Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.6 L
EMD Value
₹5,586
Closing Date
7 Dec 2026, 10:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Executive Engineer.,(Electrical), PWD
Electrical Division, Salem-636007
Provision of solar Panel arrangements to the Subdivision OSC building in Nallampalli at Dharmapuri in Dharmapuri District.
2026_PWD_728694_1
10/15/2026-27
Open Tender
Electrical Works
Percentage
30 days
Dharmapuri
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹5,586
20 Nov 2026
20 Nov 2026
7 Dec 2026
20 Nov 2026
7 Dec 2026
20 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 6KW (SOLAR PLANT)Supply, Installation, Testing, Commissioning and Handing over of 6KW Grid connected roof top Solar PV System Scheme complete as detailed below.Design, Engineering, Manufacturing, Procurement, Supply of materials to project site, project management, installation of mechanical equipment, cabling & appurtenances, instrumentation and electrical system and other equipment, as detailed in this section.Scope of the proposal for 6KW Grid connected roof top Solar PV Systema)Solar Modules (Multicrystalline-as per IEC specifications)b)Mounting Structure (Design to Chennai Coastal ambient condition)c) Inverter, distribution boards, junction boxes, cables, isolator & etc..,d) Earthing for Solar modules and invertere)Lightning Protectionf) Installation and commissioningg)Project managementh)Liasioning for approval from MNRETECHNICAL SPECIFICATIONS 1. SOLAR PV MODULES AND ARRAY(i) Only indigenous modules shall be used in the Solar module shall be Crystalline (Mono/Poly) (or) Thin Film (or) Concentrator PV modules type. The peak power output of the PV Module shall be min 100Wp under STC. Module Voc shall be minimum 21V. The total array capacity shall not be less than required capacity and this shall be operating at the required DC voltage. The power output of the PV module must be reported under standard test conditions (STC). I_V curve of the sample module should be submitted.(ii) The mechanical structure shall withstand gusts of wind / cyclonic wind up to 150km/hr from back side of the panel.(iii) The offered modules must conform to the latest edition of any of the following IEC/ equivalent BIS Standards for PV module design qualification and type approval:Crystalline Silicon Terrestrial PV Modules : IEC 61215/IS14286Thin Film Terrestrial PV Modules : IEC 61646/ Equivalent IS(Under Dev.)Concentrator PV Modules & Assemblies : IEC 62108(iv) In addition, the modules must conform to IEC 61730 1- requirements for construction & Part 2 - requirements for testing, for safety qualification or Equivalent IS ( Under Dev.)(v) PV modules must also qualify Salt Mist Corrosion Testing as per IEC 61701/IS61701.(vi) SPV modules shall be certified by NABL/IECQ accredited test centre. The bidder shall submit appropriate certificates.(vii) Protective devices against surges at the PV module shall be provided. Low voltage drop bypass diodes shall be provided.(viii) Module Junction box (weather proof), where the module terminals shall be interconnected and output taken, shall be designed for long life out door operation in harsh environment as per the relevant BIS specifications and protected against surges. It should have a provision for "Opening" for replacing the cable, if required.(ix) PV modules used in solar power plants must be warranted for output wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.(x) Each PV module must use a RF identification tag (RFID), which must contain the following information:a.Name of the manufacturer of PV Moduleb.Name of the manufacturer of Solar cellsc.Unique Serial Number & Model No. of the moduled.Month and year of the manufacture (separately for Solar cells and module)e. Country of origin ( separately for solar cells and module)f.. I-V curve for the moduleg. Peak Wattage of the module ,Im, Vm and FF for the moduleh. Date and year of obtaining IEC PV module qualification certificate i. | 1 | Each | 4,00,500 | ₹4,00,500 |
| 2 | Name of the test lab issuing IEC certificatej. Other relevant information on traceability of solar cells and module as per ISO 9000 seriesRFID shall be mandatorily placed inside the module laminate.A distinctive serial number starting with NSM will be engraved on the frame of the module or screen printed on the tedlar sheet of the module.1.1 ORIENTATION AND TILT OF PV MODULESModules shall be North -South oriented at the Tilt Angle of 11° 13''2. MOUNTING STRUCTURESThe PV modules will be mounted on fixed metallic structures of adequate strength and appropriate design, which can withstand load of modules and high wind velocities up to 200 km per hour. The support structure used in the power plants will be hot dip Galvanized Iron (G.I).The "Mounting Structure" should have the following features:• The modules support structure shall be Mild Steel /hot dipped Galvanized (atleast 120 micron) Iron for holding the PV modules. The size of angle iron should not be less than 50x50x5 mm.Each panel frame structure shall be so fabricated as to be grouted on roof on its legs.DETAILED SPECIFICATIONDC Array Input Operating Voltage : -20% to +15% of the DC Array input voltage in Sl.No. 1 aboveType of Solar Charge ControllerMPPT Based Solar Charge ControllerSwitching deviceMOSFET/IGBT basedOutput Wave Form:Pure Sine Wave OutputTotal Harmonic Distortion:< 3% with resistive loadOutput Voltage: 230+ 3 % in case of 1 phase PCU 400+ 3 % in case of 3 phase PCUOutput Frequency50 Hz. ± 0.5 Hz.Power Factor> 0.9PCU efficiency:> 90% at nominal voltage & powerIdle Current:< 4% of rated capacityRegulation:Line regulation & Load regulation - 2 %Overload Features:150% for 1 minuteCooling:Forced Air cooling, with temperature controlled cooling fanOperating temperature: 0 - 50 °CRelative Humidity:95% MaximumLED /LCD Display : IndicationsDisplay shall indicate system functional parameters and protection functional indicatorData monitor and display controlsRS485, Ethernet OR RS232 connectivityProtections1) Input over voltage2)Low/high frequency3) Short circuit4) Under/over output voltage5) Over Temperature6) Grid Input under voltage / over voltage with auto recovery7) DC disconnect device Anti Islanding Protection as per the standard IP 21 (for indoor) as per IEC 529Safety1. IEC 62103 2. IEC 62109 Part 1 & 2 3. Galvanic Isolation at input & output through transformer INVERTER: The power conditioning unit/inverter should be grid interactive and also DG set interactive if necessary. Inverter output should be compatible with the grid frequency.Nominal AC O/P voltage and frequency : 415V, 3-ph, 50HzAccuracy of AC voltage control Output frequency : +1%Output frequency : 50 HzAccuracy of frequency control : +0.1%Grid Frequency Synchronization range : +3HzMaximum Input DC Voltage : inverter DependantAmbient temperature considered : 40˚CHumidity : 95% Non condensingProtection of Enclosure : IP-20(Min) Indoor. IP-65(Min) OutdoorGrid Frequency Tolerance range : +3%Grid Voltage tolerance : -20% & +15%No-load losses : <1% of rated powerInverter efficiency(minimum) : >95% THD : <3% | 1 | Each | - | - |
| 3 | 5.DC & AC Switches a. DC SIDE(i) MCB of suitable rating shall be provided for connection and disconnection of array & PCU for maintenance purpose.(ii) Switches and Circuit Breakers on DC side shall be DC rated or they shall be sufficiently de-rated, if AC rated switches are used.b. AC SIDE MCB of suitable rating shall be provided for connection and disconnection of PCU & load 6. Cables and accessories All the cables shall be supplied conforming to IEC 60227/IS 694 & IEC 60502/IS 1554 shall be of 1.1 kV grade as per requirement. Only PVC copper cables shall be used. The size of the cables between array interconnections, array to junction boxes, junction box to PCU, PCU to AC Distribution Box etc shall be so selected to keep the voltage drop and losses to the minimum. Permissible Wire Drop on DC side shall be <= 1% The bidder shall supply installation accessories, which are required to install and successfully commission the power plant.7. Earthing and Lightning Protection:Earthing: The array structure of the PV yard shall be grounded properly using adequate number of earthing kits as per MNRE rules and regulations. All metal casing or shielding of the power plants shall be thoroughly grounded to ensure safety of the solar power plants.Lightning: The SPV power plants shall be provided with lightning &over voltage protection. The main aim in this protection shall be to reduce the over voltage to a tolerable value before it reaches the PV or other sub system components. The source of over voltage can be lightning, atmosphere disturbances etc8.INTEGRATION OF PV POWER WITH GRID:The output power from SPV would be fed to the inverters which converts DC produced by SPV array to the AC and feeds it into the main electricity grid after synchronization. In case of grid failure, or low or high voltage, solar PV system will be out of synchronization and will be disconnected from the grid. Once the DG set comes into service PV system will again be synchronized with DG supply and load requirement would be met to the extent of availability of power 4 pole isolation of inverter output with respect to the grid/DG power connection need to be provided. | 1 | Each | - | - |
| 4 | 9.GRID ISLANDING:PV system software and control system will be equipped with islanding protection. In addition to disconnection from the gird (islanding protection i.e. on no supply), under and over voltage conditions will adequate rating fuses, fuses on inverter input side (DC) as well as output side (AC) for overload and short circuit protection and disconnecting switches to isolate the DC and AC system for maintenances as needed. Fuses of adequate rating will also be provided in each solar array module to protect them against short circuit. A manual disconnect 4 pole isolation switch beside automatic disconnection to grid would have to be provided at utility end to isolate the grid connection by the utility personal to carry out any maintenance.10.OPERATION AND MAINTENANCE MANUALAn Operation and Maintenance Manual, in English and Tamil, should be provided with the solar PV power plants.The following minimum details must be provided in the Manual:About Photo Voltaic & PV Module Clear instructions about mounting of PV module.About electronics used inDO's and DONT's,Clear instructions on regular maintenance and Trouble Shooting of the power plants.Name & address of the person or Centre to be contacted in case of failure or complaint.The equipment/materials and the whole system should be operated by trained personnel of the purchaser after giving training.The periodical maintenance, cleaning of the Solar Panels should be done by the firm/Supplier/Contractor for a period of five years.Solar Net Metering arrangements to be implemented for existing Tangedco Service connection meter need to be replaced that can measure Both energy imports (from the grid to consumer) and energy export (from the consumer to Grid) | 1 | Each | - | - |
| 5 | The legs of the structure shall be fixed and grouted in the PCC foundation column made with 1:2:4 cement concrete. The foundation shall support SPV modules at a given orientation, absorb and transfer the mechanical loads to the ground properly and shall withstand maximum wind speed of 200 km/hrAll nuts and bolts should be made of good quality Stainless Steel.The structure should be designed to allow easy replacement of any module.The array structure shall be so designed that it will occupy minimumspace without sacrificing the output from the SPV panels.The minimum clearance of the lowest part of the module structure and the developed ground level shall not be less than 500 mm.The minimum clearance required from the parapet wall of the roof & in between row of panels is min 2 feet for cleaning the panels & servicing.The bidder shall specify installation details of the PV modules and the support structures with appropriate diagrams and drawings. The workshall be carried out as per the designs approved by the procuring entity.3. JUNCTION BOXESThe junction boxes shall be dust proof, vermin and waterproof and made of FRP / Thermo Plastic. The terminals shall be connected to copper bus bar arrangement of proper sizes. The junction boxes shall have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and outgoing cables. Suitable markings shall be provided on the bus bar for easy identification and cable ferrules shall be fitted at the cable termination points for identification. Each main junction box shall be fitted with appropriate rating blocking diode. The junction boxes shall be of reputed make.4. POWER CONDITIONING UNIT (PCU)The PCU shall also house MPPT (Maximum Power Point Tracker), an interface between Solar PV array & the Inverter, to maximize Solar PV array energy input into the System. PCU including MPPT & protection conform to IEC 61683/IS 61683, IEC 60068-2(1,2,14,30)/Equivalent BIS Std.,11.Grid – Tie Solar PV Systemi)Solar PV Modulesii)Structure for mounting modulesiii)Invertersiv)Cabling to PV module to Inverter12.WARRANTY (i) Solar panel at 90% efficiency- 10 years (ii)Solar panel at 80% efficiency- 25 years (iii)All other equipments - 5 yearsWARRANTIES & GUARANTIEES:The goods supplied under this contract are new, unused, of the most recent or latest technology and incorporate all recent improvements in design and materials. This warrantee will also be covering the rectification of any and all defects in the design of equipment, materials and workmanship including spare parts for the guarantee period specified by MNRE/ TEDA from the date of commissioning. All the Guarantees / Warrantees of the different components will be transferred to Owner of the project. 13. Make of the Components (i)Indigenous MNRE approved Multi Crystallinemodules-TataPower/Emvee/Alpex/Su-KaM/ Vikram/Equivalent.(ii)ON grid Inverter (PCU) – Refusol /SMA | 1 | Each | - | - |
| 6 | Supply and fixing of 63A FP MCB in Metal box DP enclosure flush with wall and making good of the concealed portion with earth connection. | 1 | Each | 2,561 | ₹2,561 |
| 7 | Supply & Clamping of 4 x 6 sqmm PVC LTUG Armourd copper cable on wall with ms clamp. | 33 | Metre | 788 | ₹26,004 |
| 8 | Supply and Installation of Stainless Steel 304 grade Test Joint with enclosure to interconnect between 8 mm Al. round conductor to 10 mm copper bonded round conductor.
Test Parameter:
Salt Spray Test for test joint plate - No sign of Corrosion Tested as per IEC 62561-1 | 1 | Each | 5,500 | ₹5,500 |
| 9 | Supply and Installation of Rust resistant non corossive 10 mm dia Copper Bonded Steel round conductor used for Earth termination inside the concrete and soil.
Test parameter:
a) Short circuit current test for copper bonded conductor:Test 6 kA ratings, as per cross sectional area for 1 sec (IS3043/IEEE80);
b)Electrical Resistivity before & after salt mist spray test: 0.25µΩm max.
c)Tensile Test 290 to 510 N/mm².
d)Adhesion no peel or crack & Bend test no seperation of Cu,
e)Cu Coating thickness min. 70µm.
Tested as per IEC 62561-2. | 6 | Metre | 250 | ₹1,500 |
| 10 | Supply and Installation of Stainless steel SS 304 Grade Conductor Holder for fixing the 8 -10 mm dia round conductor on the wall .
Test Parameter:
a) Mechanical Load
b) Environmental Test
Tested as per IEC 62561-4 | 5 | Each | 150 | ₹750 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
eTendercondition146.pdf
Tender Documents • 0.57 MB
BOQ_874506.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .