Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC INDEX NO E 53 CWE BHUJ OPP SHRI HALARI BHANUSHALI WADI OUTSIDE KHAMBHALIYA GATE NR PAVAN CHAKKI JAMNAGAR 361005 | JAMNAGAR | JAMNAGAR | GUJARAT | 361005 | L1 | Accepted-AOC L1 AND REASONABLE | |
| 2 | L2₹31.1 L+₹4.9 L (18.9%)Rejected-Finance INS VALSURA JAMNAGAR | JAMNAGAR | GUJARAT | 360520 | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹34.8 L+₹8.7 L (33.1%)Rejected-Finance PARTH B 203 PATEL COLONY STREET NO 11 ROAD NO 3 JAMNAGAR 361 006 GUJARAT | JAMNAGAR | GUJARAT | 361006 | L3 | Rejected-Finance NOT L1 | |
| 4 | L4₹35.8 L+₹9.6 L (36.7%)Rejected-Finance 58 MODERN MARKET NEAR AMBER CINEMA JAMNAGAR | JAMNAGAR | L4 | Rejected-Finance NOT L1 | |
| 5 | L5₹37.6 L+₹11.4 L (43.6%)Rejected-Finance | L5 | Rejected-Finance NOT L1 |
| Sl No | Description | Qty | Unit | M/s Rohit Construction Co. L8 | fakhrie apostrical L4 | SIBS CONTRACTOR L5 | M/s Jagdish Machinery Stores L2 | Rameshwar Enterprise L6 | M/s Balaji Enterprise L3 | Shah Associates L1 | Pooja Enterprise L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Disconnecting the electric induction motor 3 phase, capacity of 20-30 HP, separating pumping set and electric motor, dismantling the elelctric motor for separating the stater and rotor and carring out to work shop for following repairs and after repairs re-assembling with making necessary electrical connection, jointing/ coupling with pump set also making alignment and testing complete for smooth functioning complete all as specified and as directed by Engr-in-charge. | 5 | Each Job | 1,200 ₹6,000 | 1,050 ₹5,250 | 950 ₹4,750 | 800 ₹4,000 | 900 ₹4,500 | 905 ₹4,525 | 700 ₹3,500 Lowest | 1,000 ₹5,000 |
| 1.01 | (a) Cutting out the burnt winding of all the three phases of stator, taking out burnt copper wire from the slots cleaning the slots properly, rewinding the three phases with original gauge, super enameled copper winding wire including insulating materials i.e., varnish, cotton tape, insulating paper, sleeves drying the windings to require temperature, reassembling the rotor and stator after cleaning and dusting of rotor to remove the settled dust particles complete all as directed by Engr-in-charge.(Note: Spare parts will be measured and paid separately under item ) | 4 | Each Job | 16,500 ₹66,000 | 16,000 ₹64,000 | 13,000 ₹52,000 Lowest | 13,000 ₹52,000 Lowest | 15,000 ₹60,000 | 14,100 ₹56,400 | 16,000 ₹64,000 | 14,580 ₹58,320 |
| 1.02 | (b) M & L for replacement of ball bearings of size DE/NDE -6310-2RS all as specified & directed by Engr-in-charge. | 6 | Each | 2,500 ₹15,000 | 2,356 ₹14,136 | 2,300 ₹13,800 | 2,000 ₹12,000 | 2,500 ₹15,000 | 2,520 ₹15,120 | 1,500 ₹9,000 Lowest | 3,000 ₹18,000 |
| 1.03 | (c ) M&L for bearing housing as per existing size and sample all as directed by Engr-in-charge. | 6 | Each | 2,000 ₹12,000 | 1,654 ₹9,924 | 1,200 ₹7,200 | 1,000 ₹6,000 | 1,500 ₹9,000 | 1,520 ₹9,120 | 500 ₹3,000 Lowest | 1,800 ₹10,800 |
| 1.04 | (d) M&L for shafting and turnning at lathe of motor shaft as per existing size and sample all as directed by Engr-in-charge. | 3 | Each | 1,800 ₹5,400 | 1,648 ₹4,944 | 1,500 ₹4,500 | 1,200 ₹3,600 | 1,800 ₹5,400 | 1,520 ₹4,560 | 700 ₹2,100 Lowest | 1,500 ₹4,500 |
| 2.00 | Disconnecting the electric induction motor 3 phase, capacity of 40 HP, separating pumping set and electric motor, dismantling the elelctric motor for separating the stator and rotor and carring out the following repairs and after repairs re-assembling with making necessary electric connection, jointing/ coupling with pumping set, making alignment and testing complete for smooth functioning complete all as specified and as directed by Engr-in-charge.. | 1 | Each Job | 2,500 ₹2,500 | 2,356 ₹2,356 | 3,500 ₹3,500 | 1,300 ₹1,300 | 3,250 ₹3,250 | 2,100 ₹2,100 | 800 ₹800 Lowest | 3,250 ₹3,250 |
| 2.01 | (a) M & L Cutting out the burnt winding of all the three phases of stator, taking out burnt copper wire from the slots cleaning the slots properly, rewinding the three phases with original gauge, super enameled copper winding wire including insulating materials i.e., varnish, cotton tape, insulating paper, sleeves drying the windings to require temperature, reassembling the rotor and stator after cleaning and dusting of rotor to remove the settled dust particles complete all as directed by Engr-in-charge (Note: Spare parts will be measured and paid separately under item ) | 1 | Each Job | 27,000 ₹27,000 | 26,548 ₹26,548 | 24,000 ₹24,000 | 18,000 ₹18,000 Lowest | 25,000 ₹25,000 | 26,000 ₹26,000 | 22,000 ₹22,000 | 28,000 ₹28,000 |
| 2.02 | (b) M & L for replacement of ball bearings of size DE/NDF-6312- 2RS all as specified & directed by Engr-in-charge. | 2 | Each | 2,000 ₹4,000 | 2,356 ₹4,712 | 1,350 ₹2,700 Lowest | 2,000 ₹4,000 | 1,500 ₹3,000 | 2,020 ₹4,040 | 2,000 ₹4,000 | 1,800 ₹3,600 |
| 2.03 | (c ) M&L for bearing housing as per existing size and sample all as directed by Engr-in-charge. | 2 | Each | 2,800 ₹5,600 | 2,445 ₹4,890 | 3,000 ₹6,000 | 1,500 ₹3,000 | 2,900 ₹5,800 | 2,520 ₹5,040 | 800 ₹1,600 Lowest | 2,500 ₹5,000 |
| 2.04 | (d) M&L for shafting and turnning at lathe of motor shaft as per existing size and sample all as directed by Engr-in-charge. | 1 | Each | 2,200 ₹2,200 | 2,000 ₹2,000 | 2,500 ₹2,500 | 1,300 ₹1,300 | 2,400 ₹2,400 | 1,925 ₹1,925 | 1,100 ₹1,100 Lowest | 2,600 ₹2,600 |
Tender Value
₹28 L
EMD Value
₹56,000
Closing Date
4 Apr 2026, 6:00 pmClosed
GE (A) JAMNAGAR
INFANTRY LINE
REPAIR AND MAINT OF CENTRIFUGAL PUMPSETS, ELECTRICAL MOTORS, SUBMERSIBLE PUMP SETS AND ELECTRICAL PANEL OF ELECTRICAL MOTORS INSTALLED AT WATER SUPPLY INSTALLATIONS AND OTHER CONNECTED ALLIED WORKS UNDER GARRISON ENGINEER (ARMY) JAMNAGAR AT INF LINE
2026_MES_756300_1
8216
Open Tender
Civil Works - Water Works
Item Rate
180 days
JAMNAGAR
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE ARMY JAMNAGAR
₹56,000
30 May 2026
14 Mar 2026
6 Apr 2026
15 Mar 2026
4 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting the electric induction motor 3 phase, capacity of 20-30 HP, separating pumping set and electric motor, dismantling the elelctric motor for separating the stater and rotor and carring out to work shop for following repairs and after repairs re-assembling with making necessary electrical connection, jointing/ coupling with pump set also making alignment and testing complete for smooth functioning complete all as specified and as directed by Engr-in-charge. | 5 | Each Job | - | - |
| - | (a) Cutting out the burnt winding of all the three phases of stator, taking out burnt copper wire from the slots cleaning the slots properly, rewinding the three phases with original gauge, super enameled copper winding wire including insulating materials i.e., varnish, cotton tape, insulating paper, sleeves drying the windings to require temperature, reassembling the rotor and stator after cleaning and dusting of rotor to remove the settled dust particles complete all as directed by Engr-in-charge.(Note: Spare parts will be measured and paid separately under item ) | 4 | Each Job | - | - |
| - | (b) M & L for replacement of ball bearings of size DE/NDE -6310-2RS all as specified & directed by Engr-in-charge. | 6 | Each | - | - |
| - | (c ) M&L for bearing housing as per existing size and sample all as directed by Engr-in-charge. | 6 | Each | - | - |
| - | (d) M&L for shafting and turnning at lathe of motor shaft as per existing size and sample all as directed by Engr-in-charge. | 3 | Each | - | - |
| - | Disconnecting the electric induction motor 3 phase, capacity of 40 HP, separating pumping set and electric motor, dismantling the elelctric motor for separating the stator and rotor and carring out the following repairs and after repairs re-assembling with making necessary electric connection, jointing/ coupling with pumping set, making alignment and testing complete for smooth functioning complete all as specified and as directed by Engr-in-charge.. | 1 | Each Job | - | - |
| - | (a) M & L Cutting out the burnt winding of all the three phases of stator, taking out burnt copper wire from the slots cleaning the slots properly, rewinding the three phases with original gauge, super enameled copper winding wire including insulating materials i.e., varnish, cotton tape, insulating paper, sleeves drying the windings to require temperature, reassembling the rotor and stator after cleaning and dusting of rotor to remove the settled dust particles complete all as directed by Engr-in-charge (Note: Spare parts will be measured and paid separately under item ) | 1 | Each Job | - | - |
| - | (b) M & L for replacement of ball bearings of size DE/NDF-6312- 2RS all as specified & directed by Engr-in-charge. | 2 | Each | - | - |
| - | (c ) M&L for bearing housing as per existing size and sample all as directed by Engr-in-charge. | 2 | Each | - | - |
| - | (d) M&L for shafting and turnning at lathe of motor shaft as per existing size and sample all as directed by Engr-in-charge. | 1 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
8216tender.pdf
Tender Documents • 1.32 MB
BOQ_847161.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .