Executive Engineer Panchayat R&B Division BOTAD
Reparing Work of Aaganvadi centre at Various villages of Ranpur taluka (Package no. BTD/ CDP /Pac 7 / 2025-26), Dist. Botad. (Nagnesh, Vejalka, Dharpipla, Gunda,Aniyali Kathi,Alav,Ranpur)
285012
nivida 19 secound try
Open
Civil Works - Buildings
Works
Botad
5 documents required · 0 mandatory · 5 optional
₹900
Yes
Executive Engineer Panchayat R&B Division BOTAD
₹9,000
Yes
10 Mar 2026
10 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
Name of Work :- Reparing Work of Aaganvadi centre at Various villages of Ranpur taluka
(Package no. BTD/ CDP /Pac 7 / 2025-26), Dist. Botad. (Nagnesh, Vejalka,
Dharpipla, Gunda,Aniyali Kathi,Alav,Ranpur)
Bill of Quantities
Memorandum showing items of works to be carried out
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
1 12.070 Cum Excavation for foundation upto 1.5 117.08 Rupees One One
M depth including sorting out and Hundred Cubic
stacking of useful materials and Seventeen and metre
disposingof the excavated stuff upto Paise Eight only
all lead. (A). Loos or Soft Soil
2 21.720 Cum Excavation for foundation upto 1.50 149.67 Rupees One One
M.depth including sorting out Hundred Forty Cubic
&stacking of useful materials i.e. Nine and Paise metre
dispositing the excavated stuff up to Sixty Seven only
all lead (b)Dense or Hard soil.
3 3.040 Cum Excavation for Pipeline trenches 89.89 Rupees One
Excavation for pipe line trenches for Eighty Nine and Cubic
water supply, sewerage line, Paise Eighty Nine metre
manhole etc. all with shoring and only
struting if required as per required
gradient and line including safety
provisions using site rails and
stacking excavated stuff including up
to all required lead cleaning the site
etc. complete for all lifts and strata
as specified. A)In all sorts of soil and
4 0.550 Cum Providing and laying cement 2680.21 Rupees Two One
concrete 1:4:8 (1 cement, 4sand,8 Thousand Six Cubic
Hundred Eighty metre
machine crushed stone aggregates
mm.Nominal size)and curing and Paise Twenty
complete, excluding cost of
formwork in(a) Foundation and
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
5 1.070 Cum Providing and laying.C.C. 1:5:10 (1- 2517.44 Rupees Two One
Cement: 5-Course sand :10- Brick Thousand Five Cubic
aggregate 40mm. Nominal size) i.e.
curring comp. Excl. cost of form Seventeen and
Paise Forty Four
work for foundation and plinth.
6 2.760 Cum Providing and laying controlled C.C. 4017.66 Rupees Four One
M-200 and curing complete Thousand Cubic
excluding the cost of formwork and Seventeen and metre
reinforcement for reinforced Paise Sixty Six
concrete work in (A) foundation,
footing Base of column and mass
7 2.860 Cum Brick work using common burnt clay 4051.78 Rupees Four One
building bricks having crushing Thousand Fifty Cubic
strength not less than 35 kg./Sq.Cm. One and Paise metre
in foundation and plinth in Cement Seventy Eight only
Mortar 1:6 (1- Cement : 6 -fine sand)
(B) Conventional
8 8.990 Cum Uncoursed rubble masonary with 2500.01 Rupees Two One
hard stone of approved quality in Thousand Five Cubic
foundation and plinth in cement Hundred and metre
mortar1:6(1 cement:6 coarse sand) Paise One only
including levelling up etc.complete.
9 0.450 Cum Providing and laying ordinary 4263.28 Rupees Four One
cement concrete M-150 and curing Thousand Two Cubic
complete including cost of form Hundred Sixty metre
work and reinforcement for Three and Paise
Twenty Eight only
reinforced cement concrete work in
footing and column upto plinth.
10 0.810 Cum Providing and laying cement 4046.21 Rupees Four One
concrete 1:3:6 (1- Cement: 3- Coarse Thousand Forty Cubic
sand: 6- crushed stone aggregates 20 Six and Paise metre
mm nominal size) and curing Twenty One only
complete including cost of formwork
in (A) Wall Caps / Coping
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
11 0.420 Cum Providing and laying controlled 7665.60 Rupees Seven One
providing and laying ordinary Thousand Six Cubic
cement concrete 1:2:4 and finishing Hundred Sixty metre
smooth with curing etc. comp.i/c the Five and Paise
cost of form work but e/c the cost of
reinforcement for R.C.C. work in (A)
BEAMS (iii) Having cross- sectional
area more than 0.080 Sq.m and upto
12 3.500 Cum Providing and laying controlled 7662.59 Rupees Seven One
cement concrete M-200 curing Thousand Six Cubic
Hundred Sixty metre
complete in cluding cost of
formwork but excluding cost of Two and Paise
Fifty Nine only
reinforcement for reinforced
concrete work in Beam up to all
13 1.110 Cum Providing and laying ordinary 6888.15 Rupees Six One
cement concrete 1:2:4 and finishing Thousand Eight Cubic
smooth wih curing etc.comp.i/c the Hundred Eighty metre
cost of form work but excluding the Eight and Paise
cost of reinforcement for R.C.C work
in (IV) Slabs having more than
cm and upto 13 cm thickness
14 6.240 Cum Providng and laying controlled 7797.19 Rupees Seven One
cement concrete M-200 and curing Thousand Seven Cubic
complete including the cosr of form Hundred Ninety metre
work but excluding the cost of Seven and Paise
reinforcement for R.C.C work in
Slab up to all Floor level
15 5.380 Cum Brick work using common burnt clay 4526.81 Rupees Four One
building bricks having crushing Thousand Five Cubic
strength not less than 35 kg./Sq.Cm. Hundred Twenty metre
in superstructure above plinth level Six and Paise
Eighty One only
upto all floor level in Cement
Mortar 1:6 (1- Cement : 6 -fine sand)
(B) Conventional
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
16 12.770 Cum White Stone Bela mesonry block in 6170.29 Rupees Six One
course in superstructure with stone Thousand One Cubic
of approved quality in Lime Mortar Hundred Seventy metre
1:6 (1-Cement: 6- course sand) and Paise Twenty
including packing the joints etc.
17 854.470 Kg Providing TMT Bar FE 500D 76.08 Rupees One
reinforcement for R.C.C. work Seventy Six and Kilogra
including bending, binding and Paise Eight only m
placing in position complete for all
18 32.700 Sqm Providing 15mm thick cement plaster 246.05 Rupees Two One
in single coat on Rough (Similar)side Hundred Forty Six Squere
of single or half brick walls for and Paise Five metre
interior plastering upto all floor level only
and finished even and smooth in (i)
Cement mortar 1:3 (1-cement:3-
19 133.120 Sqm Providing 10mm thick cement plaster 138.71 Rupees One One
in single coat on brick/concrete walls Hundred Thirty Squere
for interior plastering upto floor two Eight and Paise metre
level and finished even and smooth Seventy One only
in (i)Cement mortar 1:3 (1- cement:3-
20 2.280 Sqm Providing and laying polished Kota 971.95 Rupees Nine One
stone slab flooring over 20mm Hundred Seventy Squere
(Average) thick base of cement One and Paise metre
mortar 1:6 (1-cement: 6-coarse sand) Ninety Five only
or L.M. 1.1.5 (1-Lime putty:1.5 -
coarse sand) laid over and jointed
with grey cement slurry mixed with
pigment to match the shade of slab
including rubbing and polishing etc.
complete. (A) 25mm thick
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
21 127.630 Sqm Providing and laying Vitrified tiles 8 1073.13 Rupees One One
to 10 mm thick, 24" x 24" in flooring Thousand Squere
treads of steps and landing laid on a Seventy Three metre
bed of 12mm thick cement mortar and Paise Thirteen
1:3 (1-cement: 3- coarse sand)
finishing with flush pointing in white
22 12.770 Sqm P & L 24" x 24" vitrified 8 mm thick 1139.79 Rupees One One
tile flooring over 20 mm (average) Thousand One Squere
base of cement mortar 1:6 (1 cement: Hundred Thirty metre
6 coarse sand) on new surface or Nine and Paise
Seventy Nine only
fixing on existing flooring by
adhesive material including
dismentaling of existing flooring and
jointed with color cement slurry
including finised with flush pointing
& cleaning the surface etc. complete
for light shade
23 6.500 Sqm Providing and laying white glazed 827.19 Rupees Eight One
tiles 6mm thick in flooring treads of Hundred Twenty Squere
steps and landing laid on a bed of Seven and Paise metre
12mm thick cement mortar 1:3 (1- Ninteen only
cement : 3-coarse sand ) finishing
with flush pointing in white cement.
24 143.020 Sqm Providing and laying broken chine 747.29 Rupees Seven One
mosaic flooring for terrace using 12 Hundred Forty Squere
mm to 20 mm broken pieces of Seven and Paise metre
glazed tiles to be laid over cement Twenty Eight only
mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out
upto surface using white cement
including rounding off junctions and
extending them upto 15 cm along the
wall,clearing with water and oxalic
acid etc. as directed.
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
25 11.580 Sqm Providing and fixing window having 1713.70 Rupees One One
extruded aluminum Colour anodized Thousand Seven Squere
section frame main outer size 63.50 x Hundred Thirteen metre
38.10 x1.95 mm,@ Wt 1.094 Kg / and Paise Seventy
Rmt, horizontal two track member
size 61.85 mm x 31.75 mm x
vertical member of size 61.85 mm x
Kg/mt with sliding shutters of
horizontal member size 40mm x
0.456Kg/mt, vertical membe of size
0.456Kg/mt, @Wt. 0.457 Kg/mt with
5 mm thick transparent bronze colour
tinted float glass with powder coated
aluminum fittings and fixtures and
trnsparent silicon sealant glass fixing
to frame as per details etc complete
26 11.240 Sqm Providing and fixing 35 mm thick 3773.84 Rupees Three One
shutters for Doors, windows and Thousand Seven Squere
Hundred Seventy metre
clearstory windows including
blackenamelled M.S. butt hinges Three and Paise
Eighty Four only
with necessary screws. (A) Indian
teak wood. (i) Fully Panelled.
27 527.340 Sqm Distempering (Two coats) with oil 72.07 Rupees One
bound distemper of approved brand Seventy Two and Squere
and manufacture and of required Paise Seven only metre
shade on wall surface to give an even
shade over and including a priming
coat with distemper primer of
approved brand and manufacture
after thoroughly brushing the surface
free from mortar dropping and other
foreign matter and also including
preparing the surface even and
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
28 527.340 Sqm Wall painting (two coats) with 78.90 Rupees One
plastic emulsion paint of approved Seventy Eight and Squere
brand and manufacture on Paise Ninety only metre
undecorated wall surface to give an
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered smooth
29 2.000 No Providing and fixing water closet 1240.49 Rupees One One
squatting Pan (Indian type W.C. Pan) Thousand Two Number
size 580mm (Earthwork, bed Hundred Forty
concrete, foot reste and trap to be and Paise Forty
measured and paid for separately)
(A) Vitreous China. (I) Long pattern,
30 3000.000 Lit Providing erecting and fixing double 3.95 Rupees Three One
coated ISI water tank of required and Paise Ninety Litre
capacity each with all necessary Five only
fittings and connection etc. complete
31 100.000 Rm Providing and fixing to wall ceiling 101.49 Rupees One One
and floor 6.0 Kg. F/Cm2 working Hundred One and Running
pressure poluthene pipes of the Paise Forty Nine metre
following outside Dia. Low densidy, only
complete with special falnge
compression type fittings, wall
clipsetc. including making good the
wall ceiling and floor. (B) 25mm
32 15.000 Rm P. V. C. Pipes Providing and 191.90 Rupees One One
supplying in standard length ISI Hundred Ninety Running
mark rigid unplasticised PVC pipes One and Paise metre
suitable for potable water with ring Ninety only
fit joint including cost of rings, as
per IS specification no. 4985/1988
including all local and central taxes,
transportation, freight charges,
octroi, inspection charges, loading,
unloading, conveyance to the
departmental stores and including
cost of jointing meterial etc.
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
33 15.000 Rm L, L & J PVC/uPVC/cPVC pipes 17.17 Rupees One
and specials. Lowering, laying, Seventeen and Running
fixing and jointing Paise Seventeen metre
PVC/uPVC/cPVC pipes and specials only
of following class and diameter
including cost of conveyance from
stores to site of works including cost
of labour, material, cement solvent,
giving satisfactory hydraulic testing
as per ISI code.
34 2.940 Rm Refilling of pipeline trenches 17.17 Rupees One
Refilling the pipeline trenches incl. Seventeen and Running
ramming, watering, consolidating Paise Seventeen metre
desposal of surplus stuff as directed only
within a radius of all lead
35 7.000 No Providing and fixing 0.45*0.60 size
Rupees Five One
marble year plate etc. Hundred Five and Number
36 7.410 Sqm Pro. /Fix with windows with frame 3902.64 Rupees Three One
40x40x5mm. iron angle and B.G. 16 Thousand Nine Squere
mm. sheet plates with 16mm. dia Hundred Two and metre
hard hinges handles, stopper and Paise Sixty Four
locking arrangment etc. comp. steel
welded is built up section cutting
hoisiting, finishing in two cost of oil
painting over coat of primer coat etc.
37 2.400 Sqm Pro. /Fix with steel door having of 2985.56 Rupees Two One
40x40x5mm. iron angle shutterframe Thousand Nine Squere
of 30*30*5mm. orpan angle B.G. 18 Hundred Eighty metre
gauge plates with hunges, handles, Five and Paise
stopper and locking arrangment etc.
comp. steel welded is built up
section of oil painting over coat of
primer coat etc. comp
Dismentled Material Credit Rs.
will be deducted from 1 St R.A.
Rupees Eight Lakh Fifteen Thousand Six Hundred Eight and Paise Ninety One only Total
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
Ite Quanties Estimated Item of work Estimated Rates Unit Total amount
m but may be more or according to
No. less. estimated
In Figure In Words.
I \ We am \ are willing to carry out the work at ……………………… % above\bellow percent (
Should be written in figures and words ) of the estimated rate mentioned above. Amount of My \ Our
tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Specification_Part1.pdf
Specification_Part2.pdf
Specification_Part3.pdf
Specification_Part4.pdf
Specification_Part5_Part1.pdf
Specification_Part5_Part2.pdf
SBD.pdf
Sch B DTP pac 07.pdf
3 Test Schedule pack 7.pdf
6.0 Qt sheet pack 7.pdf
Specification_Part1 pack7.pdf
Specification_Part2 pack 7.pdf
Specification_Part3_Part1 pack 7.pdf
Specification_Part3_Part2_Part1 pack 7.pdf
Specification_Part3_Part2_Part2 pack 7.pdf
Specification_Part3_Part2_Part3 pack 7.pdf
Specification_Part3_Part3 pack 7.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .