Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | ₹16.8 L | L1 | Accepted-AOC AGREEMENT EXECUTED |
| 2 | L2₹17.4 L+₹60,871.97 (3.63%)Rejected-AOC | ₹17.4 L+₹60,871.97 (3.63%) | L2 | Rejected-AOC NOT ACCCEPTED |
| Sl No | Description | Qty | Unit | Sunil L1 | SUDHEER P P L2 |
|---|---|---|---|---|---|
| 1.00PLAY GROUND PREPARING PART 2 | |||||
| 1.00 | OD285866/2025-2026:Engaging Hydraulic excavator for Levelling the site | 20 | hour | 1,468.06 ₹29,361.2 Lowest | 1,500 ₹30,000 |
| 1.00 | OD285887/2025-2026:Filling with contractor's own earth ( excluding rock) in Low lying areas in layers , consolidating
deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction
of site Engineer-in-charge | 407 | cum | 705.42 ₹2,87,105.94 Lowest | 710 ₹2,88,970 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 21.06 | cum | 359.72 ₹7,575.7 Lowest | 374.76 ₹7,892.45 |
| 1.00 | OD296026/2025-2026:
DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 21.06 | cum | 2,967.19 ₹62,489.02 Lowest | 3,000 ₹63,180 |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 4,378.02 | kg | 228.5 ₹10,00,377.57 Lowest | 240.57 ₹10,53,220.27 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 14.04 | cum | 8,364.57 ₹1,17,438.56 Lowest | 8,365 ₹1,17,444.6 |
| 1.01 | OD296257/2025-2026:Supplying and fixing HDPE sports ground net around the ground ( frame work to be paid separately) including all labor charges etc | 1,104 | sqm | 127.33 ₹1,40,572.32 Lowest | 130 ₹1,43,520 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 198.6 | sqm | 164.86 ₹32,741.2 Lowest | 172.74 ₹34,306.16 |
Tender Value
₹16.9 L
EMD Value
₹42,208
Closing Date
6 Oct 2025, 4:00 pmClosed
AE
CHAVAKKAD MUNICIPALITY
PLAYGROUND PREPARATION IN PARAPPILTHAZHAM WARD 27 - COMPLETION - PART 2-PRO.NO.416/26
2025_LSGD_801321_1
416/25/AE/CKDMNLTY
Open Tender
Civil Works - Others
Item Rate
270 days
CHAVAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹42,208
17 Jul 2026
25 Sept 2025
7 Oct 2025
25 Sept 2025
6 Oct 2025
25 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1330599.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .