| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance | L1 | Accepted-Finance It is L1 bidder so it is accepted | |
| 2 | L2₹6.3 L+₹35,674.35 (6.01%)Rejected-Finance | L2 | Rejected-Finance It is L2 bidder so it is rejected | |
| 3 | L3₹6.5 L+₹56,136 (9.45%)Rejected-Finance HIMACHAL PRADESH HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | L3 | Rejected-Finance It is L3 bidder so it is rejected | |
| 4 | Rejected-Technical S O SH BHAWANI SINGH VPO BHRAIN TEHSIL BHUNTAR DISTT KULLU HP PIN 175125 | KULLU | HIMACHAL PRADESH | 175125 | - | Rejected-Technical Non-Responsive as DD and EMD not submitted physically |
| Sl No | Description | Qty | Unit | Siddarth Negi L2 | Vijay Kumar L3 | BIR SEN NEGI L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulicexcavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 1.94 | Per cum. | 400 ₹776 | 410 ₹795.4 | 380 ₹737.2 Lowest |
| 2.00Centering and shuttering including strutting, propping etc. and removal of form work for : | ||||||
| 2.01 | Columns, Pillars, Piers, Abutments, Posts and Struts | 21.6 | Per sqm. | 700 ₹15,120 | 750 ₹16,200 | 600 ₹12,960 Lowest |
| 3.00Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). | ||||||
| 3.01 | All works above plinth level upto floor V level | 4.37 | Per cum. | 10,000 ₹43,700 | 10,500 ₹45,885 | 9,000 ₹39,330 Lowest |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and
binding all complete above plinth level | 655.5 | Per Kg. | 100 ₹65,550 | 105 ₹68,827.5 | 95 ₹62,272.5 Lowest |
| 5.00 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished welded type tubes | 1,479.88 | Per Kg. | 170 ₹2,51,579.6 | 175 ₹2,58,979 | 160 ₹2,36,780.8 Lowest |
| 6.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting,hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. | 1,971.45 | Per Kg. | 120 ₹2,36,574 | 123 ₹2,42,488.35 | 115 ₹2,26,716.75 Lowest |
| 7.00 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture | 117.2 | Per sqm. | 140 ₹16,408 | 145 ₹16,994 | 130 ₹15,236 Lowest |
Tender Value
₹4.6 L
EMD Value
₹11,500
Closing Date
31 Oct 2025, 10:30 amClosed
Executive Officer Municipal Council Manali
Municipal Council Manali
C/O foot over bridge near HRTC bus stand manali M.C. Manali Distt. Kullu ( H.P.)
2025_UDDHP_117607_1
No.MCM.E-Tender/2025-1881-83 Dt.09-10-25
Open Tender
Civil Works
Item Rate
120 days
Manali
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Executive Officer Municipal Council Manali
₹11,500
1 Dec 2025
21 Oct 2025
31 Oct 2025
21 Oct 2025
31 Oct 2025
21 Oct 2025
21 Oct 2025 - 31 Oct 2025
Amount
Excavation work by mechanical means (Hydraulicexcavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
Centering and shuttering including strutting, propping etc. and removal of form work for :
Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
All works above plinth level upto floor V level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished welded type tubes
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting,hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
Siddarth Negi (BID ID -576652)
Vijay Kumar (BID ID -576678)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_172001.xls
BOQ • 0.27 MB
SBD.pdf
Tender Documents • 3.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .