| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder |
| 2 | L2₹1.3 CrRejected-AOC CHANDAN NAGAR OPP IOCL PETROL PUMP RAMPUR ROAD BAREILLY UP PIN 243001 | BAREILLY | UTTAR PRADESH | 243001 | ₹1.3 Cr | L2 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 3 | L3₹1.5 CrRejected-AOC | ₹1.5 Cr | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 4 | L4₹1.6 CrRejected-AOC | ₹1.6 Cr | L4 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 5 | Not Admitted-Fee | - | - | Not Admitted-Fee Fee not received |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
24 Jun 2024, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
Running Contract for Deposit Works under EDD-II, Bareilly
2024_MVVNL_926506_1
02/EDCB/2024-25
Open Tender
Electrical Works
365 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹5,900
SE,EDC
₹1.4 L
29 Dec 2025
8 Jun 2024
25 Jun 2024
8 Jun 2024
24 Jun 2024
8 Jun 2024
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-II, Bareilly. Approx. distance upto 80 Km. Including safe loading and unloading.
PCC Pole 8.5 meter long.
STP 9 Mtr Long
STP 11 Mtr Long
Other Line material (Except Pole) i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE/LT XLPE Cable etc
11/0.4 KV 1 Phase 10/16 KVA T/F
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 400 KVA T/F
11 KV Pilfer proof Metering cubical and CT PT Unit
33 KV Pilfer proof Metering cubical and CT PT Unit
33 KV Line Isolator 800 Amp
33 KV VCB 800 A, 750 MVA
33 KV Control Panel for Single Transformer
33 KV Control Panel for Double Transformer
11 KV Bus Cupler
33 KV CT 200/100/1-1A
33 KV Lightening Arrestor
Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr Long Single Pole
PCC Pole 8.5 Mtr Long Double Pole
ST Pole 9 Mtr Long Single Pole.
ST Pole 9 Mtr Long Double Pole.
ST Pole 11 Mtr Long Single Pole.
ST Pole 11 Mtr Long Double Pole.
Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5 Mtr Long Single Pole
PCC Pole 8.5 Mtr Long Double Pole
ST Pole 9 Mtr Long Single Pole.
ST Pole 9 Mtr Long Double Pole.
ST Pole 11 Mtr Long Single Pole.
ST Pole 11 Mtr Long Double Pole.
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Dismantling of Old and damaged conductor complete in all respect
Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect
Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 400 KVA T/F
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
ACSR Rabbit Conductor
ACSR Dog Conductor
3 Phase Arial Bunched Conductor
1 Phase Arial Bunched Conductor
LT XLPE 1x630 Sqmm
LT XLPE Cable 3.5x70 sqmm
After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand form Double Pole to metering room complete in all respect. Alongwith filling of cable jointing kits
After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand form Double Pole to metering room complete in all respect. Alongwith filling of cable jointing kits
Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of cable jointing kits
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect. Alongwith filling of cable jointing kits
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
Hoisting of Following size 11 KV & 33 KV XLPE Cable on double pole with GI pipe of size 6 " dia 4 Mtr long including the jumpering complete with clamps , nut and bolts.
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
Filling of 11 KV Outdoor Cable Boxes For 3x185 sqmm XLPE Cable
Supply & Laying of 6" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6" would be Provided by contractor at his own cost)
Supply & Laying of 140 mm OD PN-4 PE-80 Grade UV Sabilized HDPE Pile as per IS 4984 in 6 meter (would be Provided by contractor through approved vendors of Discom at his own cost)
Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect All manpower, material and T&P provided by the contractor to complete the work.
Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Installation of 11 KV Fuse Set
Fixing of 11 KV TPMO
Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect
Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect
Installation of LT Incoming Panele with metering eauipment & fixing arrangement for LT Circuit Deistribution complete in all respect as per norms
Mounting of Following Capacity Transformers as per norms complete in all respect -
10/16 KVA T/F
25 KVA T/F
63 KVA T/F
100 KVA T/F
250 KVA T/F
400 KVA T/F
Fixing of Distribution Box complete in all respect
Guarding at road crossing complete in all respect
Fixing of Following Material as per Norms complete In all respect
33 KV Line Isolator 800 Amp
33 KV VCB 800 A, 750 MVA
33 KV Control Panel for Single Transformer
33 KV Control Panel for Double Transformer
11 KV Bus Cupler
33 KV CT 200/100/1-1A
33 KV Lightening Arrestor
Plinth & Foundation for 33 KV VCB as per norms complete in all respect
Supply & Fixing of Following Items to complete the work (Provided by the contractor through approved vendon of Discom/UPPCL, If Not available in stores)
LT Clamps as per RESSPO Norms for PCC/ST pole
Nut & Bolt off size
F Clamp as per RESSPO Norms
Shackle Insulator as per RESSPO Norms
X-Arm Holding Clamp as per RESSPO Norms
Holding Clamp For T-Off
Holding Clamp For G I Pipe
Clamps with Nut & Bolt for Top & Dropper Channel
Stay Clamps as per RESSPO Norms
11 KV Composite Polymer Disc insulator as per RESSPO Norms
Top Channel of size 100x50x2240 mm as per RESSPO Norms
T off Channel as per RESSPO Norms
11 KV Pin Insulator as per RESSPO norms
11 KV Pin Insulator with Pin & Nut as per RESSPO norms
11 KV Pin with Nut as per RESSPO norms
11 KV Disc Insulator With Fitting
Stone Pad
11 KV Steel X Arm V-Type
Danger Board
Danger Board Barbed Wire Including Jumper
Aluminium Paint
Red Oxide Paint
Barbed Wire
LT Shackle Insulator
PG Clamp
11 T-Off (125x65x1300mm)
11 KV Disc Fitting With Insulator (45 KN (T&C Type)
Guarding Angle 65x65x6 mm 1.6 Mtr Long
Clamp For Guarding Angle with Nut & Bolt
GI Wire 6 SWG & 10 SWG For Guarding & Lacing
Nut & Bolt with Washer
MS Angle Iron 65x65x6 mm, 2700 mm long Bracing with 4 Clamp
J-Huck
Suspenstion Clamp
Piercing Connector
Al Lug 630 Sqmm
Safe back carriage of Scrap (if any) from work site to C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading.
Safe back carriage of Distribution Transformer from work site to C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading.
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 400 KVA T/F
Cutting of Tree Branches
BHARAT ELECTRICAL TRADERS
ASTHA TRADERS
NATIONAL CONTRACTOR & GENERAL ORDER SUPPLIER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid