Loading…
Loading…
Tender Value
₹1.7 L
EMD Value
₹1,735
Closing Date
15 Jun 2026, 10:00 am7d left
Add. Superintending Engineer
o/o Add. Superintending Engineer, Electrical Division, HPSEBL, Baijnath
Erection, testing, commissioning for providing LT extension for prov. 1- phase LT line connection for pump house constructed under HPSHIVA project at Agojar cluster wrt. Dev. Block Panchrukhi from ext. 11/0.4 kv, 63 kVA under E-section Rakar UESD PRK
2026_HPSEB_135980_1
BED-03/2026-27
Open Tender
Electrical Works
60 days
Panchrukhi
refer tender docs
3 documents required · 3 mandatory
₹590
₹1,735
6 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | LT extension at Agojar cluster | - | - | - | - |
| 1.02 | S/T POLE 9 Mtr long | 4 | No. | 12,510 | ₹50,040 |
| 1.03 | RCC MUFF OF 2000 mm length with concrete filling | 4 | No. | 1,622 | ₹6,488 |
| 1.04 | Shackle insulator 16 KN | 20 | No. | 38 | ₹760 |
| 1.05 | D-iron (U-CLAMPS) WITH NUT & BOLTS | 20 | No. | 96 | ₹1,920 |
| 1.06 | CHANNEL IRON (75X40X5) (LENGTH -1.50 MTR.+0.2 MTR) | 1 | No. | 1,311 | ₹1,311 |
| 1.07 | Earth knob | 4 | No. | 52 | ₹208 |
| 1.08 | LT Stay set (i/c stay clamp) | 4 | No. | 984 | ₹3,936 |
| 1.09 | Stay Wire7/3.15mm (6.0Kg per Stay Set) | 24 | Kg. | 96 | ₹2,304 |
| 1.1 | Full clamp( 1 No. for stay set) | 3 | No. | 190 | ₹570 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_201303.xls
BOQ • 0.27 MB
BID-03.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid