| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.8 LAccepted-Finance | ₹77.8 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹82.2 LRejected-Finance | ₹82.2 L | L2 | Rejected-Finance Non Responsive |
| 3 | L3₹90.9 LRejected-Finance | ₹90.9 L | L3 | Rejected-Finance Non Responsive |
Tender Value
₹1.1 Cr
EMD Value
₹7.3 L
Closing Date
5 May 2026, 12:00 pmClosed
Superintending Engineer
SE BDN/PBT Circle PWD Bareilly
Construction of 16 capacity hostel/barrack and 01 investigation room in Sungadhi police station of Pilibhit district in the financial year 2025-26
2026_CEBLY_1142816_3
2834/533C(ET)-08/2025-26 Date 30.03.2026
Open Tender
Civil Works - Buildings
210 days
Pilibhit
Construction of 16 capacity hostel/barrack and 01 investigation room in Sungadhi police station of Pilibhit district in the financial year 2025-26
3 documents required · 3 mandatory
₹2,714
₹7.3 L
Yes
Bareilly
14 May 2026
27 Apr 2026
5 May 2026
27 Apr 2026
5 May 2026
27 Apr 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for dtructure as per drawing and technical specification including setting out, construction shoring and bracing removal of atumps and other deleterious and disposal upto lead of 50m dressing of sides and bottam and backfilling in trenches with excavated with excavated suitable material. DSR 2.6.1 | 294.32 | Cum | 122 | ₹35,907.04 |
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR 2.25a | 195.01 | Cum | 482 | ₹93,994.82 | |
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, ramming, dressing etc rate to include cost of all materials, labour and T & P etc required for proper completion of the work. DSR 2.27 | 17.9 | CUM | 1,461 | ₹26,151.9 | |
Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. DSR 4.1.8 | 30.5 | CUM | 4,687 | ₹1,42,953.5 | |
Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm
(4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. DSR 2.35.3.1 | 113.92 | SQM | 213 | ₹24,264.96 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Footing foundation excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. DSR 5.1.2 | 29.91 | CUM | 6,224 | ₹1,86,159.84 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Plinth Beam excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item DSR 5.1.2 | 9.09 | CUM | 6,224 | ₹56,576.16 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Column excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item DSR 5.2.2 | 18.95 | CUM | 7,468 | ₹1,41,518.6 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Lintel excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item DSR 5.3 | 6.52 | CUM | 7,917 | ₹51,618.84 | |
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Projection excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item DSR 5.3 | 5.06 | CUM | 7,917 | ₹40,060.02 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2134380.xls
BOQ • 0.42 MB
T2.pdf
Tender Documents • 1.50 MB
Download all tender documents and submit your bid