Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
31 Mar 2021, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer STD udhampur
Rate Contract for Store handling and Fabrication
2021_PDD_119747_1
02 0f 2021-22
Open Tender
Miscellaneous Services
Item Rate
15 days
udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer STD Udhampur
₹20,000
17 Apr 2021
8 Mar 2021
2 Apr 2021
9 Mar 2021
31 Mar 2021
9 Mar 2021
Amount
FABRICATION OF ANGLE IRON BRACES /BELTS/GUARDNETTING ANGLES ,FENCING POSTS ETC FROM ANGLE IRON OF SIZES
FABRICATION OF GUY RODS COMPLETE INCLUDING TURN BUCKLE ,STANING SCREW ,ANCHOR PLATES,THREADDING OF GUYS AND STANING SCREW
FABRICATION OF CHANNEL CROSS ARMS OF SORTS FROM MS CHANNEL 100X50X6
FABRICATION OF FI TIES ,FI CLAMPS FROM MS FLAT (SUITABLE FOR 9MTR,11 MTR AND 13 MTR POLES)
FABRICATION Of EARTHING PLATES , CABLE DUCT COVER FROM MS PLATE as per REC Drawings
FABRICATION OF EARTHING SPIKES FROM MS TOR STEEL OF SORTS AS PER REC DRAWINGS
Drilling of holes in ST POLES
FABRICATION OF FOUNDATION BOLTS FROM MS TOR STEEL INCLUDING THREADDING AS PER REC DRAWINGS
FABRICATION OF EARTHING PIPE FROM GI PIPE AND WELDING OF EARTHING PLATE AS PER REC DRAWINGS
FABRICATION OF COLUMN STRUCTURES , BEAM STRUCTURE , ISOLATOR STRUCTURES ,LA ,CT ,PT AND PI STRUCTURES AS PER DRAWINGS
Unloading of ST Poles 9mtr including carrige towards stacking site and stacked properly
Unloading of ST Poles 11 mtr including carrige towards stacking site and stacked properly
Unloading of ST Poles 13 mtr including carrige towards stacking site and stacked properly
Unloading of ACSR Dog conductor including carrige towards stacking site and stacked properly
Unloading of ACSR wolf conductor including carrige towards stacking site and stacked properly
Unloading of ACSR conductor scrap including carrige towards stacking site and stacked properly
Unloading of 11 KV VCB/OCB pannels ( 1+3) /(1+4)including carrige towards stacking site and stacked properly
Unloading of 11 KV VCB/OCB pannels including carrige towards stacking site and stacked properly
Unloading of AC Board/DC Board/Battery Bank/Battery Charger including carrige towards stacking site and stacked properly
Unloading of 33 KV VCB including carrige towards stacking site and stacked properly
Unloading of 33 KV C&R Pannels including carrige towards stacking site and stacked properly
Unloading of XLPE Cable 120/185 mm² including carrige towards stacking site and stacked properly
Unloading of XLPE Cable 240/300 mm² including carrige towards stacking site and stacked properly
Unloading of XLPE Cable 400/630 mm² including carrige towards stacking site and stacked properly
Unloading of Guy/GI wire /Barbed wire/Control cable including carrige towards stacking site and stacked properly
Unloading of Power Transformer 3.15/4 MVA including carrige towards stacking site and stacked properly
Unloading of Power Transformer 5/6.3 MVA including carrige towards stacking site and stacked properly
Unloading of Power Transformer 10 MVA including carrige towards stacking site and stacked properly
Unloading of Distribution Transformer including carrige towards stacking site and stacked properly
Unloading of Transformer oil Barrels including carrige towards stacking site and stacked properly
Unloading of MS Angle,MS Channel,MS Tor steel, MS Flat including carrige towards stacking site and stacked properly
Unloading of hardware items such as nuts and bolts ,clamps of sorts,washers etc including carrige towards stacking site and stacked properly
Unloading of 33 KV Disc insulators including carrige towards stacking site and stacked properly
Unloading of Disc fittings including carrige towards stacking site and stacked properly
Unloading of 33 KV pin insulators with Pins including carrige towards stacking site and stacked properly
Unloading of Cement including carrige towards stacking site and stacked properly
Unloading of 33 KV KV CT /PT units including carrige towards stacking site and stacked properly
Unloading of 11 KV KV CT /PT units including carrige towards stacking site and stacked properly
Unloading of 33 KV Isolators including carrige towards stacking site and stacked properly
Unloading of 33 KV LA s including carrige towards stacking site and stacked properly
Unloading of11 KV Isolators including carrige towards stacking site and stacked properly
Unloading of 1 KV LAs including carrige towards stacking site and stacked properly
Loading of ST Poles 9mtr including carrige from stacking site
Loading of ST Poles 11 mtr including carrige from stacking site
Loading of ST Poles 13 mtr including carrige from stacking site
Loading of cement including carrige from stacking site
Loading of ACSR Dog conductor including carrige from stacking site.
Loading of ACSR Wolf conductor including carrige from stacking site.
Loading of ACSR Scrap including carrige from stacking site.
Loading of 11 KV VCB/OCB (1+3)/(1+4)pannels including carrige from stacking site
Loading of 11 KV VCB/OCB pannels including carrige from stacking site
Loading of AC Board/DC Board/Battery Bank/Battery Charger including carrige from stacking site .
Loading of 33 KV VCB including carrige from stacking site
Loading of 33 KV C&R Pannels including carrige from stacking site
Loading of XLPE Cable 120 /185 mm² including carrige from stacking site
Loading of XLPE Cable 240/300 mm² including carrige from stacking site
Loading of XLPE Cable 400/630 mm² including carrige from stacking site
Loading of Guy/GI wire /Barbed wire/Control cable including carrige from stacking site
Loading of Power Transformer 3.15/4.0 MVA including carrige from stacking site
Loading of Power Transformer 5/6.3 MVA including carrige from stacking site
Loading of Power Transformer 10 MVA including carrige from stacking site
Loading of Distribution Transformer including carrige from stacking site
Loading of Transformer oil Barrels including carrige from stacking site
Loading of MS Angle iron braces,MS Channelcross arms, guy rods etc including carrige from stacking site
Loading of hardware items such nuts and bolts ,clamps of sorts,washers including carrige from stacking site
Loading of 33 KV Disc insulators including carrige from stacking site
Loading of 33 KV Disc fittings including carrige from stacking site
Loading of 33 KV Pin insulators with Pins including carrige from stacking site
Loading of 33 KV Isolators including carrige from stacking site
Loading of 33 KV LA s including carrige from stacking site
Loading of 11 KV Isolators including carrige from stacking site
Loading of 11 KV LA including carrige from stacking site
Carrige of Fabricated column,Beam,Isolator structure,PI,LA ,CT,PT structure etc towards stacking site and stacked properly
Loading of Fabricated column,Beam,Isolator structure,PI,LA ,CT,PT structure etc including carrige from stacking site
Loading of 33 KV CT /PT units including carrige from stacking site
Loading of 11 KV CT /PT units including carrige from stacking site
Shifting of material formaking space for proper stacking of material
Carrige of fabricated material from fabrication site towards stacking site and proper stacking of material
Labour Charges for Painting of MS angles, STpoles,channel iron ,gantry structures etc.
ADITYA SHARMA
C L Associates
M/S S AAA ASSOCIATES
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .