Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC NORTH TRIKARIPUR | THRISSUR | KERALA | 679105 | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.3 L+₹166 (0.03%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.3 L+₹2,790 (0.44%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹6.4 L+₹12,080 (1.92%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹6.7 L+₹39,785 (6.33%)Rejected-Finance DEVOM KADAVATH POLLAPOIL PALAMUKKU KODAKKAD PO KASARGOD 671310 KERALA | KASARAGOD | KERALA | 671310 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | mvkunhikoran L1 | Jayakumar V V L5 | Manoj Varkey L4 | E RAVEENDRAN L2 | Sinoj M George L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00BUILDING BALANCE WORK AND COMPOUND WALL | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 28.2 | cum | 295.5 ₹8,334.28 Lowest | 300 ₹8,461.2 | 308.17 ₹8,691.63 | 295.75 ₹8,341.33 | 296.78 ₹8,370.38 |
| 1.00 | OD293954/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest
size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 29.28 | cum | 3,798.42 ₹1,11,232.93 Lowest | 4,800 ₹1,40,563.2 | 4,875.41 ₹1,42,771.51 | 5,036.5 ₹1,47,488.87 | 5,048.58 ₹1,47,842.62 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.73 | cum | 6,516.51 ₹4,744.02 | 6,500 ₹4,732 Lowest | 6,832.07 ₹4,973.75 | 6,529.25 ₹4,753.29 | 6,544.86 ₹4,764.66 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.04 | cum | 8,616.06 ₹60,631.21 | 8,500 ₹59,814.5 Lowest | 8,985.42 ₹63,230.4 | 8,633.62 ₹60,754.78 | 8,653.55 ₹60,895.03 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 49.38 | sqm | 317.21 ₹15,663.83 Lowest | 380 ₹18,764.4 | 330.81 ₹16,335.4 | 317.62 ₹15,684.08 | 318.58 ₹15,731.48 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 548.58 | kilogram | 92.35 ₹50,661.36 | 100 ₹54,858 | 96.32 ₹52,839.23 | 91.87 ₹50,398.04 Lowest | 92.75 ₹50,880.8 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 159.34 | sqm | 303.74 ₹48,397.93 | 320 ₹50,988.8 | 318.45 ₹50,741.82 | 303.62 ₹48,378.81 Lowest | 305.06 ₹48,608.26 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 9.36 | sqm | 260.66 ₹2,439.78 Lowest | 320 ₹2,995.2 | 271.83 ₹2,544.33 | 260.75 ₹2,440.62 | 261.79 ₹2,450.35 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 348.64 | kg | 146.57 ₹51,100.6 | 180 ₹62,755.74 | 152.86 ₹53,293.57 | 146.12 ₹50,943.72 Lowest | 147.2 ₹51,320.25 |
Tender Value
₹7.2 L
EMD Value
₹17,985
Closing Date
23 Sept 2025, 5:00 pmClosed
Assistant Engineer
Office of the Assistant Executive Engineer LID EW Sub Division Nileswaram
Annual Plan-2025-26-NBP Allied works and compound wall construction for Pulikkund Community Hall in Kayyur-Cheemeni GP.-Pro No-23/25-26
2025_LSGD_797357_14
01/AE/LIDEW/NBP/25-26
Open Tender
Civil Works - Buildings
Item Rate
270 days
LID EW Sub Division Nileswaram
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,590
Yes
₹17,985
Yes
24 Oct 2025
16 Sept 2025
24 Sept 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1322351.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .