Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BIMAL SINHA SARANI HAKIMPARA SILIGURI SILIGURI HAKIMPARA DARJEELING WEST BENGAL 734001 | JALPAIGURI | WEST BENGAL | 734001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance VILL PO SITALKUCHI DIST COOCHBEHAR PIN 736158 STATE WEST BENGAL | COOCHBEHAR | COOCHBEHAR | WEST BENGAL | 736158 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
4 Nov 2021, 3:00 pmClosed
GE AF Barrackpore
GE AF Barrackpore
Provision of Married Accommodation for DSC personnel (PH-1) at 6 Wing, Air Force Barrackpore.
2021_MES_482688_1
3001/AF/08/E3
Open Tender
Job Works
Works
90 days
GE AF Barrackpore
As per tender documents
2 documents required · 2 mandatory
₹0
Exempted
16 Nov 2021
20 Oct 2021
5 Nov 2021
20 Oct 2021
4 Nov 2021
20 Oct 2021
20 Oct 2021 - 28 Oct 2021
Amount
Boring of 08 Nos bore holes each 10 m deep (5 x 10 + 3x10m = 80m), having 150mm dia through all types of soil excluding rock or rock like hard stratum (N>100) at locations shown at the site including mobilzation & demobilization of staff and equipment for above mentioned woirk.
Refusal as per IS upto 10 mtr collection of undisturbed and disturbed representative.
Laboratory test of disturbed undisturbed soil samples : (a) Determination of field density and moisture content. (b) Classification grain size distribution determination of index properties. (c) Consolidated test. (d) Unconfined compressive strength. (e) Triaxial shear test/direct shear test. (f) Presense of deleterious material. (g) Collection of undisturbed soil samples at each layer or where there is a change of strata. (h) Chemical analysis of soil and ground water that is PH value chloride content and sulphate content. (j) SPT test (N value) at regular interval of 1.5m depthwise & change in strata. (k) Soil classification (grain size distribution of different soil strata. (l) Natural moisture content, degree of saturation, bulk density liquid limit, plastic limit, plasticity index, C & O values and specific gravity test. Note :- 1. The laboratory test of soil be carried out as per IS code following liquid limit, plastic limit, grain. 2. Firm will submit his repot in bounded paper in triplicate. 3. Firm will give the recommendation type of foundation and regarding safe bearing capacity of soil and foundation depth. 4. The work will carry out in the restricted area. 5. The working hours will be 0900 hrs to 1700 hrs. 6. All T&P items and site expenses such as camping transportation etc. should be deemed to be included in the quoted rates. 7. Soil test report containing data, tesst results and recommendations in quaduplicate.
R.B TESTING
PRANTIK ASSOCIATES
Kristi Engineering Services Private Limited
MABCO CONSULTANT
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .