Tender Value
Refer Docs
EMD Value
₹21.7 L
Closing Date
27 Jul 2026, 3:00 pm
S.E.K.C.C.2, Mirzapur
Office of Superintending Engineer, Kanhar Construction Circle-2, Mirzapur
Balance E/w and Pucca work at various chainage in Harpura Minor, Dhorpa Minor, Pakri Minor, Bome Minor and Jorukhad Minor, off-taking from Parent canal RKC.
2026_UPIDC_1166039_2
01/SE/2026-27
Open Tender
Civil Works
120 days
Duddhi Sonebhadra
Please refer Tender Documents.
2 documents required · 2 mandatory
₹2,360
₹21.7 L
6 Jul 2026
6 Jul 2026
27 Jul 2026
6 Jul 2026
27 Jul 2026
10 Jul 2026
6 Jul 2026 - 10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of canal with manual compaction and dressing below 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1,771.91 | cum | - | - |
| 2 | Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1,988.18 | cum | - | - |
| 3 | Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 2,687.94 | cum | - | - |
| 4 | Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material T&P etc. required for proper completion of work as per direction of Engineer in Charge. | 1,163.51 | cum | - | - |
| 5 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 2,423.44 | cum | - | - |
| 6 | Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 2,08,807.73 | cum | - | - |
| 7 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 1.00km including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 208.63 | cum | - | - |
| 8 | Site Clearence/Ordianry jungle clearance for layout and survey work at construction site including all leads and lifts, labour charges, T&P etc. and its disposal required for proper completion of work as per direction of Engineer-in-charge. | 6,959 | sqm | - | - |
| 9.1 | Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand mixed with Bajari, Kankar or Mooram including all lift and lead up to 90m and including filling watering, ramming of excavated earth into the trenches or upto the space and sides of foundation trenches including all leads and lifts, labour charges, T&P etc. and its removal and disposal of surplus earth required for proper completion of work as per direction of Engineer-in-charge. | 3,825.45 | cum | - | - |
| 9.2 | Earth work in excavation of foundation in soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 90m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 975.17 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tender_document_Lot_2.pdf
Tender Documents • 2.34 MB
BOQ_2188086.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid