Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L1 | Accepted-AOC lowest agreement executed | |
| 2 | L2₹6.6 L+₹72,000 (12.2%)Rejected-AOC | L2 | Rejected-AOC second lowest | |
| 3 | L3₹7.9 L+₹2.0 L (34.1%)Rejected-Finance | L3 | Rejected-Finance THIRD LOWEST |
Tender Value
₹8.5 L
EMD Value
₹21,200
Closing Date
23 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Assistant Executive Engineer, Minor Irrigation Sub Division , Aluva
desilting of thodu
2020_Irrig_366172_1
AEE/MISDN/ALY/27/ET/2020-21/S
Open Tender
Civil Works - Others
Item Rate
30 days
Chittattukara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,220
Yes
online
₹21,200
Yes
20 Aug 2020
19 Jun 2020
24 Jun 2020
19 Jun 2020
23 Jun 2020
19 Jun 2020
19 Jun 2020 - 22 Jun 2020
30 days
Amount
Scheme 1 at ch 0 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 2 at ch 316 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 3 at ch 632 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 4 at ch 948 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 5 at ch 1264 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 6 at ch 1580 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 7 at ch 1896 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
ANEESH.C.S
TBAS CONSTRUCTIONS
Bidder Name
DAISY JOSE
ANEESH.C.S
TBAS CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_517374.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .