Tender Value
₹1.1 Cr
Closing Date
1 Oct 2026, 5:00 pm2d left
Akhil Elias Varghese
Forest Industries Travancore Limited
Construction of Proposed Building
2026_FITL_872282_1
FIT/CP-30/2026-27
Open Tender
Civil Works - Others
Item Rate
365 days
Thaikkattussery, Ollur
Refer Tender Document
8 documents required · 8 mandatory
₹5,900
Exempted
Forest Industries Travancore Limited
23 Sept 2026
23 Sept 2026
2 Oct 2026
23 Sept 2026
1 Oct 2026
23 Sept 2026
23 Sept 2026 - 26 Sept 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Site Development and Protection works | |||||
| 1.01 | 22.12 Supplying and applying bituminous solution primer on roof and or wall surface at 0.24 litre per sqm. | 375.96 | sqm | - | - |
| 1.02 | 22.5 Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 213 | sqm | - | - |
| 2Reinforced Cement Concrete (RCC) Structural Works | |||||
| 2.01 | 50.5.33.2 Providing and laying in position machine batched and machine mixed design mix M20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note:- Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately. All work above plinth level upto floor V level | 39.12 | cum | - | - |
| 2.02 | 5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 392.92 | sqm | - | - |
| 2.03 | 5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 3,520.8 | kg | - | - |
| 3Masonry Works | |||||
| 3.01 | 50.6.2.2 Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 211.46 | cum | - | - |
| 3.02 | 50.6.2.3 Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 230.78 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1479163.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .