| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -31.31% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 L+₹17,700 (5.15%)Admitted-Finance | -27.77% | ₹3.6 L+₹17,700 (5.15%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 L+₹20,400 (5.94%)Admitted-Finance | -27.23% | ₹3.6 L+₹20,400 (5.94%) | L3 | Admitted-Finance |
| 4 | L4₹3.8 L+₹31,550 (9.19%)Admitted-Finance | -25.00% | ₹3.8 L+₹31,550 (9.19%) | L4 | Admitted-Finance |
| 5 | L5₹4.4 L+₹1.0 L (29.4%)Admitted-Finance | -11.10% | ₹4.4 L+₹1.0 L (29.4%) | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
4 Jun 2026, 6:00 pmClosed
xen cmd svp
kANGAN
Repair of damaged fencing and slope protection structures around power house and along canal at MHP Pahalgam
2026_SPDC_309837_3
CMD SVP K 04 of 2026
Open Tender
Civil Works
Percentage
45 days
pAHALGAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹415
CPAO PDC
₹10,000
dIVISIONAL OFFICE
9 Jun 2026
13 May 2026
6 Jun 2026
14 May 2026
4 Jun 2026
14 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 9.85 | cum | 940.3 | ₹9,261.96 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) | 1.27 | cum | 5,733.6 | ₹7,267.34 |
| 3 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of Approved steel primer all complete. Welded | 411 | Kg | 138.2 | ₹56,800.2 |
| 4 | Random Rubble masonry with hard stone in superstructure above
plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement: 6 coarse sand) | 30.24 | cum | 9,131.9 | ₹2,76,148.66 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets, sunken floor etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40 mm nominal size) | 0.36 | cum | 6,644.55 | ₹2,392.04 |
| 6 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade | 36.4 | Sqm | 852.05 | ₹31,014.62 |
| 7Carriage of materials: | |||||
| 7.1 | Cement avg 20 km | 7 | MT | 434.6 | ₹3,042.2 |
| 7.2 | Sand average 50km | 43 | Cum | 868.39 | ₹37,340.77 |
| 7.3 | Aggregate average 40km | 75 | Cum | 741.89 | ₹55,641.75 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.33 MB
BOQ_1002754.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .