Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹48.8 Cr
EMD Value
₹5 L
Closing Date
26 Oct 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
PH CIRCLE, KWA, MALAPPURAM
JJM - CWSS TO WANDOOR TUVVUR KALIKAVU KARUVARAKUNDU AND EDAPPATTA GPs -PACKAGE II - CONSTRUCTION OF 34MLD WTP CW SUMP PUMP HOUSE AND CLORINATION UNIT TRANSFORMER ROOM STORE ROOM AND SCADA UNIT CWPM BOOSTER STATION ELECTRO MECHANICAL works -GENERAL
2023_KWA_594865_2
SE/PHC/MPM/83/2023-24
Open Tender
Civil Works - Water Works
Item Rate
300 days
Wandoor
Refer tender documents
8 documents required · 8 mandatory
₹16,540
₹5 L
PH CIRCLE, KWA, MALAPPURAM
26 Oct 2023
6 Oct 2023
27 Oct 2023
6 Oct 2023
26 Oct 2023
20 Oct 2023
20 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A1 - Construction of Aerator | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 61.87 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 24.75 | cum | - | - |
| 1.003 | 4.20.1.2:Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS:9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Note : 1) Excess /less cement used than specified in this item is payble / recoverable separately.M-15 grade plain cement concrete (cement content considered @ 220 kg/cum) | 4.95 | cum | - | - |
| 1.004 | 5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level | 17.48 | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,747.9 | kilogram | - | - |
| 1.006 | 5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level | 53.19 | cum | - | - |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 5,319.3 | kg | - | - |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 13.5 | sqm | - | - |
| 1.009 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 70.53 | sqm | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NITmerged.pdf
Tender Notice • 10.00 MB
BOQ_911597.xls
BOQ Document • 0.68 MB
130987170.pdf
Tender Document • 0.69 MB
q1toq8new.pdf
Tender Document • 0.19 MB
130987172.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .