| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87,205.84Accepted-Finance | ₹87,205.84 | L1 | Accepted-Finance Accepted since it is re-tender |
| Sl No | Description | Qty | Unit | Jincy Mathew L1 |
|---|---|---|---|---|
| 1.00 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with waterproofing cement compound @ 0.253 kg/sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 99.22 | sqm | 550 ₹54,571 |
| 2.00 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On concrete work | 99.22 | sqm | 175 ₹17,363.50 |
| 3.00 | Labor engaged for cleaning Roof top and open blocked drainage pipes. Coolie | 7 | each | 1,082.18 ₹7,575.26 |
| 4.00 | Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska: With modular brick tiles | 42 | sqm | 145.43 ₹6,108.06 |
| 5.00 | Providing and fixing false ceiling with 7.5 mm thick PVC plain panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete (aluminium frame work shall be paid separately) | 2 | sqm | 794.01 ₹1,588.02 |
Tender Value
Refer Docs
EMD Value
₹2,900
Closing Date
22 Jan 2026, 4:00 pmClosed
University Engineer
Office of the University Engineer
Providing waterproofing on the roof top of Library at School of Social Sciences at Pullarikunnu Campus
2025_MGU_823099_2
UE/DB/E19/2025-2026
Open Tender
Civil Works - Others
Pullarikunnu
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Yes
₹2,900
Yes
28 Jan 2026
12 Jan 2026
27 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with waterproofing cement compound @ 0.253 kg/sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured)
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On concrete work
Labor engaged for cleaning Roof top and open blocked drainage pipes. Coolie
Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska: With modular brick tiles
Providing and fixing false ceiling with 7.5 mm thick PVC plain panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete (aluminium frame work shall be paid separately)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Biddocument.pdf
Tender Documents • 1.96 MB
PreliminaryAgreement.pdf
Tender Documents • 0.28 MB
NIT1.pdf
Additional Documents • 0.02 MB
BOQ_1387866.xls
BOQ • 0.23 MB
ePaymentform.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid