| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAccepted-AOC D NO 37 8 1 MANCHUKONDA GARDENS INDUSTRIAL ESTATE VISAKHAPATNAM 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹37.8 L+₹2.2 L (6.16%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹39.0 L+₹3.4 L (9.53%)Rejected-Finance D NO 9 947 66 DOCTORS COLONY SHIVAJI PLEM VISAKHAPATNAM 530017 | VISAKHAPATANAM | ANDHRA PRADESH | 530017 | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹41.7 L+₹6.1 L (17.2%)Rejected-Finance DOOR NO 15 1 141 BHAVANA ENCLAVE 1 NEAR HOTEL GRAND BAY MAHARANIPETA NOWAROJI ROAD VISAKHAPATNAM 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹44.1 L+₹8.6 L (24.1%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
1 Oct 2022, 6:00 pmClosed
Garrison Engineer P Navy Kalinga Visakhapatnam
Garrison Engineer P Navy Kalinga Military Engineer Services INS Kalinga PO Visakhapatnam 531 163
REPAIRS/MAINTENANCE TO COOLING TOWER AIR HANDLING UNITS ALLIED WORKS AT INS KALINGA INS KARNA AND NAD BHEEMUNIPATNAM UNDER GE (P) NAVY KALINGA
2022_MES_549300_1
GE (P)/N/K/8951 OF 2022-23
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer P Navy Kalinga Visakhapatnam
Class D, Category c (i)
6 documents required · 6 mandatory
₹500
Garrison Engineer P Navy Kalinga Visakhapatnam
₹1 L
Yes
21 Oct 2022
1 Sept 2022
3 Oct 2022
1 Sept 2022
1 Oct 2022
17 Sept 2022
Amount
M&L for Dismantling of electrical connections , taking down existing cooling tower motor from cooling tower of the following capacity and carrying out the repairs by filling metal on the worn out portion of shaft, machining to the standard size of hub, removing the bend, checking the balancing and S&F new cooling tower hub and fan including fixing, testing and commissioning of the following capacity of AC plants, complete all as directed by Engr-in-charge.
70 TR capacity hub with 4 blades
100 TR capacity hub with 4 blades
150 TR capacity hub with 6 blades
180 TR capacity hub with 6 blades
Taking down the defective water sprinkler assembly consisting of water distribution pipe set of 4 Nos, sprinkler unit, balancing tie rod set,etc and S&F new sprinkler unit made out of die cast aluminium, 1 No. water distribution pipe of HDPE 4 Nos including necessary dripping holes end dummy and 4 Nos tie rod with necessary clamps including testing and commissioning the sprinkler assembly for the following capacities of FRP cooling tower of induced draught type complete all as directed by Eng-in-charge.
70 TR capacity
100 TR capacity
180 TR capacity
M&L for complete over hauling, servicing of cooling tower FRP type , removal of complete scales , dirt etc . by using chemicals, cleaning the sump louvers PVC fills, fan assembly, renewal of spray nozzle with connected pipe ,renewals of nuts bolt, leak arresting of the FRP tank, replacing PVC fills and complete painting of the cooling tower all as specified and shaft bush and carrying out repair to cooling tower by taking down the choked PVC fills,segments,rusted structural supports ,bolts & nuts repair to PVC segments cold water sumps, broken nozzles, cleaning the cooling tower fan assembly, overhauling of fan motor, sprinkler system including replacement of defective parts such as nozzles, mesh sprinkler PVC common header pipes valve, bolts and nut strainer, arresting of base leakages if any removing and cleaning of fungus complete including white washing the base complete all as specified and as directed by Eng-in-charge as directed. Note :-PVC fills shall be measured and paid separately under relevant sch of item.
70 TR capacity
100 TR capacity
150 TR capacity
180 TR capacity
S&F PVC fills of size 600X300X150 mm (Blocks) suitable for cooling tower of capacity upto 70 TR AC plant including taking down old unserviceable PVC fill complete all as specified and as directed ,complete all as specified and as directed by Eng-in-charge.
S&F PVC fills of size 600X300X150 mm (Blocks)suitable for cooling tower of capacity upto 100 TR AC plant including taking down old unserviceable PVC fill complete all as specified and as directed ,complete all as specified and as directed by Eng-in-charge.
S&F PVC fills of size 600X300X150 mm (Blocks)suitable for cooling tower of capacity upto 180 TR AC plant including taking down old unserviceable PVC fill complete all as specified and as directed ,complete all as specified and as directed by Eng-in-charge.
Material & Labour for carrying out the chemical servicing /checking/inspection of the Air Handling units & cooling coils by applying the non-acidic scale removing agent to the fins area of the cooling coil, copper tubes, remove the complete scale deposit across the coil, flushing through and complete blowing out the dirt, cleaning the fan impellers, filter section, fan section and complete cleaning of filters, tightening of all bolts & nuts, renew the rusted bolts & nuts checking the alignment of the drive set ,greasing of blower motor ,checking of electrical connection, cleaning of air filter, replacement of un serviceable bearing renewal of rusted sheet metal screws ,applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the Air Handling units of the following capacity AC Plants complete all as directed by Eng-in-charge.
60 TR Capacity
70 TR Capacity
120TR Capacity
M&L for GI metal frame with powder coated pre filters 90% down to 10 micron filtering capacity made out of fibre visc washable type AHU filter size 550x550x50 mm, including taking down old u/s filter complete all as directed.
M&L GI metal frame with powder coated pre filters 90% down to 10 micron filtering capacity made out of fibre visc washable type AHU filter size 610x610x50 mm including taking down old u/s filter complete all as directed.
M&L for disconnecting electrical/ mechanical connections defective unserviceable Motor from cooling tower , taking down the defective Induction Motor of any make / model shifted to work shop for dismantling motor , remove burnt out winding from stator and rewinding the stator with same gauge super enamelled copper conductor with necessary insulation materials , varnishing backing re-assembling motor including replacement of both end bearings complete all as directed of the following capacities :- Note : After completion of the job, motor to be shifted to site and reinstalled at its original position including alignment with electrical connections and testing for best performance.
Motor upto 5 HP
Motor to 10 HP
Material & Labour for taking down the defective worn out AHU shaft by dismantling the drive set, dismantling the AHU fan section, filter section, impellers etc and taking out the shaft, transporting to work shop and carrying out the repair by filling the metal on the worn out portion, both end, machining to the standard size of the bearing, removing the bend and checking the balancing fixing back to position, assembling dismantled sheet metal parts and testing commissioning the AHU of various capacity AC plants including necessary alignment of drive set complete all as directed.
M&L for vacummising the complete system of various capacity of central type AC plants with vacuum pump as per the standard practice and charging refrigerant R-22 gas including checking of leaks and testing & commissioning of the system complete all as directed. Make :- Mafron/Freon
M&L for vacummising the complete system of various capacity of central type AC plants with vacuum pump as per the standard practice and charging refrigerant HFC 134a gas including checking of leaks and testing & commissioning of the system complete all as directed. Make :- Mafron/Freon
M&L for vacummising the complete system of various capacity of central type AC plants with vacuum pump as per the standard practice and charging refrigerant HFC R-407a gas including checking of leaks and testing & commissioning of the system complete all as directed. Make :- Mafron/Freon
Supply and filling compressor oil complete all as directed by Eng-in-charge. Make: Servo 69/Sheetal-68
S&F in repairs pressure gauge (0-7 Kg/Cm²) including necessary specials and provision of suitable ferrule etc., complete all as specified and directed.
Taking down old unserviceable 80 mm dia CI butterfly valve and S&F 80 mm dia CI butterfly valve, PN 1.0, pneumatic double acting actuator with both sides flanges and gaskets complete all as specified and directed.
Taking down old unserviceable 100 mm dia CI butterfly valve and S&F 100 mm dia CI butterfly valve, PN 1.0, pneumatic double acting actuator with both sides flanges and gaskets complete all as specified and directed.
Taking down old unserviceable 150 mm dia CI butterfly valve and S&F 150 mm dia CI butterfly valve, PN 1.0, pneumatic double acting actuator with both sides flanges and gaskets complete all as specified and directed.
S&F upto 50mm dia. brass float valve screw type with necessary check nut, washers etc, as per the site condition at make up water tank of the cooling tower of the various ac plant ,complete including taking out old valves complete all as specified and directed.
S&F ball valve upto 25 mm complete including taking out old valves complete all as specified and directed. .
S& F ball valve upto 40 mm complete including taking out old valves complete all as specified and directed. .
S& F ball valve upto 50 mm complete including taking out old valves complete all as specified and directed. .
S&F 100 mm bore Non Return Valve cast iron end flanged type with necessary nuts, bolts and washers complete all including taking down defective unserviceable as per site condition all as specified and directed.
S&F 125 mm bore Non Return Valve cast iron end flanged type with necessary nuts, bolts and washers complete all including taking down defective unserviceable as per site condition all as specified and directed.
S&F 150 mm bore Non Return Valve cast iron end flanged type with necessary nuts, bolts and washers complete all including taking down defective unserviceable as per site condition all as specified and directed.
Supply, laying and testing, galvanised iron pipe, medium grade with all fittings such as Tee, bends, elbows, sockets, reducer, tee union etc of medium grade, ISI marked fixed to walls/floors/ceilings/trenches including groove cutting for concealed plumbing as required at site and making good the damaged surfaces complete all as specified and directed for the following bores:-
(a) 25 mm bore
(b) 40 mm bore
S & F of 2000 Ltr capacity of Rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I including tank nipple, tank adaptor, union etc complete fitting , including taking down old unserviceable all as specified and as directed.
All as per item No.28 above but of 5000 ltr capacity
Cleaning of PVC tank with bleaching powder and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes, etc of capacity exc 1000 ltr but n.exc 2000 ltr and painting the date of cleaning.
M&L for overhauling of existing star delta starter cleaning of all power contactor terminals replacement if required and renewal of unserviceable perished copper wiring, aluminium/ copper lugs, push buttons and indication lamps etc, including necessary electrical connections and testing the motor with load all as directed by Engineer-in-Charge.
Supply and fixing copper cable PVC insulated sheathed 1100 volts grade multi core copper conductor round 3 core 6 Sq.mm. all as specified and directed.
S&F in repairs ammeter 3 phase 415V,50Hz digital type (0-200 Amps) with necessary electrical connections to suit existing panel etc complete all as specified and directed.
Supply and Fixing in replacement MCCB 3 pole, 250 amps, 415V, 36 KA, thermal magnetic release and connecting with new lugs as directed and required at site complete all as specified and directed by Engineer- in-Charge.
Supply and Fixing in replacement MCCB 3 pole, 350 amps, 415V, 36 KA, thermal magnetic release and connecting with new lugs as directed and required at site complete all as specified and directed by Engineer- in-Charge.
M&L for painting up to 5 HP and cooling tower motor with two coats of synthetic enamel paint over and including one coat of red oxide primer, including cleaning and degreasing the surface complete all as directed by Engineer-in-Charge.
All as per item No. 36 above but for 6 to 10 HP capacity cooling tower motor .
M&L for complete servicing of motor control centre includes replacement of burnt out lugs, busbar unserviceable contactors, cleaning of panel, checking of serviceable and operational condition panel of timer and refixing, ensure of panel door closing, checking of internal wiring including same colour existing painting complete all as manufacturer's instruction all as specified and directed by Engineer- in - charge. Note :i) The rate quoted shall be deemed to included for lugs ,busbar modification, T&P MS nuts, bolts, panel painting etc ii) Spare parts shall be measured and paid separately under respective item as supply only and the unit rate quoted shall deemed to included the cost of labour for fixing the spares.
Supply only MCCB 350 amp TP, 36 KA
Supply only MCCB 250 amp TP, 36 KA
Supply only contactor 3 pole MNX 50
supply only power contactor 3 pole MNX 32
supply only power contactor 3 pole MNX 25
supply only axillary contactor MNX-A1
supply only axillary contactor MNX-A2
supply only power contactor 3 pole MNX 18
supply only power contactor 3 pole MNX 9
supply only MCB 63 amps 4 pole
Servicing of sub panel of compressor including replacement of burnt out lugs, unserviceable contactors, cleaning of panel, checking of serviceability of timer and refixing, ensure of panel door closing, checking of internal wiring including same colour of existing painting complete all as specified and directed by Engineer- in - charge.
Removing unserviceable, corroded MS ERW pipe of 100 mm dia and S&F upto 100 mm dia MS Pipe (medium grade) with necessary fittings like Elbow, flanges, dummy flange, welding bolts, nut and valve strainers, including supports complete as in water pipe lines all as per site requirement including testing and commissioning complete all as directed.
Removing unserviceable, corroded MS ERW pipe of 150 mm dia and S&F upto 150 mm dia MS Pipe (medium grade) with necessary fittings like Elbow, flanges, dummy flange, welding bolts, nut and valve strainers, including supports complete as in water pipe lines all as per site requirement including testing and commissioning complete all as directed.
Material & labour for taking down the damaged supply air insulation and its Weatherization or weather proofing , cement plastering etc from the height upto 10 meters with necessary scaffolding arrangement , and clearing the site as directed by the Engineering -In-Charge.
Material & Labour for carrying out thermal insulation with 50 mm High density EP Sheet, and prepare the outer surface of the supply & Return air duct and apply bituminous paint, and fixing the EP sheet with industrial quality 40/90 grade bitumen compound, and covering with tar coated hessian cloth plastic strapping around the duct, 20x20 mm wire mesh and 15 mm thick cement plastering strapping mesh around the duct and white wash, the works including the necessary scaffolding arrangement as per site conditions, all as specified as directed by Engr - in-charge.
Material & Labour for cutting and removal of damaged /corroded Supply & Return air duct of various sizes , taking down from height upto 10 meters , with necessary scaffolding arrangements as per the site condition , and supply fabrication , erection, and testing of Supply /return air duct with 22 SWG , G.I sheet including required bolts nuts, gasket packing, cross bracing with angle Iron flanges , and fixing with necessary bolt & nuts, washer all as per the standard all as specified as directed by Engineering -in-charge.
Material & labour for providing the rain water protection for "supply & return air ducts" which are laid out side the air-conditioned hangers along the side of the building wall for total length of the duct by using G.C sheet of 22 SWG , fixing with suitable " J " bolts & nuts rubber washer, on the supporting frame works with 40 x 40 x 6 mm angle Iron, necessary cutting , welding and grouting /anchor fastener as per the site conditions. Note : The work is at the height upto 10 meter from ground level. The G.C sheet fixing shall be as per the standard all as directed by the Engineering - in - charge.
Material & labour for taking down the existing corroded unserviceable portion of MS flat angle iron supports /channels of various size fitted in "supply & return air duct" and supply fabrication , erection including applying 2 coats of synthetic enamel paint over a coat of anticorrosive primer , the work includes the necessary cutting welding , and grouting. Note: The work is to be carried out upto 10 meter height from the ground all as directed by Engineering - in- charge .
Material & Labour for carrying out the inner side cleaning & removing the dust from the ducts of the AC plant by blow out method, opening the grills/ service doors and cleaning by using air compressor/ vacuum cleaner, after cleaning all the open covers / grills shall be fixed in original position with necessary gas kit bolt nuts etc all as directed by Engineer- in- charge .
Material & labour for carry out the repairs of supply & return air grills / diffusers by taking down from the existing position carry out the repairs and fixing back to position all as directed by Engineering - in - charge.
Taking down the complete corroded fresh air damper of the various size at various Air Handling rooms of the AC plant, fabrication, supply and fixing of new dampers as per the existing size with G.I sheet of 20 SWG ,necessary frame works for damper opening & closing leafs with stems and bushes number painting both sides, fresh air intake control leaver with locking arrangements , aluminium painting, fixing at positions, including necessary rectification of the surface on the masonry wall , painting etc. Note : The work includes providing of bird screen on the air intake with required wire mesh , flanges, bolts & nuts all directed by Engr -in- Charge,
Materials & labour for taking down the damaged Thermal insulation of chilled water lines connecting in between the chiller plant room and AHUs of the Various AC plants , and clearing the site and disposing perished thermocol, fiber glass wools, cement plaster debris etc including transporting to GVMC damping yards all as directed by Engineering - in - Charge.
Material & Labour for preparation of Insulation removed surface of the chilled water line of the following sizes for applying the bitumen base paint , anti-corrosive paint at rusted portion of the angle iron supports & clamps / channel supports etc, the chilled water lines are passing through the open air in between the chiller plant and for the plant to AHUs, both chilled water supply & return line. Note : The work included necessary grouting /plastering of the supports in ground/walls as per the site conditions, bushes /small tree cutting /branches all as directed by Engr -in-Charge.
III)150 MM
Material & Labour for carrying out the Thermal insulation with 50 mm thick high thermocol pipe section to the chilled water line by applying industrial quality bitumen compound of 40/90 grade, sealing the joints , covering with tar coated hessian cloth , chicken mesh and 12 mm thick cement plastering and painting all the work as per the site condition, height of the lines are including and upto 5 meters of height all as directed by Engr -In-charge for the following size of chilled water line at various AC plants .
III)150 MM
Material & Labour for taking down including supply & fixing aluminium cladding to the various size of chilled pipe line with 26 SWG Al sheet , fabricating as per site requirements, such as Tee, elbow, and flange and fixing necessary sheet metal screws, making of necessary groove for over lapping joints etc , all as directed by Engr -in-charge.
Material & Labour for taking down the return air boxing between AHU room and AC space , fabrication erection of return air boxing with necessary angle iron channel and MS sheet, Thermal insulation, and weather proofing and painting with bitumen paint on outer surface of the boxing. Note : All the work are to be carried out at the height upto 12 meters from the ground , the work including necessary scaffolding and clearing the site , deposing the debris all as directed by Engineering -in-charge.
Material & Labour for taking down and replacing cooling tower motor base frame ,base plate nuts & bolt with new fittings all as per the existing size and shape all as directed by Engr -in-charge.
Material & Labour for taking down the damaged insulation, S&F new thermal insulation with self adhesive 13 mm thick supply and return air ducting all as directed by Engr -in-charge.
Notes: (i) The contractor shall generally be liable for 24 hours call back services but strictly ensure availability of his responsible representative during the entire period of the contract for attending all types of complaints. He shall promptly be attend and the call back shall not be kept pending for more than 12 hours of intimation to contractor via e-mail/electronic media. The contractor shall obtain the signature of the Eng-in-charge in token of satisfactory completion of defects. (ii) In case of delay in the rectification of any defects is more than 24 hours for minor defects and more than 48 hours for major defects,the GE may at his absolute discretion to impose on the contractor to pay to the department a penalty of Rs 5,000/- for minor defects and Rs 10,000/- for major defects towards inconvenience caused to the users. The decision of the GE as to whether a particular defect occured is minor or major will be the final and binding. The above penalty shall be in addition to the provision made in condition 50 of IAFW-2249.
COOL CONTROL
SRIVALLI ENGINEERS
SRIESWARI ENTERPRISES
VISHAL INTERNATIONAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .