| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAdmitted-Finance | ₹7.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.8 Cr+₹40.7 L (5.51%)Admitted-Finance | ₹7.8 Cr+₹40.7 L (5.51%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 Cr+₹1.5 Cr (19.7%)Admitted-Finance | ₹8.8 Cr+₹1.5 Cr (19.7%) | L3 | Admitted-Finance |
| 4 | L4₹9.1 Cr+₹1.7 Cr (22.9%)Admitted-Finance | ₹9.1 Cr+₹1.7 Cr (22.9%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive as per CL.Section-2-4.4A(b) |
| Sl No | Description | Qty | Unit | M/s R. M. Construction L3 | M/S JITENDRA KUMAR SINGH L2 | M/s Jagdhatri Prasad Singh L4 | AJIT KUMAR DWIVEDI L1 |
|---|---|---|---|---|---|---|---|
| 1.001. CONSTRUCTION OF HL BRIDGE AT CH-1200 ON DINA MAHUWATOLI TO BELTOLI, PACKAGE NO. JH10MARS104, LENGTH-15.110M | |||||||
| 2.00 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means Depth upto 3m | 516.16 | cum | 325 ₹1,67,752 | 280.2 ₹1,44,628.03 | 337.99 ₹1,74,456.92 | 274.76 ₹1,41,820.12 Lowest |
| 3.00 | Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means | 515.63 | cum | 400 ₹2,06,252 | 350.25 ₹1,80,599.41 | 422.49 ₹2,17,848.52 | 343.45 ₹1,77,093.12 Lowest |
| 4.00 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling | 38.14 | cum | 5,297.07 ₹2,02,030.25 | 4,502.51 ₹1,71,725.73 | 5,431.09 ₹2,07,141.77 | 4,415.11 ₹1,68,392.3 Lowest |
| 5.00 | PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.) | 15.06 | cum | 5,610.39 ₹84,492.47 | 5,049.35 ₹76,043.21 | 5,752.33 ₹86,630.09 | 4,676.26 ₹70,424.48 Lowest |
| 6.00 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using batching plant,transit mixer & Concrete pump) | 321.5 | cum | 6,400 ₹20,57,600 | 5,478.9 ₹17,61,466.35 | 6,608.84 ₹21,24,742.06 | 5,372.54 ₹17,27,271.61 Lowest |
| 7.00 | Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications | 30.28 | Tonne | 94,141.42 ₹28,50,602.2 | 84,727.28 ₹25,65,542.04 | 96,523.2 ₹29,22,722.5 | 78,466.87 ₹23,75,976.82 Lowest |
| 8.00 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification | 64.03 | cum | 886.73 ₹56,777.32 | 798.06 ₹51,099.78 | 909.16 ₹58,213.51 | 739.09 ₹47,323.93 Lowest |
| 9.00 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M25 using batching plant , transit mixer & concrete pump) Height Upto 5m | 77.8 | cum | 6,754.82 ₹5,25,525 | 5,741.6 ₹4,46,696.48 | 6,925.72 ₹5,38,821.02 | 5,630.14 ₹4,38,024.89 Lowest |
| 10.00 | Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification. | 326 | nos | 114.8 ₹37,424.8 | 103.32 ₹33,682.32 | 117.7 ₹38,370.2 | 95.69 ₹31,194.94 Lowest |
Tender Value
₹8.9 Cr
EMD Value
₹19 L
Closing Date
12 Jun 2026, 5:00 pmClosed
ENGINEER IN CHIEF
3rd Floor, FFP Building, Dhurwa, Ranchi, Jharkhand 834002
Construction and Maintenance of Roads and LSBs
2026_CEJHR_147749_42
NIT-10_PMJANMAN-BRIDGE
Open Tender
Civil - Roads and Bridges
Item Rate
545 days
GUMLA
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹19 L
1 Sept 2026
21 May 2026
12 Jun 2026
21 May 2026
12 Jun 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. CONSTRUCTION OF HL BRIDGE AT CH-1200 ON DINA MAHUWATOLI TO BELTOLI, PACKAGE NO. JH10MARS104, LENGTH-15.110M | - | - | - | - |
| 2 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means Depth upto 3m | 516.16 | cum | 329.65 | ₹1,70,152.14 |
| 3 | Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means | 515.63 | cum | 412.06 | ₹2,12,470.5 |
| 4 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling | 38.14 | cum | 5,297.07 | ₹2,02,030.25 |
| 5 | PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.) | 15.06 | cum | 5,610.39 | ₹84,492.47 |
| 6 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using batching plant,transit mixer & Concrete pump) | 321.5 | cum | 6,445.76 | ₹20,72,311.84 |
| 7 | Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications | 30.28 | Tonne | 94,141.42 | ₹28,50,602.2 |
| 8 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification | 64.03 | cum | 886.73 | ₹56,777.32 |
| 9 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M25 using batching plant , transit mixer & concrete pump) Height Upto 5m | 77.8 | cum | 6,754.82 | ₹5,25,525 |
| 10 | Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification. | 326 | nos | 114.8 | ₹37,424.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.01 MB
BOQ_230716.xls
BOQ • 0.45 MB
JH-10-PMJANMAN-III-BR-GUM-02.pdf
Tender Documents • 12.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .