidents
occurring due to slips or any other cause and all liabilities shall be covered under the scope of them.
1.A.9 Preparation of Foundations
1.A9.1. The bottom of the foundation shall be dressed perfectly in level of benched as directed
and all lose and soft materials shall be removed before the foundation is covered. The foundation shall
be well watered and rammed before laying concrete or masonary over it, if the foundation is in strata
other than rock, If it is in rock, it shall be throughly cleaned and wetted. Before it is covered, the
foundation shall be got approved from the Executive Engineer.
1.A.10 Siting of Foundations
If the foundation trenches get silted up due to intervening floods or due to other
reasons. The same shall be desilted and restored to the required dimensions and recleaned by the
contractor at his cost.
1.A.11 Dewatering and Viersion
1.A.11.1 Any surface water flow shall be suitably diverted precautions taken to portent the
same from the entering the foundation trenches.
1.A.11.2. Any surface water entering the foundation trenches or sub soil water if any
encountered shall be removed by dewatering the foundation trenches either manually or by using
mechanically or electrically operated pumps as per the requirement. The water so removed from the
trenches shall be thrown sufficiently away so that it may not-re-enter the foundation or obstruct
construction operation.
1.A.11.3. Foundation trenches shall be kept adequately dewatered so that they are maintained
continuously in dry condition until. The foundation preparation, laying of concrete and
back filling are completed.
1.A.11.4. The Rates for the items of foundation excavation cover the operations of
diversion and dewatering which shall not be paid for separately unless separate, item is
provided for same in the contract.
1.A.12. Refilling of foundation trenches
1.A.12.1. After foundation concrete is laid and masonry other structure constructed the
remaining space in the foundation trenches shall be backfilled with suitable selected
material from the excavation material 15 Cms. in thickness. Each layer shall be watered
in thoroughly compacted by ramming, "Before laying an another layer over it".
1.A.12.2. Any filling above the original gouhd levels before excavation if required and got
shall be paid for seperately.
1.A.12.3. Care shall be taken to ensure that the method of back filling and compacting the
earth does not/; cause any, damage or undue strain on the structure. If compacting the earth does not
couase any damage or undue strin on the structure, If compaction be rollers is permitted,they shall not
be used within one meter of concrete or masonry, structure, Special care shall be exercised to obtained a
good contact and bond with the surface of concrete of masonry.
1.A.13 Measurement and Payment.
1.A.13.3 Measurement for the foundation excavation shall be base don cross section and
the rate is per cubic meter. Cross sections shall be taken at 3m. or closer intervals if foundation
necessary to represent correctly the topography, before starting the work then the strata changes and on
completion of the excavation levels shall be recorded again at the same locations. From the level taken
as above cross-sections shall be plotted on graph paper Both the leveling books and cross sections shall
be signed by the contractor in token of acceptance, and work shall not be started before the levels
for'..}(pitial measurements are so signed.
1.A.13.2. The rate covers all the operationhs as mentioned in this section.
SPECIFICATION OF MATERIALS
1.1 Cement shall be ordinary Portland cement. Ordinary Portland cement of 43/53
1.2 grade shall be as per IS-8112-1989 and ordinary Portland cement of 53grade shall be as per
IS-12269-1987. Portland pozzolona cement shall bepermitted if ordinary Portland cement
shall not be available in market at the time of xecution of the work. Contractor shall have to
receive written permission from Executive Engineer in charge of the work to use Portland
pozzolona cement before using it on the work.But in any case Portland pozzolona cement
shall not be permitted to use in R.C.C. work.
2.0 Sand must be as per IS-2386 ( part I &II )
2.1 Sand shall be natural sand, clean, well graded, hard strong, durable and gritty
particles free from injurious amount of dust clay, kankar, nodules, soft or flaky
particles, shale, alkali, salts, organic matter, leon, mice or other deleterious
substances and shall be got approved by the Engineer-in-charge. The sand shall not
contain more than 5% of silt as determined by field test, if necessary the sand shall
be washed to make it clean.
The fineness modules of coarse sand shall not be less than 2.5 and shall not
The sieve analysis of coarse sand shall be as under :
Percentage by weight
I.S. Sieve Designation I.S. Sieve Designation weight
The fineness modules shall not exceed 1.0. The sieve analysis of fine sand shall
I.S. Sieve Designation I.S. Sieve Designation Percentage
Percentage by weight
passing through passing through by weight
5.1 Water shall not be salty or brackish and shall be clean, reasonably clear and
free from objectionable quantities of silt and traces of oil and injurious alkalis,
salts, organic matter and other deleterious material which will either weaken the
mortar or concrete or cause efflorescence. Water shall confirm to the standards
specified in I.S. 456-1978.
5.2. If required by the Engineer-in-charge, it shall be tested by comparison with
distilled water. Comparison shall be made by means of standard cement
tests for soundness, unsoundness, change in time of setting by 30 minutes or
more or decrease of more than 10% in strength of mortar prepared with
water sample when, compared with the results obtained with mortar
prepared with distilled water shall be sufficient cause of rejection of water
5.3 Water for curing mortar, concrete or masonry should not be too acidic or too
alkaline. It shall be free from elements, which significantly affect the hydration
reaction or otherwise interfere with hardening of mortar of concrete during curing
or these, which produce objectionable stains or other unsightly deposits on
concrete or mortar surfaces.
5.4 Hard and bitter water shall not be used for curing.
5.5 Potable water will generally found suitable for curing mortar or concrete.
M-18. Mild Steel Bars
18.1. Mild steel bars reinforcement for R.C C. work shall conform to I.S. 432 (Part -II) 1966 and shall
be of tested quality. It shall also comply with relevant part of I.S. 456-1978.
18.2. All the reinforcement shall be clean and free from dirt, paint, grease, mill scale or loose or thick
rust at the time of placing
18.3. For the purpose of payment, the bar shall be measured correct up to 10 mm. length and weight
payable worked out at the rate specified below :
1. 6 mm 0.22 Kg/Rmt. 8. 20 mm. 2 47 Kg/Rmt
2. 8 mm. 0.39 Kg/Rmt. 9 22 mm. 2.98 Kg/Rmt.
3. 10 mm. 0.62 Kg/Rmt. 10. 25 mm. 3.85 Kg/Rmt.
4. 12 mm. 0.89 Kg/Rmt. 11. 28 mm. 4.83 Kg/Rmt.
5. 14 mm 1.21 Kg/Rmt. 12. 32 mm. 6.31 Kg/Rmt.
6. 16 mm 1 58 Kg/Rmt 13. 36 mm. 7 99 Kg/Rmt. *
7. 18 mm. 2.00 Kg/Rmt. 14. 40 mm. 9,86 Kg/Rmt.
M-19. High Yield Strength Steel Deformed Bars
19.1. High yield strength steel deformed bars shall be either cold twisted other rolled and shall conform
to I.S. 1786-1966 and I.S. 1139-1966 respectively.
19.2. Other provisions and requirements shall conform to specification No. M-18 for Mild Steel
Bars.M-20. High Tensile Steel Wires
20.1. The high tensile wires for use in pre stressed concrete work shall conform to I.S,2090-1962.
20.2. The tensile strength of the high tensile steel bars shall be as specified in the item. In absence of
strength the minimum strength shall be taken as per Para 6-1 of the I.S. 1785-1962. Testing shall be
done as per I.S.requirements.
20.3. The high tensile steel shall be free from loose mill scale, rust, oil, grease, or any other harmful
Cleaning of steel bars may be carried out by immersion in solvent solution, wire brushing or passing
through14 a pressure box containing Carborudum.
20.4. The high tensile wire shall be obtained from manufacturers. in coils having diameter not less then
350 times the diameter of wire itself so that wire springs back straight on being uncoiled .M-21. Mild
Steel Binding Wire
21.1. The mild steel wire shall be of 1.63 mm. or 1.22 mrn. ( 16 to 18 gauge ) diameter and shall
conform to I.S. 280-1972.
21.2. The use of black wire will be permitted for binding reinforcement bars. It shall be free from rust
oil paint, grease loose mill scale or any other undesirable coating which ma
24.22. Providing and laying (to level or slopes) and jointing reinforced concrete light duty
non-pressure pipes I.S. class N.P. 2 of the following internal diameters with collars and butt ends
prepared for collar joints including testing of joints etc. complete. (B) 150mm. (C) 250 mm. (D)
mm. (E) 450 mm. (F) 500 mm. (G) 600 mm. (H) 900 mm.(K) 1000mm. (M) 1200 mm.1.0. Materials
:The reinforced concrete light duly non-pressure pipes of specified diameter shall conform to I.S.458-
2.0. Workmanship
2.1. The relevant specifications of item No. 24.1. A shall be followed for work of trenches
except that the excavation in trenches shall be for. reinforced concrete pipes of specified diameter.
2.2.1. The pipes shall be lowered into the trenches carefully. Mechanical appliances may be used.
Where necessary pipe shall be laid in straight lines or with easy curves and true to line and gradient as
specified. The laying of pipe shall proceed upgrade of a slope. In the pipe spigot and socket joints, the
socket ends shall face upstream. In case of pipes with joints to be made with loose collars, the collars
shall be slipped on before the next pipe is laid.
2.2.2. In case where the foundation conditions are unusual such as the proximity of trees or holes,
under existing or proposed all round in 150 mm. thick cement concrete 1:5; 10 (1 cement: 5 fine sand :
10 graded stone aggregate 40 mm. nominal size) or compacted sand or gravel:
2.2.3. In case where the natural foundation is inadequate the pipes shall be laid either in concrete
cradle, supported on proper foundations or on any other suitably designed structure. If concrete
bedding is used, the depth of concrete below bottom of the pipe shall be at least 1/4th of the internal
diameter of the pipe subject to a minimum of 100 mm.and a maximum 300 mm. The concrete shall be
extended up the sides of the pipe at least to a distance of 1/4th of the outside diameter for pipes
mm. and over in diameter.
2.2.4. The pipes shall be laid in the concrete bedding before the concrete has set. Pipes laid in trenches
in earth shall be bedded evenly and firmly and as far as up to the haunches of the pipe as to safely
transmit the load expected from the back fill through the pipe to the bed. This shall be done either by
excavating the bottom of the trenches to fit
the curve of the pipe or by compacting the earth under a round curve of the pipe to form an even bed,
Necessary provision shall be made for joints wherever required.
2.3.1. The joints shall be done by slipping the collar over and clear of the end of the pipe. The recess of
the end of the pipe shall be filled with jute braiding in hot bitumen. The new pipe shall then be brought
forwarded until the bitumen ring in recess of first pipe is set into the recess of the second pipe. The
process shall be repeated for two or
three pipes which shall then jacked up so as to thoroughly compress the bitumen. The quantity of jute
and bitumen shall be just enough to fill the recess when pressed hard by jacking, care being taken that
no offset of the jute braiding shall be visible either outside or inside of pipe. The collar shall then be set
up over the joints covering equally both the
pipe and leaving, an even caulking space all round. Cement and sand mortar: 1: 1.1/2 shall then be well
punched or pressed home with a caulking tool within this caulking space. Care shall be taken that the
underside of the joints is properly filled with mortar.
2.4.1. Every joints shall be kept wet for about 10 days for maturing. The section of the pipe line laid
and jointed shall
be covered immediately to protect from weather effects. Minimum bore of 100 mm. is considered
2.4.2. The joints shall be left exposed for observation.
2.5. Testing of Joints :
2.5.1. The testing of joints shall be done as per relevant specifications of item No. 24.1 (A) except that
of reinforced concrete pipes shall be done.
3.0. Mode of measurements & payment
3.1. The relevant specifications of item 24.1 .(A) shall be followed except that the rate includes for
laying to level
or slope in trenches etc. (measured separately), making the joints a; Seated and testing to stand the
3.2. The measurements shall be net without any allowance for cutting and waste. The length of bends,
and other connections (measured along the centre line) shall be included in the total length of the pipes,
connections being numbered afterwards and paid for extra over pipes.
3.3. The size of bend, junctions, etc, shall suit the size of pipe. The bore (internal diameter of pipe)
shall be the criterion for payment.)(3.4. Nothing extra shall be paid separately for the use of
mechanical appliances, where necessary, as described above.
3.5. The rate shall be for a unit of One running meter.
3.2.1. Concrete shall be composed of cement, sand, coarse aggregate and water, all well mixed
in proper proportion as specified in the item by volume or by weight as specified in the item,
andbrought to the proper consistency. For volumetric betching one full beg of cement shall
beconsidered 0.034 m3. Other materials shall be measured by suitable measuring boxes. If the
sandwetat the time of mixing, due allowance as determined by test from time to time shall made
forbulkage of sand due to moisture. The proportion of sand coarse aggregate shall be varied slightyif
required on the basis of laboratory tests to get dense workable concrete of design strengths. Noextra
payment shall be made for (such) variation that may have to be made. The quality to waterto be used
shall be decided by the Executive engineer so to get concrete of required work abilitywhen batching by
weight is specified. the proportion of cement, sand and coarse aggregate shall
be as determined by laboratory testing for the respective class of concrete mix M. 10, M 15, M 20 etc.
The water cement ratio shall also be as given by the laboratory testing.
3.2.2. The concrete shall be mixed in mechanical mixers of approved type which will ensure a
uniform distribution of the materials throughout the materials throughout the mass. The mixer shall not
be loaded in excess of its rated capacity and each batch shall be for whole bag of cement. Mixing shall
be for whole bag of cement, Mixing shall be continued until there is a uniform distribution of the
materials and the mass is uniform in colour and consistency, but in no case shall the mixing be done for
lessthan two minutes. The first batch of concrete at the commencement of work with any mixer shall be
made richer by adding 10 % of cement extra over and above that required for the particular mix,. The
mixer drum shall be completely emptied before receiving materials for succeeding batch. The drum
shall be cleaned at frequent interylas while in one and shall be thoroughly washed when mixing
operations case for any period longer than 30 minutes.
3.2.3. All ingredients shall be fed into mixer simultaneously A portion of water form 5 to
percent shall preceded and the like quantity shall follow the introduction of other materials. The
remaining of water, quantity of which shall be predetermined shall be added uniformly and
simultaneously with the other materials.
3.2.4. No hand mixing shall be permitted except in the even of breakdown of the machine
during concreting of panel. Whenever such handmixing is restored to 5 percent extra cement shall be
used. Hand mixing shlal be done in the manner as directed by the Executive Engineer, on a water tight
platform and care shall be taken to ensure that mixing is continued until the mass in uniform in colour
and consistency. No patch of hand mixing shall of more than two bags of cement.
3.2.5. Concrete shall be handled from the place of mixing to the place of final deposit and
placed in position as rapidly as practicable but always within a period of 30 minutes after
mixing, by methods which will prevent the segregation and/or loss of any ingredients or
reduction in slump. If segregation does occure during transport, the concrete shall be rammed before
being placed in position. The concrete shall be placed and compacted before setting commences and
should not be subsequently disturbed.
3.2.6. In order to test the consistency of concrete. Slump test shall be made by the contractor as
and when required. The slump test shall be carried out as per IS - 456. The allowable slump for concrete
shall be decided by laboratory testing or as directed by the Executive Engineer.
3.2.7 One set test cubes 15cms x 15 cms x 15 cms shall taken for every 30 m3 or part concrete
subject to a minimum of one set for a day's work from each set, 3 cubes shall be tested at
days, 3 cubes and 28 days (and also 3 cubes at 90 days when pozzolona cement is used)
Samples of concrete for test cubes shall be taken at the mixer and it shall be representative
of the entire batch.
The location in the work of the batch of concrete thus sample shall be noted for future
reference, when tested are 28 days (at 90 days when pozzolana cement is used) at least 80 % of the test
cubes shall give compressive strength not less than the specified strength and no test cubes shall give
compressive strength less than the 80 % of the specified strength.
3.2.8. The specified strength different classes of concrete as per IS Classification and for
concrete made of different properties fisefeement. sand coarse aggregate by volume shall be as
Class of Proportion ProportionFor OPC For OPC
mix Batching by volume Compressive Compressive
Strength Strength
7 Days 28 days 7 days 28 days 90 days
3.2.9 In case the results fail to fulfill the above strength requirements, respective portion of the
work shall be removed and redone the work by contractor at his cost. At the discretion of
the Executive Engineer the work may be accepted and paid at a reduced rate as may be
decided by him.
Meausrement and Payment
The Concrete work Measurement and payment shall be made on cubic metre basis on the
section as designed and directed.
4.5.1. Plastering shall be done with cement sand mortar of 1:3 proportion unless otherwise
specified in the item. The sand tobe used shall be fine sand passing through 1201. S.S. mesh and shall
confirm in all other respects to the specification under section-2 materials.
4.5.2. A base or key coat of coarse sand and cement in proportion of vie parts of sharp sand
passing 6mm. mesh to one part of cement mixed in sufficient water shall be applied,being
dashed on to the masonry face in uneven manner. This coat shall be supplied till stone bushing is
covered and its thickness shall be 6mm.
4.5.3. Backing Coat: The mortar for this shall be mixed adding waterfrom 12 to 16% of total
volume of aggregate and cement. It shall be laid to uniform thickness 10mm, and just after the materials
has started to set. It shall be secured in wavy lines by wire nail comb to form a bond for the next coat
and the work than be allowed to set for at least 30 hrs., the work being well damped.
4.5.4. Finishing Coat: The water in the mortar for this coat shall be 14 to 18 percent of the toal
volumeof aggregate and cement. Finishing coat shall be approx. 4mm thick and should be
applied evenly and finished smooth with neat cement or neeru as specified. 4.6. Scaffolding to be done
4.6.1. The cost of providing and maintaining scaffolding required for the work of masonry,
pointing and plaster shall be considered to have been included in the rates quoted for their
4.7.1. "All masonry, as it progresses, shall be kept well watered on the top and sides for a
period of not less than 21 days from the date building in place. At the close of the days work or for other
period of cessatin of the work, the top of all masonry tobe kept well watered. The masonry shall be kept
moist during the peiod of initial and final setting of mortar. Curing by way of ponding shall be started
only after the period of final set of mortar. Care shall be taken to ensure that cement is not washed from
4.7.2. All pointing and plaster shall be kept continuously wet for less than 21 days taking care
as mentioned in para 4.7.1.
4.7.3. If the contractor fails to water the work as specified the Executive Engineer will employ
labour, material and equipments etc. for curing without giving notice and the cost of these
shall be borne by the contractor.
Measurement and Payment
The plaster work Measurement and Payment shall be made on Squaremetre basis
of surface plastered as shown on the drawing or as directed .
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
kavli-01 tender Docs.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .