Loading…
Loading…
Tender Value
₹71.0 L
EMD Value
₹71,000
Closing Date
18 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer (R & B) Division, Bharuch
Construction of Internal Campus Drainage Line at Survey Bhavan at Bharuch (DILR District Inspector Land Records) Dist. Bharuch(2nd Attempt)
304079
01 of 2026-27
Open
Civil Works - Buildings
Bharuch
1 document required · 1 mandatory
₹2,400
Executive Engineer, Bharuch (R&B) Division, Bharuch
₹71,000
10 May 2026
10 May 2026
10 May 2026
18 May 2026
10 May 2026
No figures
1 Excavation for foundation upto 1.5 m depth including 1288.00 cum 117.08
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead.(A)
Loose or soft soil.
2 Filling in foundation and plinth with brick Bats Chhara in 171.72 cum 600.56
layers of 20cm. thickness including watering, remming
and consolidating etc. complete.
3 Providing and laying cement concrete 1:3:6 (1-Cement : 171.72 cum 2965.76
3- coarse sand : 6- hand broken stone aggregates
mmnominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
4 Providing and laying controlled cement concrete M.250 190.80 cum 4355.25
and curing complete including the cost of formwork and
reinforcement for reinforced concrete work in (B) Walls,
from top of foundation level upto floor two level
5 Providing and laying controlled cement concrete M-250 280.48 cum 4331.20
and curing complete including the cost of form work but
excluding the cost of reinforcement for reinforced
concrete work in Slab.
6 Providing TMT Bar FE 500D reinforcement for R.C.C. 42415.00 kg 76.21
work including bending, binding and placing in position
complete upto floor two level
7 Providing formwork of ordinary timber planking so as to 1908.00 Sqmt 232.25
give a rough finish including centering shuttering
strutting and propping etc. height of propping and
centering below upporting floor to ceiling not exceeding
4 M. and removal of the same for in situ reinforced
concrete and plain concrete work in. (C) Vertical surface
such as walls (any thickness) partitions and the like
including attached buttresses & string course & the like.
8 Providing form work of ordinary timber planking so as 477.00 Sqmt 254.52
to give a rough finish including centering. Shuttering
strutting and propping etc. height of propping and
centering below supporing floor to ceiling not ex-
exceeding 4M and removal of the same for in including
reinforced concrete and plain concrete work in : (B) Flat
surfaces such as sofits of slabs landings and the like
Item Rate In
Description of Item Quantity Unit Amount
No figures
9 Providing and fixing pre-cast concrete kerb stone of gray 954.00 rmt 361.64
cement based concrete block 30cm length,30cm
heightand 15cm thick of M250 grade concret as per
approved design and including excavation for fixing in
proper line and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete.
10 Providing and fixing M.S. grills of required pattern to 1431.00 kg 102.62
wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round
bars with round headed bolts and nuts or by screws (A)
Plain Grill.
Total Rs.
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in figures and
words) of the estimated rate mentioned above. Amount of my /our
Tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
1 Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
4 there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
City ( R & B ) Sub Division Bharuch ( R & B ) Division
Bharuch Bharuch
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Internal Drain Survey Bhavan Bharuch.pdf
BOQ Internal Drain Survey Bhavan Bharuch.pdf
Specification Internal Drain Survey Bhavan Bharuch.pdf
Scope of work Internal Drain Survey Bhavan Bharuch.pdf
Building-Specification Booklet.pdf
GRs - Buildings.pdf
Download all tender documents and submit your bid