Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance HN12 GALI NO 4 KUSHAK NO 2 KADIPUR DELHI 36 | 36 | L1 | Accepted-Finance ok | |
| 2 | L2₹4.7 L+₹20,480 (4.57%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹4.8 L+₹29,552 (6.60%)Accepted-Finance 975 E LOHIYA GALI NO 4 BABARPUR DELHI 110032 | DELHI | SHAHDARA | DELHI | 110032 | L3 | Accepted-Finance ok | |
| 4 | L4₹5.6 L+₹1.2 L (26.1%)Accepted-Finance B 3 105 PASCHIM VIHAR NEW DELHI 110063 | WEST | DELHI | 110063 | L4 | Accepted-Finance ok | |
| 5 | L5₹6.5 L+₹2.0 L (44.5%)Accepted-Finance 2628 KUCHA CHALAN DARYA GANJ NEW DELHI 110002 | CENTRAL | DELHI | 110002 | L5 | Accepted-Finance ok |
Tender Value
₹7.3 L
EMD Value
₹14,632
Closing Date
16 Mar 2020, 3:00 pmClosed
Executive Engineer(E)
Executive Engineer (E) Players Building and East PWD (M253), Delhi Sachivalaya IG Stadium Complex New Delhi
RMO Air Conditioning system installed at Delhi Sachivalaya New Delhi (SH Comprehensive AMC of Window split cassette tower package and Ductable Air Conditioners and cleaning of air terminals)
2020_PWD_189237_1
92/EE(E)/PWD M-253/2019-20Recall
Open Tender
Electrical Works
Works
365 days
Delhi Sachivalaya
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹14,632
19 Mar 2020
6 Mar 2020
16 Mar 2020
6 Mar 2020
16 Mar 2020
6 Mar 2020
Amount
Complete servicing of floor/ceiling mounted AHUs at various floor of Delhi Sachivalaya Building, New delhi i/c coil surface cleaning with cleaning chemicals, water washing with high pressure pump, cleaning of AHU blower, drain pipe, drain pan and filter with chemicals, blower and motor belt alignment checking, healthy operation of three way/two way valve function, healthy operation of all safety controls, greasing and oiling of movable parts, testing and commissioning etc. complete as required.
Complete servicing of Split/wndow/cassette /Tower type AC units (i/c inverter technology based AC units)/Hydronic Fan Coil Unit of capacity up to 4 TR by removing the indoor unit cover, cleaning the filter with brush and water, cleaning the evaporator coil with blower, checking all electrical connections from power socket outlet to out door & indoor unit, checking the drain system for proper flow of drain water, dry & wet cleaning of condenser coil etc. complete as required.
Complete servicing of 8.5 TR / 11 TR package, ductable air conditioners by removing the indoor unit cover/duct/flange, cleaning the filter with brush and water, cleaning the evaporator coil with blower, checking all electrical connections from power socket outlet to out door & indoor unit, checking the drain system for proper flow of drain water, dry & wet cleaning of condenser coil etc. complete as required.
Comprehensive Annual Maintenance contract and service charges for 1.5/2.0/4.0 TR Split/wndow/cassette/tower type AC units (i/c inverter technology based AC units) installed at Delhi Sachivalaya Building, New Delhi which includes supply and replacement of components found defective, servicing, repairing, rectification of condenser coil, cooling coil, thermostat relay, PCB, fan motor, electrical wiring, gas charging if found necessary including replacement / repairing of sealed compressors etc. complete as required. [Credit for the defective spares shall be included in the rate] - 140 Units
Comprehensive Annual Maintenance contract and service charges for 8.5 TR/11 TR Package/Ductable Air Conditioners installed at Delhi Sachivalaya Building, New Delhi which includes supply and replacement of components found defective, servicing, repairing, rectification of condenser coil, cooling coil, thermostat relay, PCB, fan motor, electrical wiring, gas charging if found necessary including replacement / repairing of sealed compressors etc. complete as required. [Credit for the defective spares shall be included in the rate] - 4 Units
Providing services of cleaning of grills, diffusers installed at Delhi Sachivalaya Building, New Deli in all room, corridors, Minister's room, AC Plant and AHU room from ground floor to 10th Level in all three wings (A,B & C), centre core (whole building) by providing 2 Nos. unskilled worker in general shift per day for 8 days per month as per additional condtions and direction of Engineer-in-charges etc. complete as required.
R S ENTERPRISES
Shree Krishna Enterprises
HONEY COLLECTION
M/S COOL RAYS
Supercool
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .