| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 CrAdmitted-Finance | ₹13.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹13.2 CrAdmitted-Finance | ₹13.2 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MIDLAND ENGINEERING AND CONTRACTING COMPANY L1 | PAULOSE K I L2 |
|---|---|---|---|---|---|
| 1.00Jal Jeevan Mission - 2020-21 - WSS to Vadavanur Panchayath in Palakkad district. | |||||
| 1.01 | supplying, laying, testing, commissioning and maintenance of distribution system including Railway crossimg works across Pollachi- Palakkad track and Providing FHTCs(3096 Nos) in Vadavannur Grama panchayath and all other works mentioned in NIT volume 2.(Scope of work). (It is the responsibility of the contractor to complete all works in the scope of work, successfully, trial run and commissioning and maintain the entire work done by him for the maintenance period of 12 months after commissioning and handing over the scheme to KWA. The defect liability period (guarantee period) is 24months from date of commissioning. The quoted amount shall be exclusive of 12 % GST etc. for completion of all works in scope of work as per site conditions) | 1 | No | 13,06,86,001 ₹13.1 Cr | 13,18,96,078 ₹13.2 Cr |
Tender Value
₹12.1 Cr
EMD Value
₹5 L
Closing Date
25 Mar 2022, 3:00 pmClosed
Superintending Engineer
P H Circle, KWA, Kalmandapam, Palakkad
supplying, laying, testing, commissioning and maintenance of distribution system including Railway crossing works across Pollachi- Palakkad track and Providing FHTCs(3096 Nos)
2022_KWA_480409_1
Re-Tender 56/21-22/SE/PHC/PKD
Open Tender
Civil Works - Others
365 days
Vadavannur
As per NIT
3 documents required · 3 mandatory
₹17,700
₹5 L
P H Circle, KWA, Kalmandapam, Palakkad
8 Apr 2022
8 Mar 2022
28 Mar 2022
8 Mar 2022
25 Mar 2022
8 Mar 2022
8 Mar 2022 - 15 Mar 2022
15 Mar 2022
Amount
Jal Jeevan Mission - 2020-21 - WSS to Vadavanur Panchayath in Palakkad district.
supplying, laying, testing, commissioning and maintenance of distribution system including Railway crossimg works across Pollachi- Palakkad track and Providing FHTCs(3096 Nos) in Vadavannur Grama panchayath and all other works mentioned in NIT volume 2.(Scope of work). (It is the responsibility of the contractor to complete all works in the scope of work, successfully, trial run and commissioning and maintain the entire work done by him for the maintenance period of 12 months after commissioning and handing over the scheme to KWA. The defect liability period (guarantee period) is 24months from date of commissioning. The quoted amount shall be exclusive of 12 % GST etc. for completion of all works in scope of work as per site conditions)
PAULOSE K I
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_690206.xls
BOQ • 0.27 MB
Tre56document.pdf
Tender Documents • 9.64 MB
Download all tender documents and submit your bid